JOB Code : 0-5353-20 Log List for SH Comments

PJ Name : Gassi Touil Project


(Building Works)

Rev.2 As of 27 Dec 2010


Proposed Change Amount
Serial (USD)
Description Original Contractual Requirements SH Comments Reference Document Remarks
No.
Positive Negative

Main Substation:
Complete by providing MAIN SUBSTATION FLOOR
1 Additional Access from Switchgear Room to Access from outdoor only D-6E0-134A-001 0 2,772
- an access from switchgear room to cable room PLAN
Cable Space

Main Substation: MAIN SUBSTATION FLOOR


2 Single Door only - double swing door on north switchgear room D-6E0-134A-001 0 68,857
Additional Double Swing Door PLAN

Main Substation:
- Additional fire wall between HV area and LV area MAIN SUBSTATION FLOOR
3 Additional Fire Wall between HV Area and LV One Room for HV & LV Switchgear D-6E0-134A-001 0 44,956 As per M-GT-JY/SHY-0026 Rev.1
without door to be provided. PLAN
Area

Main Substation: MAIN SUBSTATION FLOOR


4 One CO2 Cylinder Shed for HV & LV Switchgear Room - Dedicated CO2 Cylinder Shed to be provided. D-6E0-134A-001 0 43,451 As per M-GT-JY/SHY-0026 Rev.1
Dedicated CO2 Cylinder Shed PLAN

Provide one desk , one desktop computer and two


Main Substation: MAIN SUBSTATION FLOOR
5 No Space for a Desk printers for Essential Room D-6E0-134A-001 1 8,819 Hadji-san requested it on 24 MAR 2010.
Additional Desk space PLAN
Space to be verified

Main Substation: Cable space area should be closed against sand storm. MAIN SUBSTATION ELEVATION
6 Wire Mesh Fence D-6E0-134A-002 0 88,120
Additional Wall for Cable Space Wire mesh for cable space area is inacceptable AND SECTION

Main Substation: MAIN SUBSTATION ELEVATION


7 No Rain Water Downspout - provide on the water the rainwater discharge system D-6E0-134A-002 0 9,575
Additional Rain Water Downspout AND SECTION

MAIN SUBSTATION FINISHING


Main Substation: provide for cable space floor sand and ceramic tile for
8 Backfilling only D-6E0-134A-003 SCHEDULE (INTERIOR AND 0 48,360
Additional Ceramic Tile Walkway in Cable Space walkway
EXTERIOR)

Main Substation: MAIN SUBSTATION DOOR AND


9 External Single Door only SD1, SD3, SD4 - equipped with bar panic system D-6E0-134A-004 0 1,656
Additional Panic Bar for Doors WINDOW SCHEDULE

Main Substation: - SD-2, SD-3, SD-5, SD-6 change width (W) of doors 900 MAIN SUBSTATION DOOR AND
10 850mmW D-6E0-134A-004 1 933 Clarified with Hadji-san on 03 MAR 2010
Change of Door Width (900mm) instead 850. WINDOW SCHEDULE

Main Substation: - Split AC with essential power for Essential Room to be MAIN SUBSTATION DOOR AND
11 Central HVAC only D-6E0-134A-004 1 19,557 Requested by Hadji-san on 02 MAR 2010
Additional Split AC for Essential Room provided WINDOW SCHEDULE

Laboratory: Complete by providing:


12 No Apron D-5L0-134L-001 LABORATORY FLOOR PLAN 0 5,320 Also requested by M-GT-JY/SHY-0017
Additional Concrete Apron - concrete paving around the building

Laboratory:
13 Concrete Block provide wall of cylinder shed in Reinforced concrete. D-5L0-134L-001 LABORATORY FLOOR PLAN 0 791
RC Wall for Cylinder Sheds

Laboratory:
14 No Canopy - Provide RC canopy D-5L0-134L-001 LABORATORY FLOOR PLAN 1 3,254 Hadji-san requested it on 03 MAR 2010.
Additional Canopy

Laboratory:
- complete by providing ceiling for chemical and product LABORATORY ELEVATION AND
15 Additional False Ceiling for Chemical and Product No False Ceiling D-5L0-134L-002 0 3,836
storage room. SECTION
Storage Room

Laboratory: - Review the elevation of building (at least 2 steps/ground LABORATORY ELEVATION AND
16 GL+300mm D-5L0-134L-002 0 64,229 Revised by SH E-mail on 17 DEC 2001
Raise of Floor Elevation (GL+450mm) level) SECTION

