STUDENTS WITH EVEN ROLL NO : COMPLETE ALSKA CASE

Alaska Fly Fishing Expedition


You are sitting around the fire at a lodge in Dillingham, Alaska, discussing fishing expedition you are
planning with your colleagues at Great Alaska Adventures (GAA).Earlier in the day you received a fax
from the president of Blue Note Inc.The president wants to reward her top management team by taking
them on an all expenses paid fly fishing adventure in Alaska.She would like GAA to organize and lead the
expedition.

You have just finished a preliminary scope statement for a project (see below).You are now brain
storming potential risks associated with the project

Your Assignments:

1.Brainstorm potential risk associated with this project.Try to come up with at least seven different risks

2. Use a risk assessment form as per sample (in class) with three of following risk components and give
the score

Probability of risk event,


Hideability,
Severity(impact)

3.Develop a risk response plan along with the table

You have following information

Project scope statement

Objective:

To organize and lead a five day fly fishing expedition down the Tikshick river system in Alaskafrom June
21 to 25 at a cost not exceeding $27,000

Deliverables:

Provide air transportation from Dillingham ,Alaska to Camp I and from Camp II back to
Dillingham
Provide river transportation consisting of two eight man drift boats with outboard motors
Provide three meals a day for the five days spent on river
Provide four hours fly fishing instruction
Provide Overnightaccommodation at the Dillingham lodge plus three four man tents with cots,
bedding and lanterns
Provide four experienced river guides who are also fly fishermen
Provide fishinglicenses for all guests
Milestones:

Contract signed Jan 22


Guest arrive at Dillingham Jun 20
Depart by plane to Base camp I Jun 21
Depart by plane from Base Camp I to Dillingham June 25

Technical requirement

Fly in air transportation to and from base camp


Boat transportation within Tiksick River
Digital Cellular Communication devices
Camps and fishing conform to state of Alaska requirement

Limits and Exclusions

1. Guests are responsible for travel arrangements to and from Dillingham Alaska to home
2. Guests are responsible for their own fly fishing equipment and clothing
3. Local Air transportation to and from the base camp will be outsourced
4. Tour guides are not responsible for the number of King Salmon caught by guests

STUDENTS WITH ODD ROLL NO : COMPLETE PEAKLAN CASE


Peak LAN Project

Peak Systems is a small information systems consulting firm located in Meridian, Louisiana.Peak has just
been hired to design and install a local area network(LAN) for the city of Meridians social welfare agency
.You are the manager of the project, which includes one peak professional and two interns from a local
university. You have just finished a preliminary scope statement for the project(see below) . You are now
brainstorming potential risks associated with the project

Your Assignments:

1. Brainstorm potential risk associated with this project. Try to come up with at least seven different risks

2. Use a risk assessment form with three of following risk components and give the score

Probability of risk event,


Hideability,
Severity(impact)

3.Develop a risk response plan along with the table

You have following information

Project scope statement

Project Objective

To design and install a local area network(LAN) within one month with a budget of $90,000 for the
MeridianSocial Service Agency

Deliverables

Twenty work stations and twenty laptops


Server with dual core processors
Two colorlaser printers
Windows vista server and workstation operating system
Four hours of introduction training for clients personnel
Sixteen hour of training for client network administrator
Fully operational LAN system

Mile stones

Hardware Jan 22
Setting user priority and authorization Jan 26
In house whole network test completed Feb 21
Client site test completed Feb 2
Training completed Feb 16
Technical requirements
Workstations with 17 flat panel monitors, dual core processors
Laptops with 12 display monitors 60 GB hard drive
System must support windows Vista Platform
Wireless network interface cards and Ethernet connections

Limits and Exclusion

System maintenance repair only upto one month after final inspection
Warranties transferred to client after one month
Client will be billed for additional training beyond that prescribed format
Client full support is expected throughout the project