COMMENT CONTROL SHEET

PROJECT: RPLC DEEP CONVERSION


DOC. No. V-SIE-EL001-COMMON-049-D
SIEMENS DOC. No. (4)G65076-D1001-403-D
DOCUMENT TITILE Busbar and coupling Protection Panel Drawings
REVISION D DATE 3/28/2014

Comment HYUNDAI-WISON Close-out


No. Sheet No. HYUNDAI-WISON Comment SIEMENS Reply
by Confirmation Status

Clarification shall be made below point


regarding to the Q0 open command from
PSCS.

This is the open command from PSCS


without through going Local/Remote
selector switch on the GIS local. Noted, this command will be removed from
1 13 H. Shimizu RCP drawings.
On the other hand, GIS Circuit diagram SIE-
EL001-COMMON-028 Rev B Sheet MA1
includes PSCS off command as well
through Local/Remote selector switch. It is
an operator confusing logic, which shall be
clarified by Siemens/HIWIN and corrected.
Typical Comment
If wiring to be connected with external
panels provided by Contractor, please state
"By
2 13 W. S. Park contractor" . See comment N 1.
We will inform you the name of panel and
number of terminals.
Siemens shall incorporate it on this
drawing.

SIEMENS/HIWIN shall verify following


points

1) F201 is power supply status signal for Siemens confirm that this signal is wired to
the DC125V supply for F023 51/51 relay. RCP only for sent it to the system, this signal
2) On the other hand F006 is A Bus A could be wired to any relay of A bus or B bus,
phase bus differential relay.
3 23 H. Shimizu it is not neccesary for 87B function. This
3) SIEMENS/HIWIN shall verified and signal is wired in order to inform to the
confirm that out of service of A bus system that Main protection (F023) is out of
specific relay of F002 does not impede the service.
proper function
(control/indication/protection) of B bus
especially F023 which is for both of A bus
and B bus.