Laboratory: LABORATORY ELEVATION AND


17 No Rain Water Downspout - define on the drawing the rainwater discharge system D-5L0-134L-002 0 4,276
Additional Rain Water Downspout SECTION

Laboratory: LABORATORY DOOR AND


18 No Panic Bar - Complete by providing panic bars to BD/1 and BD/2 D-5L0-134L-004 0 2,208
Additional Panic Bar for doors WINDOW SCHEDULE

Laboratory: LABORATORY DOOR AND


19 850mmW - Change the width of door 900 instead of 850mm. D-5L0-134L-004 1 386 Clarified with Hadji-san on 03 MAR 2010
Change of Door Width (900mmW) WINDOW SCHEDULE

- Addition of signal failure of the BLDG pressurization


Laboratory: LABORATORY BASIC HVAC
20 No alarm system shall signal a visual & audible alarm in LAB D-5L-134L-051 1 3,673 C-GT-SHY/JY-0977
Additional Failure Alarm for Room Pressurization FLOW SCHEME
(locally)

Laboratory: LABORATORY BASIC HVAC


21 Not specified - alarm shall be visual and audible D-5L-134L-051 2 1,842
Additional Visual and Audible Alarm FLOW SCHEME

Main Control Building: MAIN CONTROL BUILDING


22 No Apron - provide concrete paving around the building D-5C0-134B-001 0 4,788 Also requested by M-GT-JY/SHY-0017
Additional RC Apron FLOOR PLAN

Main Control Building: - change the dry wall partition in steel partition with phonic MAIN CONTROL BUILDING
23 Dry Wall Partition D-5C0-134B-001 0 76,123
Change Type of Interior Wall (Steel Partition) insulation FLOOR PLAN

Main Control Building: - Low partition walls between urinals to be provided. MAIN CONTROL BUILDING
24 No Partition D-5C0-134B-001 0 1,582
Additional Low Partition Wall for Urinals (Common Comments for all toilets) FLOOR PLAN

COMMENTS FROM MEETINGS OF 9~11 DEC.


Main Control Building: - Canopy to be provided for main entrance. (Common MAIN CONTROL BUILDING
25 No Canopy D-5C0-134B-001 0 4,880 2009 And Hadji-san requested RC canopy on 03
Additional Canopy for Main Entrance comment for Administration BLDG) FLOOR PLAN MAR 2010.

Main Control Building: - Automatic Fire Extinguishing System to be applied to


MAIN CONTROL BUILDING
26 Additional Automatic Fire Extinguishing System Indoor Hose Station only UPS Room & Telecom Room in unmanned buildings" D-5C0-134B-001 0 57,949 As per M-GT-JY/SHY-0045
FLOOR PLAN
for UPS Room & Telecom Room (MCB & ADM)
Main Control Building: Hadji-san requested it on 17 MAR 2010.
- Provide one sink with cold & hot water service for Mess MAIN CONTROL BUILDING
27 Additional Hot Water Supply to Sink for Mess No Hot Water D-5C0-134B-001 1 2,312 Only Hot water service is additional as Kitchen Sink
Room FLOOR PLAN + Cold water service are part of original concept.
Room

Main Control Building: MAIN CONTROL BUILDING


28 No Dedicated Emergency Corridor & Exit Door - Provide corridor & emergency exit door D-5C0-134B-001 2 23,949 C-GT-SHY/JY-0943
Additional Emergency Corridor & Exit Door FLOOR PLAN

Main Control Building: Complete by providing: MAIN CONTROL BUILDING


29 No False Ceiling D-5C0-134B-002 0 47,495
Additional False Ceiling for Rack Room - Ceiling for rack room ELEVATION AND SECTION

