REPAIRING OF DAMAGED GRP CHILLED WATER PIPELINE AT JUMEIRAH

Cluster B @ Building B3

RISK
EVALUATION RISK
SN Hazards CONSEQUENCES/ IMPACT With No Controls LEVEL
P S H/M/L

2 3 6

Risk of getting injuries to working


personnel/damage of materials by miss-
handling of materials or shifting of heavy
items with make-shift arrangement.
Material Shifting operations
1
Using HAIB Crane

Risk of getting injuries by miss-use of


shifting equipments
Loose Materials falling from the vehicle
Person falling from the vehicle

2 2 4
Risk of getting injuries from operations in
progress by other trades around the actual
working locations.
Working Adjacent to other
2
Trades
Working Adjacent to other
2
Trades

Excavation manual and


Mechanical
Property damage and personnel
3 3 4 12
injury/fatality
Impact with plant and
underground services.
Crushing or side wall collapse Property damage and personnel
of excavated trench. injury/fatality

Property damage and personnel


Security of excavation
injury/fatality

Falls from height & falling


Personnel injury/fatality
objects

Safe access egress Personnel injury/fatality


Worker hit by excavator Personnel injury/fatality

Poor illumination, rain, sand Property damage and personnel


storms injury/fatality

3 4 12
Working inside excavated
4
areas/trench.

Property damage and personnel


Falls from above
injury/fatality

Heat stress due to working in


Personnel injury/fatality
hot climates

Lack of visibility Personnel injury/fatality


Fall from heights Personnel injury/fatality

Cutting of existing 1200mm


5
GRP pipe using cutting set Property damage and personnel
injury/fatality from electrocution 3 3 9

Generation of GRP Dust

Chronic health hazard due to the


Electrical Hazards prolonged exposure to Carcinogenic dust
Physical injuries like
Incorrect selection of cutting cuts,abrations,stabs,punchers from
wheels improper selection of cutting wheels
Working inside the 1200mm
6
GRP pipe
4 3 12
Loss of consciousness of any person at
Lack of visibility work arising from an increase in body
temperature

Ergonomic issues
Fatality due to asphyxiation and
Unexpected sudden ingress of presence of toxic gases and fumes during
Water lamination

Fatality/ physical injuries due to the


sudden ingression of water

Involvement of Incompetent
7 property damage 2 4 8
laminators

personnel injury

Handling and use of Adhesive Fatality due to burns and inhalation of


8 3 4 12
chemicals/resins Causing:- toxic gases

Fire personnel injury (burns)


Health Hazards from inhalation
Irritation, Dermatitis,dizziness
and direct dermal contacts

Storage of Adhesive /resins causing Fatality due to burns and inhalation of


9 3 3 9
Spillages or leakage :- toxic gases

Fire personnel injury (burns)

Health Hazards from inhalation


Irritation, Dermatitis,dizziness
and direct dermal contacts
Property damages

Backfilling Compaction and


10 Property damages and personnel injuries 2 3 6
levelling Equipment failure

Windup & Housekeeping


11 personnel injury 2 4 8

Scattered Materials causing slip


Forla and funa damages
trips, and environmental issues
MAGED GRP CHILLED WATER PIPELINE AT JUMEIRAH LAKE TOWERS
Cluster B @ Building B3

RESIDUAL RISK ACCEPT Actions


IMPLEMENTED CONTROL MEASURES
P S H/M/L Y/N? By
Only trained and competent personnel to be deployed
1 2 2 Y
for material shifting and lifting operations

Proper guidance should be given to workers and


close supervision will be done during shifting or
handling of heavy equipments Site Engr/ Supervisor/
Foreman
Use only certifired lifting belts should be used

Materials not to exceed safe working loads of plants &


equipments in use.

Adequate protective equipment will be worn such as


hand gloves, safety shoes & helmets.
All materiials that are loaded for shifting should be
secured properly using securing belts

Safe and reasonable access will be provided for


1 2 2
working areas. Site Engr/ Supervisor/
Works of other trades will be suitably co-coordinated Foreman
by site supervisor to ensure
safe operations of both the trades.
In case structural or other works are ongoing close-by,
suitable overhead
protection will be provided to protect the persons
below.

