Tunu Field Network Optimization

By Zulfah
TOTAL E&P INDONESIE

Abstract Pigging optimization


Planning optimization
Tunu gas field located in Mahakam Delta area has Compressor planned maintenance is scheduled so
been expanded from first development phase consisted that other jobs such as pigging are being performed
of two GTSs (Gathering and Testing Satellite) in high in hidden time to minimize shortfall. Compressor
pressure mode (HP) into current 29 GTSs with total 49 shut down leads to problem in potential recovery of
trunklines and cumulative distance nearly 340 km. This the wells, especially those categorized as very
giant field is still being developed as now it is operating sensitive and super very sensitive wells. Therefore,
in medium pressure mode (MP) towards low pressure any unplanned compressor major shut down is
mode (LP). It is produced by dividing production area being recorded and analyzed. Several
into Tunu South and North in which each area has its recommendations coming from root cause
own compression platform. In Tunu North, MP well investigation are followed up and monitored in their
effluent is delivered from 12 GTSs to NPU (North applications in order to avoid any shut down
Processing Unit) via 20 and 24 trunklines while in Tunu occurred by same or similar causes.
South, effluent was delivered from 17 GTSs to CPU
(Central Processing Unit) via 30 and 36 trunklines. Introduction
However, since February 2008, 30 trunkline is being
used for new producing field Sisi Nubi which operates in Since discovery, giant Tunu gas field has evolved
HP mode so that Tunu South GTS effluent is delivered production in high pressure (HP) mode. First three
by single 36 pipeline. phases focused on development of Tunu South area,
followed by Tunu North development started on fourth
Intensive development in Tunu network and change phase. Gas is produced through wellhead platforms
in well behavior as a consequence of more mature field which connected to Gathering and Testing Satellites
have demanded strategies to answer challenges of (GTS) and delivered to treatment facilities. Currently,
maintaining and increasing production of the field there are 29 GTSs spread throughout the field with
including current HP gas produced from Sisi Nubi. nearly 340 km cumulative distance of 49 trunklines, a
Efforts to answer these challenges are but not limited to: significant development from initially two GTSs. (Figure
Network optimization 1)
Complicated pipeline network is optimized by Following reservoir depletion, compression facilities
leaving no idle line on the network. A balance line are installed on both areas to allow production of
connecting Tunu South and North allows optimum depleted wells in medium pressure (MP) mode. In Tunu
production from both areas by routing several GTS South, well effluent of all 17 GTSs is collected in two
production in South to North via 20 and 24 jumper manifold platforms before delivered through 30 and 36
line. Another strategy is to route high pressure Sisi trunklines to TCP (Tunu Compression Platform) located
Nubi gas to North so that South production can be in CPU (Central Processing Unit). Meanwhile, Tunu
maximized into 30 and 36 pipeline. North well effluent from 12 GTSs is delivered to NCP

IATMI 08-012 1
Ikatan Ahli Teknik Perminyakan Indonesia

(North Compression Platform) located in NPU (North Pigging Optimization


Processing Unit) through 20 and 24 trunklines. Treated
gas from both sites is exported through 32 pipeline to Complexity of Tunu Network is also a challenge to
TRF (Terminal Receiving Facilities) in Badak. implement proper pigging strategy of the pipelines.
Condensate from both sites is delivered to CSU Several critical pipelines have to be carefully handled
(Condensate Stabilization Unit) in Senipah for treatment during pigging operation due to potential high slug
before exported. formation. Severe liquid slugging may lead to
Complexity of Tunu increases following new gas compressor shut down due to high level in slug catcher
fields Sisi Nubi is put on production in HP mode since at compression area. Therefore, pigging strategy and
February 2008. Effluent from this field is delivered to guidelines are implemented to avoid slugging and also
treatment facility located in CPU by using 30 trunkline, minimize gas shortfall.
leaving only 36 trunkline to accommodate Tunu South
well effluent. Sisi Nubi gas is then exported through 20
CPU-Nilam pipeline. Planning Optimization
Development phases of Tunu are still on going, as
now it is operating in MP mode towards low pressure Increasing number of sensitive, very sensitive, and
(LP) mode. Several projects consisting installation of LP super very sensitive wells indicate more mature
compression platforms in both areas, as well as reservoir. Potential of these wells is difficult to recover
extension of several GTSs is in progress. Long term after any shut down. Therefore, to minimize shut down
projects are also under study to maintain production to impact to the wells, any works that require well shut
adapt with well behavior changes as consequence of down have to be carefully planned and optimized.
more mature field. This intensive development demands Compressor planned maintenance is scheduled so
strategies to answer challenges how to maintain and that any other jobs requiring wells shut down is
increase production from Tunu as the network become performed in hidden time in order to take opportunity of
more complex due to above projects. compressor shut down. Several activities such as
pigging and vessel inspection are carried out during
compressor shut down period. This strategy allows
Network Optimization production shortfall optimization by minimizing shut
down frequency of wells.
In order to optimize pipeline operations, efforts have Apart from planned shut down, unplanned
been made to leave no pipeline in idle condition. compressor shut down is also occurred because of
Strategy to route GTSs production is implemented, process and safety reason. This unplanned shutdown
especially in Tunu South where the network complexity also forces wells to be shut in for certain period of time
is the most and only single 36 pipeline remains to and at the end potential recovery problem is also being
accommodate current production of around 800 MMScfd faced. To avoid occurrences of unplanned major shut
of gas. By routing GTS production to optimum down, strategy to record and analyze each case is
configuration, it is expected that wells suffer minimum applied. Root cause investigation is carried out to
backpressure. determine source of the problem and recommended
A balance line connecting South and North is actions to be taken as curative and preventive means.
installed to allow optimum production from both areas. Recommended actions follow up and implementation is
Currently, during normal operation, production from monitored every month to avoid shut down by same or
several GTSs in South is routed to North via 20 and 24 similar causes will reoccur in the future.
pipeline of GTS-J, an interconnecting GTS. This is also
aimed to maximize South production while there is
available capacity in North to handle stream from South. Acknowledgements
In case of any compressor shutdown occurs in one of
the area, production stream is maximized to another via Thank you to Bapak Ashif Hadad, head of Tatun and Sisi
this production flexibility from both areas. Nubi Production Method TOTAL E&P INDONESIE of his
Another strategy still under study to maximize advice and support.
production from Tunu field is by routing Sisi Nubi HP gas
to North so that South effluent is accommodated through Reference
30 and 36 pipelines. However, this option will end up
production flexibility of South-North. TOTAL E&P INDONESIE, Tambora, Tunu, Sisi Nubi
Fields Operating Manual Rev.0

***

IATMI 08-012 2
Ikatan Ahli Teknik Perminyakan Indonesia

TMx

Dx

AC

AA

Figure 1. Tunu Field Layout

IATMI 08-012 3