MAIN CONTROL BUILDING


Main Control Building:
30 No Panic Bar Provide BD/1 panic bar system D-5C0-134B-005 DOOR AND WINDOW 0 1,104
Additional Panic Bar for doors
SCHEDULE
MAIN CONTROL BUILDING
Main Control Building:
31 1700mmW x 2100mmH - BD-2 change in 1800 x 2500 D-5C0-134B-005 DOOR AND WINDOW 1 874
Change of Door Size (1800mmW x 2200mmH)
SCHEDULE
MAIN CONTROL BUILDING
Main Control Building:
32 850mmW - SD-2 change in 900 x 2100 instead 850 x 2100 D-5C0-134B-005 DOOR AND WINDOW 1 196
Change of Door Width (900mW)
SCHEDULE
MAIN CONTROL BUILDING
Main Control Building:
33 850mmW - WD-1 change 900 x 2100 instead 850 x 2100 D-5C0-134B-005 DOOR AND WINDOW 1 202
Change of Door Width (900mmW)
SCHEDULE Hadji-san agreed that double leaf doors to be
1700mm and not 1800mm on 03 MAR 2010.
MAIN CONTROL BUILDING
Main Control Building:
34 850mmW - WD-3 change in 900 instead 850mm D-5C0-134B-005 DOOR AND WINDOW 1 202
Change of Door Width (900mmW)
SCHEDULE
MAIN CONTROL BUILDING
Main Control Building:
35 800mmW - WD-6 change in 900 instead 800 D-5C0-134B-005 DOOR AND WINDOW 1 101
Change of Door Width (900mmW)
SCHEDULE

Administration RC Building: ADMINISTRATION BUILDING


36 No Apron - concrete paving around the building D-BID-134P-001 0 7,595 Also requested by M-GT-JY/SHY-0017
Additional Apron FLOOR PLAN

Administration Building:
change the (02) open offices in (02) offices with (02) ADMINISTRATION BUILDING
37 Change of Room Layout 2 Offices D-BID-134P-001 0 35,183
secretary office. FLOOR PLAN
(2 Offices with 2 Secretary Offices)
Administration Building: - change the three offices in First floor in (01) office with
ADMINISTRATION BUILDING
38 Change of Room Layout 3 Offices (01) secretary office D-BID-134P-001 0 17,133
FLOOR PLAN
(2 Offices with 2 Secretary Offices) (01) office with (01) secretary office

Administration Building: ADMINISTRATION BUILDING


39 No Window - External Windows to be added for Classroom-1 & 2. D-BID-134P-001 0 9,017
Additional Windows FLOOR PLAN

Administration Building: - External windows to be added for the new offices ADMINISTRATION BUILDING
40 No Window D-BID-134P-001 0 158,729
Additional Windows instead of Open Office-1 & 2. FLOOR PLAN

Administration Building:
- Open Office-1 to be change to 2 Offices for 2 persons ADMINISTRATION BUILDING
41 Change of Room Layout One Open Office D-BID-134P-001 0 17,591
each. FLOOR PLAN
(2 Offices)
Administration Building:
- Open Office-2 to be changed to HSE Safety Manager ADMINISTRATION BUILDING
42 Change of Room Layout One Open Office D-BID-134P-001 0 17,591
Room and one Secretary Room. FLOOR PLAN
(1 MGR Office with 1 Secretary Room)

Administration Building: - Low partition walls between urinals to be provided. ADMINISTRATION BUILDING
43 No Low Partition Wall D-BID-134P-001 0 336
Additional Low Partition Wall for Urinals (Common Comments for all toilets) FLOOR PLAN

1 / 4
JOB Code : 0-5353-20 Log List for SH Comments
PJ Name : Gassi Touil Project
(Building Works)

Proposed Change Amount


Serial (USD)
Description Original Contractual Requirements SH Comments Reference Document Remarks
No.
Positive Negative

Administration Building: - Automatic Fire Extinguishing System to be applied to


ADMINISTRATION BUILDING
44 Additional Automatic Fire Extinguishing System Indoor Hose Station only UPS Room & Telecom Room in unmanned buildings" D-BID-134P-001 0 140,481 As per M-GT-JY/SHY-0045
FLOOR PLAN
for UPS Room & Telecom Room (MCB & ADM)

Administration Building: ADMINISTRATION BUILDING


45 No Space for a Desk - Provide desk for Telecom Supervisors (Two persons) D-BID-134P-001 1 2,487
Additional Desk Space FLOOR PLAN

Administration Building: - Toilet area (G FL) , provide toilet, ablution and prayer ADMINISTRATION BUILDING
46 No Ablution & Prayer Room D-BID-134P-001 2 8,714 C-GT-SHY/JY-1006
Additional Ablution & Prayer Room room. FLOOR PLAN

Administration Building: Review the floor level (FL) at least four (04) steps from ADMINISTRATION BUILDING
47 GL+300mm D-BID-134P-002 0 7,554
Raise of Floor Elevation (GL+500mm) the ground level ELEVATION AND SECTION

Administration Building: ADMINISTRATION BUILDING


48 No Faade - Make more proposal for faade and provide Faade D-BID-134P-002 1 15,338
Additional Faade ELEVATION AND SECTION

