Vous êtes sur la page 1sur 1

01/03 01/AUX 01/03 01/AUX 01/03 01/AUX

01/03 01/AUX
3300 3300

750 2100 450 750 2100 450

1HR1 3HR1

115
115

115
01/B 01/B
01/B 01/B

300

301
300

301
1HR3

937
218 234

937
234 218

670
3HR4

750
670
750

15
15

108
127
2SHR2

15
15
4SHR2

2SHR4 586 958 452 958 346


586 958 452 958 346
4SHR4

2SHR2

2SHR4
4SHR2

6000

6000
3SHR4

6000
6000

4SHR4
3SHR2

586 958 452 958 343

15
5SHR2

15
1SHR1 3SHR2
1SHR3 5SHR4
3SHR4

204

170
586 958 452 958 346 15 15

750

750
650

670
2HR4 218 233 218 233
4HR4

937

937
2HR1 4HR1
301

300

301

300
01/B3 01/B3
01/B3 01/B3
750 2000 550 750 2100 450
3300
3300

HANDRAIL PLAN AT EL. 112.420 (T.O.S.) HANDRAIL PLAN AT EL. 115.220 (T.O.S.) HANDRAIL PLAN AT EL. 118.020 (T.O.S.) HANDRAIL PLAN AT EL. 120.820 (T.O.S.)

750 1000 1100 450


01/03 01/AUX 01/03 01/AUX
7HR9
3300

750 350 650 1100 450 01/B


01/B

307
01/B
586 5HR1 5HR5
115

813
8STR3 CONTRACTOR REFERANCE DWG NO. :

1309
01/B 7STR2 P055AZOR-01-28-1-S008-001-REV-B
P055AZOR-01-28-1-S008-002-REV-B
300

301

1200
7STR3 8STR1 P055AZOR-01-28-1-S008-003-REV-C
8HR8 P055AZOR-01-28-1-S008-004-REV-B
937

219 233
5HR3 P055AZOR-01-28-1-S008-005-REV-B
670
750

15 P055AZOR-01-28-1-S008-006-REV-A
P055AZOR-01-28-1-S008-007-REV-B
120

6SHR2 8STR3

1804
15

6SHR4 7STR3

1200
586 958 452 958 346

8HR2
7STR2 8STR1

6000
6SHR2
6000
6000

1200
6SHR4 1000 950 350 4 07.08.2017 ISSUED FOR CONSTRUCTION RMK KJC PJF
590 950 460 950 350
5SHR4 8STR3 3 20.07.2017 ISSUED FOR CONSTRUCTION RR KJC PJF
6000

8STR1 2 20.06.2017 ISSUED FOR CONSTRUCTION RR KJC PJF


5SHR2
1 30.05.2017 ISSUED FOR CONSTRUCTION RR KJC PJF

0 27.12.2016 ISSUED FOR CONSTRUCTION YVK KJC PJF

875
B 30.11.2016 ISSUED FOR RE-APPROVAL RR KJC PJF

A 28.10.2016 ISSUED FOR APPROVAL KSS KJC PJF


586 958 452 958 346
REV DATE DESCRIPTION DWN CHK APVD
7SHR2
7SHR4

875
Al-Zour Refinery Project
15 8STR3 (Contract No.: ZOR/EPC-

991
8STR1
750
670

0055-A-Main Process Units)


218 233
937

343
6HR1 01/B3 Al-Zour Refinery Project
301

300

01/B3 PROJECT NO : 10031/P055AZOR UNIT : 01


01/B3 PURCHASE ORDER NUMBER (RFP) : 1003114020 EQUIPMENT : S008
3300 8HR6
100

145 REVIEW RESPONSE BY PURCHASER :


550 1000 1100 650 Purchaser review and comments do not indicate the responsibility or liability for accuracy and completeness
of this documemt or alter any contractual terms and conditions :
750 2100 450
01/B3 3300 REJECTED NOT ACCEPTED REVIEWED WITH COMMENTS REVIEWED WITHOUT COMMENTS

3300 01/03 01/AUX 01/03 01/AUX COMMENTS AS NOTED REVIEWED AS BUILT FOR INFORMATION

HANDRAIL PLAN AT EL. 129.220 (T.O.S.) HANDRAIL PLAN AT EL. 132.500 (T.O.S.) VENDOR INDENTIFICATION :

HANDRAIL PLAN AT EL. 126.420 (T.O.S.)


DOCUMENT TITLE : 01 CRUDE UNIT BATTERY LIMIT PIPE RACK
HANDRAIL PLAN AT EL. 123.620 (T.O.S.) ERECTION DRAWING

HANDRAIL PLAN PLANS-1


ERECTION NOTES: REV : CODE : PLD-0010
VENDOR DOCUMENT No : CS-16127-9-01-S008-E1026
1. ALL MARKS ARE TO BE PREFIXED WITH : 9-01-S008 4
2. ALL DIMENSIONS ARE IN MILLIMETRES. REV : DOCUMENT SIZE :
CONTRACTOR DOCUMENT No :
Tekla structures

A1
3. : DENOTES ORIENTATION MARK.
REV : PAGES :
VENDOR DOCUMENT No : 28

COMPANY CATEGORY :

Vous aimerez peut-être aussi