Phase shorting to be done between TBC side isolator 89T and GCB. with shorting conductors capable of 500 A.
Switch ON the excitation & note down readings as per prescribed format.
After finishing differential Stability test .Reduce excitation to 60% of rated current and O/C Setting to be reduced to
get desired tripping , for checking differential protection CT Polarity to be revered at GRP and increase the
R-phase to earth shorting to be done by earthling rod at LASCPT panel and relay operation to be ensured.
Voltage build-up test to be carried out first in Manual and then in Auto channel, change over of channel and tuning
of PID.
Switch ON excitation & increase the voltage note down the readings as per OCC format at Various locations.
6. Generator Over voltage and under voltage Protection checking as per format
7. Generator Over frequency and under frequency protection checking as per format
Shorting to be done at NGT to earth and 100% Stator Earth Fault relay operation to be ensured with actual settings
9. Actual Reverse Power protection to be checked, when shut the turbine on the same day
Note: Generator Commissioning Procedure, safety, testing parameters, Load and no load Curves to be
followed as per approved Siemens generator Commissioning manual.
Page 1 of 19
Dynamic Testing Procedure & Test Sheet
Note: Discuss with turbine operator, during dynamic test the following points are bypass the
electrical protection.
03 GRP-A relay (7UM) trip status to TCC ROT-9,10 ( Simulation to be done in the Turbine PLC )
06 GRP-B Relay (7UM) trip status to TCC ROT-11&12 ( Simulation to be done in the Turbine PLC )
11. Ensure deployment of identified manpower at generator, transformer yard and switchyard.
12. Ensure Generator cooling system is in service (WLD Healthiness to be ensured before SCC Test)
Page 2 of 19
Dynamic Testing Procedure & Test Sheet
Stability Readings
81.85
ARCT:1 (C110) 0.40 A 0.819 A
mA
81.85
ARCT:2 (C130) 0.40 A 0.819 A
Generator mA
Generator Line
Protection
Side CT: Core 1
GRP-1 81.85
ARCT:3 (C150) 0.40 A 0.819 A
mA
ARCT:4 (C170) 0 mA 0A 0A
81.85
ARCT:5 (C210) 0.40 A 0.819 A
mA
81.85
ARCT:6 (C230) 0.40 A 0.819 A
Generator Generator mA
Neutral Side Protection
CT: Core1 GRP-1 81.85
ARCT:7 (C250) 0.40 A 0.819 A
mA
ARCT:8 (C270) 0 mA 0A 0A
ARCT:9 (C310)
Neutral CT at 95% stator
NGT earth fault
ARCT:10 (C370)
Remarks
Page 3 of 19
Dynamic Testing Procedure & Test Sheet
Relay T.B. Details & 10% (573 A) 50% (2868 A) 100% (5736 A)
CT details Purpose Display Relay backside
Path ferrule details
Expected Actual Expected Actual Expected Actual
81.85
BRCT:1 (C410) 0.40 A 0.819 A
mA
81.85
Generator Line Generator BRCT:2 (C430) 0.40 A 0.819 A
mA
Side CT: Core 2 Protection
(700/1A) GRP-2 81.85
BRCT:3 (C450) 0.40 A 0.819 A
mA
BRCT:4 (C470) 0 mA 0A 0A
81.85
BRCT:5 (C510) 0.40 A 0.819 A
mA
81.85
Generator Generator BRCT:6 (C530) 0.40 A 0.819 A
mA
Neutral Side Protection
CT: Core 2 GRP-2 81.85
BRCT:7 (C550) 0.40 A 0.819 A
mA
BRCT:8 (C570) 0 mA 0A 0A
BRCT:9 (C610)
Neutral at NGT 95% Stator
CT core 2 earth fault
BRCT:10 (C670)
20-CT1 (C410)
Miniature CT at 100 % Stator
NGT earth fault
20-CT2 (C470)
Remarks
Stability reading
Page 4 of 19
Dynamic Testing Procedure & Test Sheet
TB1- 14 0 mA 0A 0A
78.57
GT HV Side CT TB1- 33 0.39 A 0.786 A
mA
TB1- 39 0 mA 0A 0A
GT HV CT TB1- 53
HV Side REF
TB1-55
CTR 450/1 A
