Vous êtes sur la page 1sur 1

01/03 01/AUX

01/03 01/AUX
01/03 01/AUX 3300 3300
01/03 01/AUX
750 2100 450 750 2100 450

01/A1 2HR2
01/A1 01/A1

301

300
01/A1 4HR2

301

300

937
218 233
218 234

670
937

750
4HR3 15
5SHR3

650
586 958 452 958 346 2HR3

750
15
3SHR3
1SHR2 5SHR1
1SHR4
3SHR1

586 958 452 958 346

3SHR3

3SHR1
6000

6000

6000
4SHR1

6000
2SHR3
4SHR3
2SHR1

586 958 452 958 346

586 958 452 958 346


2SHR3
2SHR1 4SHR1
15
750

670
219 233 15 4SHR3

750

670
937

1HR4 219 233

937
300

301

3HR3

300

301
01/A
01/A 01/A
1HR2
01/A
750 2100 450 3HR2
750 2100 450
3300
3300

HANDRAIL PLAN AT EL. 112.420 (T.O.S.) HANDRAIL PLAN AT EL. 115.220 (T.O.S.) HANDRAIL PLAN AT EL. 118.020 (T.O.S.) HANDRAIL PLAN AT EL. 120.820 (T.O.S.)
01/03 01/AUX

01/03 01/AUX 3300


01/A1
444 1106 1206 544
3300 CONTRACTOR REFERANCE DWG NO. :
8HR7
750 2100 450 01/A1
P055AZOR-01-28-1-S008-001-REV-B
100

01/A1 P055AZOR-01-28-1-S008-002-REV-B
P055AZOR-01-28-1-S008-003-REV-C
01/A1 P055AZOR-01-28-1-S008-004-REV-B
301

300
6HR2 8HR15 P055AZOR-01-28-1-S008-005-REV-B

995

1060
P055AZOR-01-28-1-S008-006-REV-A
937

218 233 P055AZOR-01-28-1-S008-007-REV-B


670

750

15
586 958 452 958 346 7SHR1

7SHR3

1250
8STR2
5SHR3
8HR13
5SHR1 8HR1
6000

590 950 460 950 8STR4


6000

1250
6000
7STR1 8STR2
9NSHR5
6000

4 07.08.2017 ISSUED FOR CONSTRUCTION RMK KJC PJF

6SHR1 3 20.07.2017 ISSUED FOR CONSTRUCTION RR KJC PJF

2 20.06.2017 ISSUED FOR CONSTRUCTION RR KJC PJF


6SHR3 7STR4 30.05.2017 ISSUED FOR CONSTRUCTION RR KJC PJF
1

1804
6SHR3 0 27.12.2016 ISSUED FOR CONSTRUCTION YVK KJC PJF
6SHR1 5NHR4
586 958 452 958 346
B 30.11.2016 ISSUED FOR RE-APPROVAL RR KJC PJF
8STR4 9NSTR1
15 A 28.10.2016 ISSUED FOR APPROVAL KSS KJC PJF
750

218 233 REV DATE DESCRIPTION DWN CHK APVD


934

8STR2
620

7STR1
1309
300

750 450 259 7STR4 8STR4 Al-Zour Refinery Project


01/A

813
(Contract No.: ZOR/EPC-
415

424

0055-A-Main Process Units)


5HR2
01/A
5NHR1 Al-Zour Refinery Project
700

5NHR3 7HR10 01/A PROJECT NO : 10031/P055AZOR UNIT : 01


1071

PURCHASE ORDER NUMBER (RFP) : 1003114020 EQUIPMENT : S008


01/A 750 1000 1100 450
REVIEW RESPONSE BY PURCHASER :
Purchaser review and comments do not indicate the responsibility or liability for accuracy and completeness
of this documemt or alter any contractual terms and conditions :
426

REJECTED NOT ACCEPTED REVIEWED WITH COMMENTS REVIEWED WITHOUT COMMENTS

01/03 01/AUX 01/03 01/AUX


46

5NHR2 COMMENTS AS NOTED REVIEWED AS BUILT FOR INFORMATION

291 1049 562


HANDRAIL PLAN AT EL. 126.420 (T.O.S.) HANDRAIL PLAN AT EL. 129.220 (T.O.S.) HANDRAIL PLAN AT EL. 132.500 (T.O.S.) VENDOR INDENTIFICATION :

3300
DOCUMENT TITLE : 01 CRUDE UNIT BATTERY LIMIT PIPE RACK
ERECTION DRAWING

HANDRAIL PLAN AT EL. 123.620 (T.O.S.) HANDRAIL PLAN PLANS-2


ERECTION NOTES: REV : CODE : PLD-0010
VENDOR DOCUMENT No : CS-16127-9-01-S008-E1027
1. ALL MARKS ARE TO BE PREFIXED WITH : 9-01-S008 4
2. ALL DIMENSIONS ARE IN MILLIMETRES. REV : DOCUMENT SIZE :
CONTRACTOR DOCUMENT No :
Tekla structures

A1
3. : DENOTES ORIENTATION MARK.
REV : PAGES :
VENDOR DOCUMENT No : 28

COMPANY CATEGORY :

Vous aimerez peut-être aussi