1.5m Trail pit to be done manually to identified any


underground utilities services and protection for the
exposed undergound services should be provided.
Banks man shall be deployed to guide the
Shovel/Bobcat operator about any services for further
excavation. At all
stages of the excavation, a competent person must
supervise the work and the workers given clear Site Engr/HSE
instructions on working safely in the excavation. 1 2 2 Officer/Supervisor
Third party certified /Foreman
excavator and operator shall be deployed for
excavation works. PTW shall be
applied prior excavation which must be signed by
authorized issuer, receiver and safety officer of the
area. Toolbox talks to
be conducted on hazards associated with Excavation
activity and its control measures.
Shoring should be in place if depth of trench exceeds
more than 2m. Operative
should ensure that shoring etc has been done to
his/her satisfaction before descending into trench &
gain access only by suitable access equipment.
Excavations must not be
adjacent to buildings and heavy plant kept away from
edges. Stop blocks should be placed behind wheels
of vehicles tipping into excavation. Do not store
materials, waste materials or plant adjacent to
excavation. Ensure proper use of PPE such as
hand gloves, safety shoes & helmets.

Area must have 1.5M high Hard brricades and fencing


erected at a safe distance away from the excavation.
Shoring should be in
place if depth of trench exceeds more than 2m.
Use warnings and
sign boards.Ensure proper PPE such as hand gloves,
safety shoes & helmets.

Area must have 2M high Heras fencing erected at a


safe distance away from the excavation. Fall
prevention barriers shall be erected around
excavation. Stop
blocks installed at a safe distance from excavation
preventing vehicles from falling into excavation. PPE
Hard hats & Safety shoes to be worn.

Safe access by ladders to be ensured.


If plant is being used above the trench then no
operatives should be in the trench when the machine
is in use. At
all stages of the excavation, a competent person must
supervise the work and the workers given clear
instructions on working safely in the excavation.

Proper tast lighting should be arranged.


No work shall be allowed due to poor
illumination, rain and sand storms.

Toolbox talks to be conducted on hazards associated


2 2 4 Y
with confined space activity and its control measures

Ensure proper PPE'S are worn by all the workers,


working at such places.
Ensure Permit to Work (PTW) system followed at
such locations.
NO equipment or vehicles should park nearby the
excavation .
Remove the debris,excavated soil and stored
materials along the edge of the excavation.Ensure the
use of PPE like hard hats, helmets, gloves, safety
shoes etc. HSE Officer/ Site Engr/
Supervisor/ Foreman
Makre sure the availability of electrolyte replacing
drinks and water

Barricade the area & Provide proper slgnage,


warning lights etc
Ensure supervisors monitor site regularly on
excavated locations and ensure that no unwanted
persons Is around the area.

Ensure the access egresses are clear.

Ensure the availability of necessary safety measures


before entering the excavated area like safety belts

Only trained and competent personnel to be deployed


2 1 2 Y
for cutting operations HSE Officer/ Site Engr/
Supervisor/ Foreman
Ensure the availability of proper PPE for the
designated works

Provide Localized Exhaust ventilation syetem

Provide recovery time for the workers in between the


time of work

Toolbox talks to be conducted on hazards associated 2 2 4 Y


with confined space activity and its control measures HSE Officer/ Site Engr/
Supervisor/ Foreman
Ensure confined space Permit to Work (PTW) system
followed at such locations
Ensure proper PPE'S are worn by all the workers,
working at such places.
Ensure LOTO procedure for closing the nearby
adjacent isolation valves. Ensure the availability of
portable exhaust for proper air circulation

Ensure the availability of necessary safety measures


before entering inside the 1200mm GRp pipe

Only trained and competent personnel to be deployed


for the task inside the pipe
Ensure supervisors monitor site regularly on
excavated locations and ensure that no unwanted
persons Is around the area.
Ensure proper communication system to maintain
constat communication between the person inside
and oustide area
Brief the operatives via toolbox talk / Pre Task briefing,
inspection of tools and Equipments using for 1 2 2 Y
insulation.
HSE Officer/Site Engg/
Read & follow manufacturers instruction & warning Supervisor/ Foreman
labels.
Adequate PPE to be worn by site personnel such as
safety helmet, safety shoes, Gloves etc.,
Close supervision will be ensured during insulation
works.