Remarks
Page 5 of 19
Dynamic Testing Procedure & Test Sheet
Switchyard
TB1 -22 0 mA 0A 0A
220 KV Swyd
TB1 -8 20.5 mA 102 mA 205 mA
Side CT
Page 6 of 19
Dynamic Testing Procedure & Test Sheet
GT MB
GENERATOR DYNAMIC TESTING
Transformer
Please Ensure fan & pump should running condition
Yard
HV Side WTI
T277 0.184 A 0.924 A 1.84 A
CT
WTI NA
(CTR 425/2A) T278 0.184 A 0.924 A 1.84 A
LV Side WTI
(CTR5
T280 0.195 A 0.976A 1.95 A
875/2A)
LV Side HV
GT WTI
Temp Side
GT OTI
Page 7 of 19
Dynamic Testing Procedure & Test Sheet
81.85
MCT-2 (D30) 0.40 A 0.819 A
Generator Line mA
Metering
Side CT: Core 2 81.85
MCT-3 (D50) 0.40 A 0.819 A
mA
MCT-4 (D70) 0 mA 0A 0A
Page 8 of 19
Dynamic Testing Procedure & Test Sheet
81.85
X11-01 0.40 A 0.819 A
mA
81.85
X11-03 0.40 A 0.819 A
Generator Line For AVR mA
Side CT: Core 3 Channel 1 81.85
X11-05 0.40 A 0.819 A
mA
X11-06 0 mA 0A 0A
81.85
X21-01 0.40 A 0.819 A
mA
81.85
Generator Line For AVR X21-03 0.40 A 0.819 A
mA
Side CT: Core 3 Channel 2 81.85
X21-05 0.40 A 0.819 A
mA
X21-06 0 mA 0A 0A
R 573.6 A 2868 A 5736 A
Field Current
Field Voltage
Page 9 of 19
Dynamic Testing Procedure & Test Sheet
Stability reading
81.85
B50.X3 101 0.40 A 0.819 A
mA
81.85
NA B50.X3 102 0.40 A 0.819 A
mA
Generator Line Turbine
side CT: Core 2 control 81.85
B50.X3 103 0.40 A 0.819 A
mA
81.85
B50.X3 104 0.40 A 0.819 A
mA
Page 10 of 19
Dynamic Testing Procedure & Test Sheet
Excitation should be zero when the polarity, At this test swap R & B on secondary side of the CT in both the Relays
GRP-1 : 86 A1
0.05 I/I Nominal GRP-2 : 86 A2
L1 & L2 Relay should be operated value (286.8A)
Page 11 of 19
Dynamic Testing Procedure & Test Sheet
Open isolator of TBC ( 2-5-89C) and ensure all relevant isolator status in
Switch yard for start OCC Test
NGR, LA, SC&PT, IBPD Inspection door to be closed and same to be ensured
After getting clearance for OCC Test, close the Field Breaker and Note down the reading below formats
Channel-1
X10 2-3 110V
X10 3-1 110V
X20 1-4 63.5V
Channel-2
X20 2-4 63.5V
X20 3-4 63.5V
Page 12 of 19
Dynamic Testing Procedure & Test Sheet
Page 13 of 19
Dynamic Testing Procedure & Test Sheet
BRPT
22 V 55 V 77 V 110 V
2-3
BRPT
22 V 55 V 77 V 110 V
3-1
Page 14 of 19
Dynamic Testing Procedure & Test Sheet
TB No. Sequence
TB1-25
R5B (BCU) 63.5V
TB1-26
TB1-27
R5B (Synch.) 63.5V
TB1-28
Page 15 of 19
Dynamic Testing Procedure & Test Sheet
Page 16 of 19
Dynamic Testing Procedure & Test Sheet
Actual Overvoltage settings to be decreased to below values for checking O/V Settings
Decrease overvoltage Alarm stage-1: 113V
Decrease over voltage setting Stage-2: 115V (16.46KV)
a. Simulate the GCB and UAT on Feedback to both relays ,Shorting to be done at TB:ARIT-1,2 &BRIT-1,2 .
b. Increase under frequency actual setting Stage 1- 49.5Hz (2970RPM) and under
frequency trip Stage -2 to 49Hz(2940Hz)
c. Reduce the turbine speed to check above under frequency protection Stag-1&2
Page 17 of 19
Dynamic Testing Procedure & Test Sheet
Reduce the excitation set point to zero, then shorting to be done at NGT and ensure the relay operation.
6V 86 A1
Normalize all the protection & proceed for dead bus synchronization as per formulated procedure.
Page 18 of 19
Dynamic Testing Procedure & Test Sheet
After dead bus synchronization following readings to be taken at Bus Coupler Panel for ensuring correct phase sequence.
Phasing Out