Vous êtes sur la page 1sur 23

NEW ASSEMBLY HALL - C AT PLOT NO.

A-1/1 , MIDC INDUSTRIAL AREA , SHENDRA ,


AURANGABAD , MAHARASHTRA

C:\DOCUMENTS AND SETTINGS\62794001\MY DOCUMENTS\SKODA SOIL REPORT-CN.DOCX

0 26.08.2011 First Issue SMA AKS NAK


rev. date Description/issued for By Ckd. Appd.
Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT

office: Chennai Project no 60980 document: 1115001 rev 0 sheet: 1 of: 23


:
CLIENT : Skoda Auto India Pvt Ltd

CONSULTANT : Tebodin Mukesh Consultants & Engineers India


Pvt. Ltd. (TMI)

LOCATION : Aurangabad

TMI PROJECT No. : 60980 - Skoda Auto India Private Ltd - Soil
Investigation & Survey

Date: : 26.08.11

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 2 of: 23
Originated by: Department Manager

Department Name Initial

311 Nagesh Kumar C S NAK

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 3 of: 23
REPORT ON SOIL INVESTIGATION WORK FOR PROPOSED NEW ASSEMBLY HALL - C AT PLOT
NO. A-1/1, MIDC INDUSTRIAL AREA, SHENDRA, AURANGABAD, MAHARASHTRA.

1. INTRODUCTION

1.1 PROJECT

This soil investigation work , whose results are being presented


herewith, has been conducted for the New Assembly Hall - C Building being
proposed to be constructed by the project authorities at their
site situated at Plot no.
A - 1/1 , MIDC Industrial Area , Shendra , Aurangabad( Maharashtra ).

A site plan is being enclosed indicating the location of proposed


building and investigation points.

1.2 AIM OF SOIL INVESTIGATION

Soil investigation has been conducted at the site in order to


evaluate the parameters required for design of foundations.

These parameters are:

(a) Type of foundation on which the proposed super structure


will be supported.

(b) Depth of foundation, and

(c) Allowable bearing pressure at the founding level.

To evaluate these parameters, various engineering properties of the


sub-soil have been studied.

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 4 of: 23
1.3 SCOPE OF WORK

The stipulated scope of work comprised of following:

1. Mobilisation of equipment and personnel to the site and back.

2. Sinking boreholes ( 10 nos.) in the subsoil down to refusal


strata levels , observing ground water table levels if encountered
down to termination depth , conducting required field and laboratory
tests and their analysis.

3. Preparation and submission of technical report in triplicate.

2. INVESTIGATIONS CONDUCTED

2.1 INSITU TESTS

Exact locations of field testing points have been marked at the site
as per directions of project engineers. These locations have been designated
as BH 1 to BH 10 in this report.

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 5 of: 23
2.1.1 BOREHOLES

Following operations have been carried out during the progress of


boreholes:

(a) Augering with the help of shell and auger technique down to
termination depth.

(b) Standard penetration tests.

(c) Collection of oil samples.

The ten boreholes have been terminated on encountering refusal strata level
at following depths :

BOREHOLE NO. TERMINATION DEPTH (M)


-----------------------------------------------
1. 1.15
2. 0.88
3. 1.07
4. 0.95
5. 0.86
6. 0.83
7. 0.85
8. 0.66
9. 0.64
10. 0.12
-----------------------------------------------

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 6 of: 23
2.1.1.1 WATER TABLE

Water table was not encountered down to respective termination


depths below existing ground level in the ten boreholes.

2.1.1.2 FILLED UP SOIL

Filled up soil was encountered down to following depths at


the top in the ten boreholes :

Borehole no. Filled up depth ( m )


---------------------------------------------
1. 0.30
2. 0.25
3. 0.50
4. 0.60
5. 0.60
6. 0.50
7. 0.60
8. 0.30
9. 0.40
10. 0.12
---------------------------------------------

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 7 of: 23
2.1.1.3 STANDARD PENETRATION TEST RESULTS

Following standard penetration resistance (`N') values have


been recorded at various depths in the ten boreholes:

DEPTH (M) `N' VALUES


-----------------------------------
BH 1 BH 2 BH 3 BH 4
----------------------------------------------

0.80 100
-------
8 cms.
penet-
ration

0.90 100
-------
5 cms.
penet-
ration

1.00 100 100


------- ------
15 cms. 7 cms.
penet- penet-
ration ration
----------------------------------------------

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 8 of: 23
DEPTH (M) `N' VALUES
-----------------------------------
BH 5 BH 6 BH 7 BH 8
----------------------------------------------

0.60 100
-------
6 cms.
penet-
ration

0.80 100 100 100


------- ------ ------
6 cms. 6 cms. 5 cms.
penet- penet- penet-
ration ration ration

----------------------------------------------

DEPTH (M) `N' VALUES


--------------------
BH 9 BH 10
-------------------------------

0.10 100
-------
2 cms.
penet-
ration

0.60 100
-------
4 cms.
penet-
ration

-------------------------------

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 9 of: 23
2.2 LABORATORY TESTS AND RESULTS

Following tests have been conducted on various soil samples in the


laboratory:

(a) Particle size Distribution.


(b) Liquid and plastic limits.
(c) Shear Tests.