Administration Building:
Curtain Wall around Main Entrance ( including HVAC ADMINISTRATION BUILDING
49 Additional Glass Curtain Wall around Main Concrete Block D-BID-134P-002 1 58,565 based on M-GT-JY/SHY-0144
capacity up ) ELEVATION AND SECTION
Entrance

Administration Building: ADMINISTRATION BUILDING


50 Flat Roof without Skylight Skylight ( including HVAC capacity up ) D-BID-134P-002 1 55,776 based on M-GT-JY/SHY-0144
Additional Skylight ELEVATION AND SECTION

Administration Building: Window Area Increase from FEED Design ( including ADMINISTRATION BUILDING
51 Windows for MGT Room only D-BID-134P-002 1 78,087 based on M-GT-JY/SHY-0144
Additional Windows and HVAC Thermal Load HVAC Capacity up ) ELEVATION AND SECTION

ADMINISTRATION BUILDING
Administration Building:
52 No Panic Bar SD/1, SD/2, SD/3 with panic bar system D-BID-134P-005 DOOR AND WINDOW 0 1,656
Additional Panic Bar for Doors
SCHEDULE
Administration Building: ADMINISTRATION BUILDING
53 Change of Main Entrance Door Height 2100mmH - The main door height AD-1 shall be 2,500mm D-BID-134P-005 DOOR AND WINDOW 1 1,495
(2500mmH) SCHEDULE
Unit IB Substation:
Provide access from the switchgear room to the cable UNIT IB SUBSTATION FLOOR
54 Additional Access from Switchgear Room to Access from outdoor only D-BID-134A-001 0 630
space PLAN
Cable Space

Unit IB Substation: UNIT IB SUBSTATION FLOOR


55 One Airlock provide airlock for the entrance deck D-BID-134A-001 0 3,135
Additional Airlock PLAN

Unit IB Substation:
change location of HVAC outdoor units (on floor instead UNIT IB SUBSTATION FLOOR
56 Change of HVAC Equipment Location (on On roof D-BID-134A-001 0 23,205
of roof). PLAN
ground)

Unit IB Substation: UNIT IB SUBSTATION


57 No Rain Water Downspout complete by providing the rainwater discharge system D-BID-134A-002 0 4,676
Additional Rain Water Downspout ELEVATION AND SECTION

UNIT(IB) SUBSTATION
Unit IB Substation: Provide walkway in cable space with sand and ceramic
58 Backfilling only D-BID-134A-003 FINISHING SCHEDULE 0 9,979
Additional Ceramic Tile Walkway in Cable Space tile
(INTERIOR AND EXTERIOR)

Unit IB Substation: SD/1, SD/2, SD/3, SD/4 should be equipped with panic UNIT(IB) SUBSTATION DOOR
59 External Single Door only D-BID-134A-004 0 2,760
Additional panic Bar for Doors bar system AND WINDOW SCHEDULE

Unit IB Substation: - SD-2, SD-3, SD-5, SD-6 change the width of doors 900 UNIT(IB) SUBSTATION DOOR Hadji-san agreed that SD-6 was not applicable on 03
60 850mmW D-BID-134A-004 1 586 MAR 2010.
Change of Door Width (900mmW) instead 850mm. AND WINDOW SCHEDULE

Safety Building: Review completely the drawing and submit a floor plan on
61 Refer to contract drawing D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 2,706
Change of Room Layout ground-floor

Safety Building:
Provide on HVAC system with outdoor units on ground
62 Change of HVAC Equipment Location (on On roof D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 23,205
(instead of roof)
ground)

Safety Building:
63 Rolling Shutter Provide sectional doors instead Roller Shutter D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 5,635
Change of Shutter Type to Sectional Shutter

Safety Building:
64 Wooden Door Provide steel doors instead wood doors D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 11,302
Change of Door Type (Steel Door)

Safety Building:
65 Aluminum Door Change AD-1 in SD-1 D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 732
Change of Door Type to Steel Door

Safety Building:
66 Aluminum Door Change AD-2 in SD-2 D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 518
Change of Door Type to Steel Door

Safety Building: Windows should be provided for nurse's and doctor's


67 No Window D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 8,003
Additional Windows room (review the position)

Safety Building:
68 No Permanent Access Provide access to roof fan by inside D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 1,205 Clarification on 08 JAN 2010
Additional Access to Roof Fans

Safety Building: - Low partition walls between urinals to be provided.