Brief the operatives via toolbox talk / Pre Task briefing,


HSE Officer/ Supervisor/
MSDS contents of the Adhesive glue using for 1 2 2 Y
Foreman
insulation and Emergency evacuation procedure.

Ensure the availability of fire extinguishers in plaxce


and trained personnels .
Ensure Permit to Work system is followed and the
availability of Local exhaust Ventillation(LEV).

Ensuring periodic Medical Surveillance or Health


Surveillance to the people involved in the activity
Ensure proper PPE'S are worn by all the workers,
working at such places.
Ensure the availability of fire extinguishers where the 1 2 2 Y
adhesive chemical/resin is store
Supervisor/Foreman
Ensure the adhesive materials are stored safely and
provided with spill trays and spill kits

Ensure the availability of eye wash points

Foreman shall ensure that plate and roller compactor


have been properly maintained, daily inspection has
1 1 1 Y Supervisor/Foreman
been carried out and maintenance records are being
kept.

Plate/Roller compactor shall only be operated by


competent and experienced operatives.

Ensure proper wind up & housekeeping at worksite. 1 2 2 Y


Supervisor/Foreman
The accessories (hoses & pump) not being used
must be disconnected and stored separately.
Actions
Date
3/22/2017
3/22/2017

3/22/2017
RISK ASSESSMENT TITLE INSULATION OF CHW PIPELINE
PROJECT JUMEIRAH VILLAGE SOUTH DISTRICT COOLING PROJECT
LOCATION JUMEIRAH VILLAGE SOUTH
CONTRACTOR ISLANDTOWER ELECTROMECHANICAL WORKS LLC

ASSESSMENT TEAM
ASSESSED BY
REVIEWED{IMPACT)
BY
(S) RARE/Remote Possibility
(once every 3 years or
more)
SEVERITY (IMPACT) [S] 1
Insignificant
1 1
Minor
2 2
Moderate
3 3
Significant
4 4
Major
5 5

Risk Rating (RR)=Likelihood X Severity


12-25 Moderately controlled Risk - Further risk reduction measures should be considered
5-10 Adequately Controlled Risk - Risk is tolerable when control measures identified are implemen
1-4 Trivial Risk - No further improvements necessary provided control measures are maintained
REPAIRING OF DAMAGED GRP CHILLED WATER PIPELINE AT JUMEIRAH
LAKE TOWERS Cluster B @ Building B3

CHW PIPELINE
AGE SOUTH DISTRICT COOLING PROJECT
AGE SOUTH
ELECTROMECHANICAL WORKS LLC

Safety Officer
Safety EngineerCould
POSSIBLE
UNLIKELY Could Happen But Rare (typically once in a Happen Occasionally (on
year) 2 average quarterly)

2 3

2 3

4 6

6 9

8 12

10 15

trolled Risk - Further risk reduction measures should be considered


trolled Risk - Risk is tolerable when control measures identified are implemented
further improvements necessary provided control measures are maintained
RISK ASSESSMENT REF. NO. IT/RA/CORN/009/17
CONTRACT AGREEMENT REF.NEMP-TR-0164-LOA-TP-NJM-EDQ-01
ITEM PROJECT REF. NO. JN#729/16
CLIENT EMPOWER

RAHUL RAJ
LIKELY Could Happen Often(on SOMAN
GIRISH ALMOST CERTAIN Could
average once in a month or Happen Frequently (once a week
more) or more)

4 5

4 5

8 10

12 15

16 20

20 25

Vous aimerez peut-être aussi