Results are being presented in tabular form as follows :

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 10 of: 23
LABORATORY TEST RESULTS

DISTURBED SAMPLES

BOREHOLE
NO./DEPTH GRADATION ANALYSIS(%) ATTERBERG LIMITS (%)
(M) GRAVELS SAND SILT CLAY LIQUID PLASTIC
-------------------------------------------------------------

1/ 1.00 44 50 6 0 NONPLASTIC
2/ 0.80 49 48 3 0 NONPLASTIC
3/ 1.00 58 40 2 0 NONPLASTIC
4/ 0.90 55 40 5 0 NONPLASTIC
5/ 0.80 62 34 4 0 NONPLASTIC
6/ 0.80 54 39 7 0 NONPLASTIC
7/ 0.80 60 35 5 0 NONPLASTIC
8/ 0.60 59 38 3 0 NONPLASTIC
9/ 0.60 54 43 3 0 NONPLASTIC

-------------------------------------------------------------

UNDISTURBED SAMPLES

BH NO./
DEPTH COHESION ANGLE OF
(M) SHEARING
(Kg/sq.cm) RESISTANCE
(O)
-----------------------------

1/1.0 0.00 33
3/1.0 0.00 32
6/0.8 0.00 34
8/0.8 0.00 32

-----------------------------

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 11 of: 23
3. OBSERVATIONS

Following points are observed from results


obtained so far :

(a) Grain size distribution curves plotted from sieve and


hydrometer analysis indicate that the sub-soil strata in this site
predominantly comprises of coarse sandy soil mixed with gravels and
boulders down to the refusal level which ranges from 0.12 to 1.15 m in
the ten boreholes.

Presence of refusal strata was confirmed by trial pit excavation too.


Considering the uniformity of the observed results and the geology of the
project site area , it can be inferred that the underlying sub strata
comprises of rocky strata only.

(c) The sub-soil strata is nonplastic in nature as indicated by


atterberg limits' tests results.

(d) Standard penetration test results indicate very high penetration


resistance chracteristics at the refusal level.

4. DISCUSSIONS AND ANALYSIS

For designing the foundation system, the following parameters are


required :

(a) Suitable type of foundation on which the proposed super-structure


can be supported.

(b) Depth of these foundations, and

(c) Allowable bearing pressure at the founding level corresponding to


various footing sizes.

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 12 of: 23
4.1 TYPE OF FOUNDATION

Type of foundation to be adopted for a particular structure depends


upon the loading intensity at the foundation level and the configuration of
loading points.

Considering the anticipated loads, proposed project buildings can


be supported over isolated / strip foundations.

4.2 DEPTH OF FOUNDATION

Foundations for the proposed project buildings will be placed at a


depth of 120 cms. below the existing ground level.

Above recommended depth is safe against shear failure.

4.3 ALLOWABLE BEARING PRESSURE

Following criteria have been adopted for evaluation of allowable


bearing pressure values:

1. Standard penetration test results


2. Shear strength criterion

Intermediate shear failure condition as per I.S. 6403 has been


considered for deducing shear strength value.

Allowable settlement values of 50 mm has been considered for


allowable bearing pressure computation .

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 13 of: 23
SAMPLE CALCULATIONS

Type of foundation : Isolated / Strip

Depth of foundation : 120 cms. below theexisting ground level

Width of foundation : 150 cms.

I. SETTLEMENT CRITERION

2
Q = 0.086 ( 1 + 30/ B ) ( N - 3 )

Average corrected ` N ' value = 100

Q = 12.01 kg./ sq. cm.

II. SHEAR FAILURE CRITERION

Q = 0.4 ( 2/3 c Nc + q ( Nq - 1 ) + 0.375 r B Nr)

Cohesion, c = 0.00 Kg / sq.cm.

Angle of shearing resistance, O = 32 degrees

Bearing capacity factors :

Nc = 27.28 , Nq = 16.53 , Nr = 20.51

Overburden density , r = 1.70 gms./cc.

Overburden pressure , p = 0.204 kg./sq.cm.

Shear strength , Q = 1.79 kg./sq.cm.

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 14 of: 23
IV. RECOMMENDATIONS

Adopt, Qnet = 1.79 kg./sq.cm.

Say 1.75 kg./sq.cm.

Based upon the above, the recommendations are being provided as


follows:

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 15 of: 23
6. RECOMMENDATIONS

I. Type of foundation : Isolated / Strip

II. Depth of foundation : 120 cms. below the existing ground


level

III. Allowable Bearing Pressure

Following net allowable bearing pressure values can be adopted


corresponding to various foundation widths at above recommended depth :

Width of foundation (cms.) 150 200 250

Allowable Bearing Pressure


( kg./ sq. cm.) 1.75 1.95 2.10

For intermediate foundation widths, bearing capacity values may


be linearly interpolated.

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 16 of: 23
PROJECT : REPORT ON SOIL INVESTIGATION WORK FOR PROPOSED
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC
INDUSTRIAL AREA , SHENDRA , AURANGABAD ,
MAHARASHTRA.

CLIENT: Skoda Auto India Pvt Ltd

DATE : 26.08.2011

C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx


Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 17 of: 23
C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx
Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 18 of: 23
C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx
Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 19 of: 23
C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx
Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 20 of: 23
C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx
Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 21 of: 23
C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx
Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 22 of: 23
C:\Documents And Settings\62794001\My Documents\Skoda Soil Report-Cn.Docx
Client SKODA AUTO INDIA PRIVATE LTD
Project
NEW ASSEMBLY HALL - C AT PLOT NO. A-1/1 , MIDC INDUSTRIAL AREA
, SHENDRA , AURANGABAD , MAHARASHTRA

Title SOIL INVESTIGATION REPORT


office: Chennai Project no 60980 document: 1115001 rev: 0 sheet: 23 of: 23