69 No Low Partition Wall D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 336
Additional Low Partition Wall for Urinals (Common Comments for all toilets)

Safety Building:
70 No Apron Concrete paving on the area around the building D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 14,385 As per M-GT-JY-SHY-0017
Additional RC Apron

Safety Building: Trailer mounted lighting equipment and trailer mounted As per M-GT-JY/SHY-0045 Rev.1
71 15.5m x 19.0m = 295m2 D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 0 252,787
Increase of Fire Car Garage (359m2) pump to be added.

Safety Building:
Change of Window Size
72 900mmW x 1200mmH (3nos) - Command Room : the window shall be 1600 x 1200 D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 1 3,112
(1600mmWx1200mmH(2nos)&1200mmWx1200
mmH(1nos))

Safety Building:
73 Change of Window Size No Window - Office-6 : window shall be 1600 x 1200 D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 1 1,556
(900mmW x 1200mmH)

Safety Building:
74 No Salon - provide furniture for Salon (Sofa) D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 1 13,018
Additional Sofa Space

Safety Building:
75 Single Door for Corridor - provide double leaf door similar to SD-6 D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 1 3,965
Additional Door

Safety Building:
- the court shall be provided with ceramic tile and
76 Additional Ceramic Tile and Rain Water Sewer for No Pave D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 1 5,203
rainwater sewer
Court

Safety Building: Hadji-san agreed not to provide canopy for


77 No Canopy - Provide sunshade canopy D-BID-134F-001 SAFETY BUILDING FLOOR PLAN 1 7,066 Substations on 03 MAR 2010.
Additional Canopy

Safety Building: SAFETY BUILDING ELEVATION


78 No Rain Water Downspout Show on the drawing the rainwater discharge D-BID-134F-002 0 4,075
Additional Rain Water Downspout AND SECTION

Safety Building: SAFETY BUILDING ELEVATION


79 Translucent Panel Provide fixed windows instead translucent panel D-BID-134F-002 0 5,135
Additional Windows AND SECTION

Safety Building: SAFETY BUILDING DOOR AND


80 No Panic Bar SD-4 should be equipped with anti-panic door D-BID-134F-005 0 552
Additional Panic Bar WINDOW SCHEDULE

Safety Building: SAFETY BUILDING DOOR AND


81 900mmW x 1200mmH - office-5 : windows shall be 1600 x 1200 D-BID-134F-005 1 1,556
Change Window Size WINDOW SCHEDULE

Safety Building: SAFETY BUILDING BASIC HVAC


82 Central HVAC only - Provide emergency HVAC type SAC for First Aid Room D-BID-134F-051 1 50,321
Additional Emergency Split AC for First Aid Room FLOW SCHEME

Warehouse:
83 Translucent Panel - fixed windows instead translucent panels D-BID-134N-001 WAREHOUSE FLOOR PLAN 0 34,237
Additional Windows

- Additional one rolling shutter for 10 ton truck to be


Warehouse: COMMENTS FROM MEETINGS OF 9~11 DEC.
84 No Shutter provided on the east wall between grid-B and grid-C. D-BID-134N-001 WAREHOUSE FLOOR PLAN 0 2,413 2009
Additional Rolling Shutter

Warehouse: - One WD-1 to be deleted and one window to be added COMMENTS FROM MEETINGS OF 9~11 DEC.
85 One Wooden Door and No Window D-BID-134N-001 WAREHOUSE FLOOR PLAN 0 7,132 2009
Additional Windows for Office.

Warehouse: - Fence for Drawer/Cupboard/B.W Rack to be changed to COMMENTS FROM MEETINGS OF 9~11 DEC.
86 Additional Interior Wall, False Ceiling and Interior Fence Wall, No False Ceiling and Natural Ventilatiosolid wall and false ceiling & mechanical ventilation to be D-BID-134N-001 WAREHOUSE FLOOR PLAN 0 23,537 2009
Mechanical Ventilation for Drawer/Cupboard/Bin added for Drawer/Cupboard/Bin Rack. Mechanical Ventilation to be added.
R k

2 / 4
JOB Code : 0-5353-20 Log List for SH Comments
PJ Name : Gassi Touil Project
(Building Works)

Proposed Change Amount


Serial (USD)
Description Original Contractual Requirements SH Comments Reference Document Remarks
No.
Positive Negative

Warehouse: COMMENTS FROM MEETINGS OF 9~11 DEC.


