1.Generalization
SPJ150 automatic pressurized intermittent batch pre-expander is newly designed and made
by our company according to the latest international and domestic marketing
requirements,used for first and second expansion. This type of EPS machine is an
automatic expanding system, composed of pressurized batch pre-expander, fluidized bed
drier, sieving, delumpling ,screw conveyor and etc making an fully automatic cycle foam
system. It is an essential machine for EPS factory.
Expanded EPS beads through aging under normal pressure can be provided for EPS
molding machine to make different shapes of packing products as well as different sized
blocks. They are ideal packing materials for household appliance, gauges, instruments,
chinaware, glassware and all sorts of valuable and fragile things. Blocks can be used in
house construction, cars, ships, refrigerators etc, because they are good material of sound
insulation, heat insulation and vibration proof.
Main features:
1. Use PLC control system to fulfill automatic working
cycle.
2. Pipe system is simple, which is convenient for
maintaness and repair.
3. Using a 2.2kw mortor for filling and discharging
makes the filling and discharging much faster than before and reduces energy
consumption.
4. The applying of screw conveyer for filling and
electronic weighting scale relieves working density and improves the production
efficiency.
Date/Issure10.04 1
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 2
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Compressed Working
4
air Mpa 0.6-0.8
pressure
Upper drainage mm DN 80
5 Draining port
Lower drainage mm DN 80
Main axis motor kW 7.5
Discharging motor kW 2.2
Drying motor kW 5.5
Transporting blower kW 5.5
Connected
6 De-lumping motor kW 0.55
load
Vibration motor kW 0.18
First filling motor kW 2.2
Second filling motor kW
Secondary
foaming / 600Kg/h
efficiency
7
12 g/l 600Kg/h
First foaming 15 g/l 900 kg/h
efficiency
20 g/l 1200 kg/h
30 g/l 1500 kg/h
8 Density tolerance within 3%
9 Dimension (lwh) M 431041505120
Date/Issure10.04 3
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
10 weight T 5
Note: 1.With the constant development and improvement of machine technique, machine
structure and accessories may have some difference from that on operating
instruction, We keep the right of changing and explaining.
2.If you found the annex not match with the packing list in machine acceptance or there are
questions about operation, please contact with the QC department of our company.
You should send us main specifications and serial number and so on.
3. Company reserves the final interpretation of the company's products.
Date/Issure10.04 4
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 5
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 6
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
1. Check oil lubricator, keeping enough 10# engine oil (must use light oil) in it.
2. Check steam pipe and compressed air pipe. Fill compressed air in machine, open all
solenoid valves with touch screen. Check whether NO, NC valves are compliant with
piping diagram.
3. Adjust steam pressure relief valve, making its outlet pressure 0.12Mpa. Open steam valve
via touch screen, check whether valve outlet pressure is steady. When pressure comply
with set value, tighten the adjusting screw.
4. Adjust compressed air pressure gauge upper limit to 0.75Mpa, lower limit to 0.45Mpa,
pressure gauge on chamber upper limit 0.05Mpa (chamber protective pressure).
Date/Issure10.04 7
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 8
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
12.You can select manual, single step, semi-auto and auto on touch panel. Usually manual is
for testing actions of all valves, motors and level sensors. Single step and semi-auto are for
adjusting expanding density, while auto is for automatically running.
7. Touch screen
Date/Issure10.04 9
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 10
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 11
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 12
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 13
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 14
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 15
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 16
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 17
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Date/Issure10.04 18
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
8.Electrical diagrams
9.Pipe system
Date/Issure10.04 19
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
10.Machine Maintenance
1. Clear all material in expansion chamber and in fluidized bed drier before every shift ends.
2. Cut off power supply of screw conveyor, electronic scale, fluidized bed drier and
preexpander.
3. Close compressed air and steam valves.
4. Everyday before working, check chamber to remove lumps and other objects, and check
agitating rods.
5. Everyday before working, check air filter and oil lubricator. Remove water in filter and add
oil (light engine oil) in lubricator if necessary, usually add to 2/3 of the cup.
6. Check vent port and trap to remove blocks. Make sure water flow out of drain port when
Date/Issure10.04 20
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
working.
7. Often check actions of pressure gauge, temperature gauge, current gauge, volt gauge and
motors. If finding breakage or malfunction, change or repair immediately, ensuring their
reliability and sensitivity.
8. Often check all valves and pipes, especially copper tube of safety valve and pressure gauge
switch. Before machine delivery, safety valve is set to 0.5Mpa, usually users neednt adjust
again, but every week manually test it in case of malfunction. Pressure of expansion
chamber is controlled by pressure gauge switch, while copper tube is the connection
between chamber and pressure gauge switch. So once copper tube blocked, pressure gauge
switch cannot display chamber pressure correctly and cannot control pressure correctly,
easy to cause chamber breakage. In view of the importance of copper tube, try to protect it
carefully, especially in winter days since it is easy to break in cold area.
9. Check electronic scale periodically, if its not precise, ask professional person to adjust or
repair it.
10.Check earth connection periodically.
11.Often check sealing of 80 butterfly valve on filling port and vent port. Remove sealing
immediately when finding breakage or leakage.
12.Keep windows clean and no dust, otherwise, sensitivity of level sensor will be influenced.
Date/Issure10.04 21
OPERATING INSTRUCTION
SPJ-150 Batch Pre-expander
Discharge gate is locked by air cylinder, air pressure decrease will cause gate open. To run
machine normally, compressed air pressure should be ensured.
3. Before reparation, main power must be cut off. After repairing, remember to take all tools
and accessories out of machine, since they tend to break steam plate and plough plate in
chamber.
4. When producing, prevent objects (small stones or iron chips) from entering in chamber
with material, since they are easy to break steam plate.
5. In producing, often check sensitivity of pressure gauge switch, repair or change in time
when finding problems.
6. Machine warning light on in following cases:
A. motor overload, thermal relay released
B. no material for filling in loader
C. discharge gate switch not in right position
D. compressed air pressure lower than set value of pressure gauge switch.
E. Expansion chamber pressure higher than set value of pressure gauge switch.
Date/Issure10.04 22