Académique Documents
Professionnel Documents
Culture Documents
percentage
B Sreeranga Pradyumna, Ankur Dwivedi, G Sai Akhil
Btech Applied Engineering in specialization in Upstream
University of Petroleum and energy Studies, Dehradun
Introduction:
Smart Completions:
. The main difficulty with these kinds of wells lies in their
Figure 5: Location of Champion West Field
completion which means making the well to produce the
The champion west field consists of about 1200m vertical oil. To achieve the completion, dogleg severity needs to
reservoir sequence over a complete area of 10km 2 in 15 be controlled and directional tools are required. According
main blocks. The hydrocarbons have been found over a to the Project leader Grahaeme Henderson the snake
wide stratigraphic range which consists of number of wells had given positive end results with low unit
distinct columns of thick shale along with accumulation of development costs, high initial flow rates and also that
thin shales. This formation sequence then continues into recovery efficiency has been proved to be significantly
gas prone as the depth increases. This gas is either better than many cases of vertical wells.
present as either associated or non-associated gas. The
column length of oil varies from 22 to 400 meters. To obtain a perfect or optimized completion
The field development was divided the completions must be smart which imply the usage of
in to different phases. The phase 1 and phase 2 Flow control valves, Pressure gauges, fiber optic
developments are discussed in the history and
temperature sensors which will be operated remotely. By
development where the initial phase was tough to start
with and also expensive. In the later phase there was this design the will be no need for well bore access for
installation of Containerized electrical room, single and well or reservoir management and for its maintenance.
splitter wellheads and in this phase 6 oil and 2 gas wells This platform provides remote access to BSPs operation
were planned to drill. center in Seria via high band width connections to the
In the Phase 3 development, there shore which helps in conducting the real time monitoring,
are 20 wells including of both oil and gas. In this phase
there is implementation of ERD wells in which they are clean up and optimization of wells. Also helps in online
designed as snake wells which penetrate into the testing of the well using multiphase flow meter and Rapid
reservoir several times. They found that, due to the shut down and start up whenever required. It also allows
complex nature of vertically stacked and structurally production testing of individual zones without
dipping reservoirs there is a very need for a well design interventions and with minimal production interruption.
which is different from the standard design. The vertical
The well is also equipped with a fibre-optic distributed
drilling method was already ruled out, multilateral drilling
concept was also not considered taking into the account temperature sensor to monitor its clean-up and in-flow
of cost and complexity, conventional horizontal drilling behaviors, and to detect early signs of gas and/or water
concept was not attractive because there would be need breakthrough in the future. There is also a room for
for more number of wells required for reservoir drainage. increasing the economic life span of the wells.
So the ultimate design required to rule out all the Initially used in subsea wells, where
complications is to drill in shape of snake horizontal wells intervention is expensive and high-risk, intelligent
with Smart Completions completions have since proven their value in managing
Phase 3 of Champion West is actually split production from multilateral wells, horizontal wells with
into three sub-phases - the 3a, initiated in 2004, involves multiple zones, wells in heterogeneous reservoirs, and
drilling five development wells from a newly installed mature reservoirs. According to the Henderson, many of
5 SPE PDPU Fest 2016
BSPs wells off Brunei have been optimized using smart The calculations are done for 5, 7, and 9 with
field technologies. coefficient of friction 0.2 to 0.4 and found the load for
casing having weight 18lb/ft.
There are three types in the horizontal drilling based on
the radius of curvature where the wells with short radius This gives that we need to push at the build-up section
have inclination of 2 to 60 / 30 m of horizontal
for both open and closed end Casing because there
displacement, Medium radius wells with 8 to 200 / 30 m
and extend up to 1000 m or more. Much advancement in is huge load which can damage the casing so it
this horizontal drilling has been made and this technique should be considered.
is being incorporated in all the situations, but it also has
its weakness like casing design and cementing problem
many horizontal wells are completed as open hole. Build Up Section-
The casing for this type of
drilling we need to know the loads applied on the casing It changes both in direction and inclination which
string. The horizontal drill trajectory clearly shows the well implies it has drag and bending loads on the casing.
is divided into three intervals: horizontal, build up section, Their inclination varies from 5 to 50o per 100 feet and
vertical section. All these different sections have the the load is mostly compressive and it iv=creases with
different loads applied on them. the increase in the horizontal section
Horizontal section- Vertical Section-
This section of the well is almost horizontal with 80 to The load is maximum at the starting of the well bore
900 inclination with vertical. The section is subjected and it is equal to the weight of the casing string and
to torque and drag forces which are the result from the load at kick off point.
the contact of the pipe to bore hole. Two factors affect
sliding wellbore friction which is coefficient of friction Drawbacks of Snake Well Design:
and normal contact and their product gives magnitude
of friction force (2). The value of the sliding friction Snake well has shown significant improvement in the
depends on the contacting material and degree of production or recovery of oil from the reservoirs and in
some cases, even better than vertical drilling. During its
lubrication at various places.
implementation, challenges regarding its placement and
control of the wells occurred due to its completely new
design but smart completion method tackled the
challenges easily with the advanced flow control valves,
sensors and other productive tools. The challenge related
to dismantling and reassembling equipment were easily
brought down by using mobile drilling units moved
between pads which automatically brought the cost down
by 10-20%. In spite of all the challenges and limitations
occurred and solved,
The present day design of the snake well still contains
flaws and drawbacks leading to high risk and uncertainty.
Some of the drawbacks related to its design are:
Ft = W cos + Fn
Torsional increment M=*Fn*r
6 SPE PDPU Fest 2016
4. editions.sciencetechnologyactions.com/lessons2-
References: 21616.php
1. absolutetect.com/flowcontrol/meshflux
2. Combination of Snake Well Design & Smart
5. Smart snake wells in champion west-Expected and
Completions: Key Enablers for Champion West
Unexpected Benefits from Smart Completion SPE
Development. SPE 88524. Aidiradiman Haji
100880, W.Obendrauf, K.Schrader, N. Al-Farsi and A.
Johan (Brunei Shell Petroleum Company Sdn. Bhd) kirby White, SPE, Brunei Shell Petroleum Co. Sdn. Bhd.
Schrader (Brunei Shell Petroleum Company Sdn. Bhd).
B Sreeranga Pradyumna
Mobile: 8171949239
Email: pradyumnabellamkonda@gmail.com
G Sai Akhil
Mobile: 9505145382
Email: godavarthiakhil009@gmail.com
Ankur Dwivedi
Mobile: 9807029205
Email: ankurdwivedi320@gmail.com