87 One Office only - One office to be added for a material controller. D-BID-134N-001 WAREHOUSE FLOOR PLAN 0 34,833 2009
Additional Office

Warehouse:
88 No Apron Concrete paving on the area around the building D-BID-134N-001 WAREHOUSE FLOOR PLAN 0 7,140 As per M-GT-JY-SHY-0017
Additional RC Apron

Warehouse: Hadji-san agreed not to provide canopy for


89 No Canopy - Provide sunshade canopy D-BID-134N-001 WAREHOUSE FLOOR PLAN 0 2,874 Substations on 03 MAR 2010.
Additional Canopy

Warehouse:
90 No Lay down Area outdoor - Provide lay down area outside D-BID-134N-001 WAREHOUSE FLOOR PLAN 0 40,887 Hadji-san requested on 17 MAR 2010
Additional Lay down Area

Warehouse:
91 No Indoor Space for Track - Consider access of big truck (13mL) inside of BLDG D-BID-134N-001 WAREHOUSE FLOOR PLAN 0 12,829 Hadji-san requested on 17 MAR 2010
Additional Space for Big Truck

Warehouse: WAREHOUSE ELEVATION AND


92 No Permanent Access for Roof Fan - provide access to fan roof D-BID-134N-002 0 3,099
Additional Access for Roof Fan SECTION

Warehouse:
- roof for warehouse shall be considered as a technical WAREHOUSE ELEVATION AND
93 Change of Roof Type (Flat Roof) Steel Sheet Slope Roof D-BID-134N-002 1 1,504 C-GT-SHY/JY-1015
roof (access for fans) SECTION

Warehouse: WAREHOUSE DOOR AND


94 No Panic Bar - provide panic bar system for SD/2 D-BID-134N-004 0 1,104
Additional Panic Bar for Doors WINDOW SCHEDULE

Warehouse: WAREHOUSE DOOR AND


95 900mmW - AW-1 to be 1200x1200 instead of 900x1200 D-BID-134N-004 1 724 C-GT-SHY/JY-1019
Change of Window Width (1200mmW) WINDOW SCHEDULE

EP Maintenance Building: Review the access to offices 6,7,8 by warehouse . EP MAINTENANCE SHOP
96 Corridor D=BID-134M-101 0 -1,021
Deletion of Corridor Remove corridor (office 1 to 5) to offices (6 to 8) FLOOR PLAN

EP Maintenance Building: EP MAINTENANCE SHOP


97 No Permanent Access for Roof Fan Provide access to roof and roof fan D=BID-134M-101 0 2,135
Additional Access for Roof Fans FLOOR PLAN

EP Maintenance Building: - Low partition walls between urinals to be provided. EP MAINTENANCE SHOP COMMENTS FROM MEETINGS OF 9~11 DEC.
98 No Low Partition Wall for Urinals D=BID-134M-101 0 1,582 2009
Additional Low Partition Wall for Urinals (Common Comments for all toilets) FLOOR PLAN

EP Maintenance Building: EP MAINTENANCE SHOP


99 No Apron Concrete paving on the area around the building D=BID-134M-101 0 10,336 As per M-GT-JY-SHY-0017
Additional RC Apron FLOOR PLAN

EP Maintenance Building: EP MAINTENANCE SHOP


100 No Locker Room with Shower - Locker Room with shower to be added D=BID-134M-101 0 39,642 Requested by Hadji-san on 04 MAR
Additional Locker Room with Shower FLOOR PLAN

EP Maintenance Building: EP MAINTENANCE SHOP Hadji-san agreed not to provide canopy for
101 No Canopy - Provide sunshade canopy D=BID-134M-101 0 3,593 Substations on 03 MAR 2010.
Additional Canopy FLOOR PLAN

EP Maintenance Building:
EP MAINTENANCE SHOP
102 Relocation of Toilet/Locker Shower/Prayer Room Interior Zone - Review location of toilet / Locker Shower / Prayer Room D=BID-134M-101 1 57,957 Tanabe-san e-mail on 16 Apr 2010
FLOOR PLAN
(Exterior Zone)

EP Maintenance Building: - Small windows shall be provided for locker and prayer EP MAINTENANCE SHOP
103 No Window D=BID-134M-101 1 2,292
Additional Window for Locker and Prayer Room room FLOOR PLAN

