Doc No- HID/ MS-SL-001 Page 3 of 13
EMPLOYER MAADEN WAAD AL SHAMAL PHOSPHATE COMPANY
PROJECT MOLTEN SULPHUR EMERGENCY STORAGE TANK
DOC NO. MD-512-F1H0-PM-EX-PEI-3001
1. OBJECTIVE
2. SCOPE OF WORK
This method statement describe the way to sustain the existing facilities
around new Sulphur tank (Tank # 1,2, and 3, existing pipe rack, and all
sensitive accessories) by installing protection sheet around it, and keep it
on during all stages of tank construction.
3. REFERENCE DOCUMENTS:
5. RESPONSIBILITIES
The access to tank farm area will be through the tanks temporary ramp
constructed for this purpose (material shifting, vehicle and heavy
equipments movement), Existing step stairs to be used for man power as per
mentioned in the below figure 1.
Figure 1.
Method Statement of Existing
Facilities Protection Sheet
Installation
Doc No- HID/ MS-SL-001 Page 7 of 13
EMPLOYER MAADEN WAAD AL SHAMAL PHOSPHATE COMPANY
PROJECT MOLTEN SULPHUR EMERGENCY STORAGE TANK
DOC NO. MD-512-F1H0-PM-EX-PEI-3001
Each panel of protection sheet (Hoarding) will consist the Below main part.
1. The Main frame which is ( Tow (2) vertical galvanized post with diameter of (76 mm)
and height 2.1 meter, will be welded to 120 mm x 120 mm H section Base with
length of 50 cm, and two horizontal 40mm x 20mm tube.
2. Protection sheet supporting tube which is three vertical 40mm x 20mm tube welded to
main frame tube with distance as per mentioned in Figure 2.
3. white color aluminum sheet with thickness of 1mm and width of 1 meter and 2.5-
meter length, as per mentioned in Figure 2, and to be fixed to the vertical tube with
1/2 in. Self-Piercing Screw.
Figure 2
Method Statement of Existing
Facilities Protection Sheet
Installation
Doc No- HID/ MS-SL-001 Page 8 of 13
EMPLOYER MAADEN WAAD AL SHAMAL PHOSPHATE COMPANY
PROJECT MOLTEN SULPHUR EMERGENCY STORAGE TANK
DOC NO. MD-512-F1H0-PM-EX-PEI-3001
The protection sheet panel (Hoarding) will be lay to close all unnecessary area
around construction site with total length of 192 meter which is around 63
panels as per mentioned in figure 3 below.
Figure 3
Method Statement of Existing
Facilities Protection Sheet
Installation
Doc No- HID/ MS-SL-001 Page 9 of 13
EMPLOYER MAADEN WAAD AL SHAMAL PHOSPHATE COMPANY
PROJECT MOLTEN SULPHUR EMERGENCY STORAGE TANK
DOC NO. MD-512-F1H0-PM-EX-PEI-3001
Ensure approval and release of Work Area by Maaden PMT or other relevant
departments prior to commencement of work on site as required.
Prior to commencement of work contained herein, Hidada Contracting Company
shall obtain the relevant work permits from MWSPC /Operations Team.
Toolbox shall be conducted by the Supervisor. Use of necessary PPE shall be
checked and enforced by the safety officer. (Safety Glass, Safety Shoe, Helmet,
Coverall, etc.)
Existing Services HCC construction team will mark the area and would conduct
an investigation and acquire information about site services might have been
placed/embedded below the paved area. Services, wherever found shall be
rerouted and protected to place will not affect site activities.
Required Materials
iv) Bracing
After installing and positioning the protection sheet, we will position the
angled back stay to mark the required drilling hole, after insuring the
location of holes is matching with our angled back stay plate we will
proceed to the next step which is paving drilling.
3 inches expansion bolts to be used to fix the angled back stay plate to the
concrete paving.
Figure 4
Method Statement of Existing
Facilities Protection Sheet
Installation
Doc No- HID/ MS-SL-001 Page 13 of 13
EMPLOYER MAADEN WAAD AL SHAMAL PHOSPHATE COMPANY
PROJECT MOLTEN SULPHUR EMERGENCY STORAGE TANK
DOC NO. MD-512-F1H0-PM-EX-PEI-3001
10. SAFETY