EP Maintenance Building: Provide fixed windows instead translucent panel on north EP MAINTENANCE SHOP
104 Translucent Panel D-BID-134M-102 0 40,499
Additional Windows and south elevation ELEVATION AND SECTION

EP Maintenance Building: EP MAINTENANCE SHOP


105 GL+150mm Review the elevation : at least three steps / ground floor D-BID-134M-102 0 141,361
Raise of Floor Elevation (GL+180mm) ELEVATION AND SECTION

Metering House:
Provide outdoor HVAC on ground instead of roof, with METERING HOUSE PLAN,
106 Change of HVAC Equipment Location On roof D-360-134Z-001 0 9,931
shelter ELEVATION AND SECTION
(on ground)

Metering House: Review the width and height of SD-1 (1200 x 2100) METERING HOUSE PLAN,
107 1200mmW x 2100mmH D-360-134Z-001 0 1,450
Change of Door Size (1200mmHx2400mmH) insufficient to allow access of material and equipment ELEVATION AND SECTION

Metering House: Show on the drawing the rainwater evacuation (drainage) METERING HOUSE PLAN,
108 No Rain Water Downspout D-360-134Z-001 0 2,049
Additional Rain Water Downspout (rainwater discharge) ELEVATION AND SECTION

Metering House: METERING HOUSE PLAN,


109 No Apron Concrete paving on the area around the building D-360-134Z-001 0 1,918 As per M-GT-JY-SHY-0017
Additional RC Apron ELEVATION AND SECTION

Metering House: METERING HOUSE DOOR AND


110 No Panic Bar Provide anti-panic bar for outdoors SD-1 and SD-2 D-360-134Z-003 0 1,656
Additional Panic Bar for Doors WINDOW SCHEDULE

Metering House: METERING HOUSE DOOR AND


111 Floor Hardener - provide ceramic tile in the air lock D-360-134Z-003 1 487
Additional Ceramic Tiles for Air Lock WINDOW SCHEDULE

Maintenance Building: MAINTENANCE BUILDING


112 No Apron Complete by concrete paving around the building D-BID-134M-001 0 13,273 Also requested by M-GT-JY/SHY-0017
Additional RC Apron FLOOR PLAN

Maintenance Building: Review the width of corridor (1200mm) at least > MAINTENANCE BUILDING
113 1200mmW D-BID-134M-001 0 1,246
Change of Corridor Width (1850mmW) 1500mm FLOOR PLAN

Maintenance Building: MAINTENANCE BUILDING


114 No Permanent Access for Roof Fan Provide access to roof and roof fan D-BID-134M-001 0 3,443
Additional Access for Roof Fans FLOOR PLAN

Provide fixed windows for:


- garage
Maintenance Building: MAINTENANCE BUILDING
115 Translucent Panel - open general machinery D-BID-134M-001 0 21,827
Additional Windows FLOOR PLAN
- open area workshop
- assembly welding area

Maintenance Building:
Divide the garage in electrical and instrumentation area, MAINTENANCE BUILDING
116 Additional Electrical & Instrumentation Mechanic Garage D-BID-134M-001 0 60,249
add an other room similar to mechanic room FLOOR PLAN
Room in Garage

Maintenance Building: - Low partition walls between urinals to be provided. MAINTENANCE BUILDING COMMENTS FROM MEETINGS OF 9~11 DEC.
117 No Low Partition Wall for Urinals D-BID-134M-001 0 1,582 2009
Additional Low Partition Wall for Urinals (Common Comments for all toilets) FLOOR PLAN

Maintenance Building: MAINTENANCE BUILDING


118 Showers in Toilet - provide wall separation between toilet and showers. D-BID-134M-001 0 336 As per M-GT-JY/SHY-0097 dated 22 FEB 2010
Additional Interior Wall FLOOR PLAN

Maintenance Building: MAINTENANCE BUILDING Hadji-san agreed not to provide canopy for
119 No Canopy - Provide sunshade canopy D-BID-134M-001 0 4,491 Substations on 03 MAR 2010.
Additional Canopy FLOOR PLAN

Maintenance Building: MAINTENANCE BUILDING


120 No Low Partition Wall for Urinals - wall separation for urinals shall be provided D-BID-134M-001 1 1,582 C-GT-SHY/JY-1012
Additional Low Partition Wall for Urinals FLOOR PLAN

Maintenance Building MAINTENANCE BUILDING


121 Translucent Panel Provide fixed windows instead translucent panel D-BID-134M-002 0 28,246
Additional Windows ELEVATION AND SECTION

Maintenance Building - Review elevation of building / ground floor (at least three MAINTENANCE BUILDING
122 GL+150mm D-BID-134M-002 0 76,651
Raise of Floor Elevation (GL+180mm) steps) ELEVATION AND SECTION

Complete by providing ceiling to:


- mechanic room MAINTENANCE BUILDING
Maintenance Building:
123 No False Ceiling - electrical workshop D-BID-134M-003 FINISHING 0 21,037
Additional False Ceiling
- instrument workshop SCHEDULE(INTERIOR)
- test room

Maintenance Building: - Provide panic bar system for all doors to outside: SD/2, MAINTENANCEBUILDING DOOR
124 No Panic Bar D-BID-134M-005 0 2,208
Additional Panic Bar for Doors SD/3, SD/1, SD/10 AND WINDOW SCHEDULE

Maintenance Building: MAINTENANCE BUILDING


125 No Air-conditioning - AC to be provided for Spare Room D-BID-134M-051 0 15,423 Requested by Hadji-san on 04 MAR 2010
Additional Split AC for Spare Room BASIC HVAC FLOW SCHEME

Main Gate House: MAIN GATE HOUSE PLAN,


126 No Apron Provide concrete paving around the building D-BID-134G-001 0 4,195
Additional RC Apron ELEVATION AND SECTION

Main Gate House: MAIN GATE HOUSE PLAN,


127 Swing Gate Provide motorized sliding gate D-BID-134G-001 0 41,360
Change Gate Type (Motorized Slide Gate) ELEVATION AND SECTION

Main Gate House:


Card Reader was located outdoor and Scanner & Frame Remove the card reader into the gate house and provide MAIN GATE HOUSE PLAN,
128 Additional Space for Card Reader, Scanner and D-BID-134G-001 0 210,553
Detector was not considered. a scanner inside the gate house ELEVATION AND SECTION
Frame Detector

3 / 4
JOB Code : 0-5353-20 Log List for SH Comments
PJ Name : Gassi Touil Project
(Building Works)

Proposed Change Amount


Serial (USD)
Description Original Contractual Requirements SH Comments Reference Document Remarks
No.
Positive Negative

Main Gate House:


- One frame detector and one scanner to be supplied by MAIN GATE HOUSE PLAN, As per M-GT-JY/SHY-0045
129 Installation of Additional Frame Detector and Frame detector & scanner were not considered. D-BID-134G-001 0 4,826 Installation Only
SH. ELEVATION AND SECTION
Scanner

Main Gate House: MAIN GATE HOUSE PLAN,


130 No Window - add window 400x400 for toilet D-BID-134G-001 1 107
Additional Window ELEVATION AND SECTION

Main Gate House: MAIN GATE HOUSE PLAN,


131 No Paving - add paved area D-BID-134G-001 1 8,950
Additional Paving ELEVATION AND SECTION

Main Gate House: MAIN GATEHOUSE DOOR AND


132 No Panic Bar Provide SD/1, SD/2 with panic bar D-BID-134G-003 0 1,656
Additional Panic Bar for Doors WINDOW SCHEDULE

Plant Gate House: PLANT GATE HOUSE PLAN,


133 No Apron Provide concrete paving around the building D-BID-134H-001 0 4,195
Additional RC Apron ELEVATION AND SECTION

COMMENTS FROM MEETINGS OF 9~11 DEC.


Plant Gate House: PLANT GATE HOUSE PLAN,
134 Card Reader & Turnstile were located outdoor. Remove the card reader / turnstile into the gate house D-BID-134H-001 0 10,502 2009
Additional Space for Card Reader ELEVATION AND SECTION Cancelled as per M-GT-JY/SHY-0045 & 0045 Rev.1

Plant Gate House:


Provide a motorized slide gate and a door for pedestrian PLANT GATE HOUSE PLAN,
135 Change of Gate Type and Additional Door for No Door for Pedestrian D-BID-134H-001 0 41,360
crossing ELEVATION AND SECTION
Pedestrian

Plant Gate House: PLANT GATE HOUSE PLAN,


136 No Window - provide small window 400x400 for toilet D-BID-134H-001 1 107
Additional Windows ELEVATION AND SECTION

Plant Gate House: PLANT GATE HOUSE PLAN,


137 No Pave - add paved area D-BID-134H-001 1 4,069
Additional Pave ELEVATION AND SECTION

Plant Gate House: PLANT GATEHOUSE DOOR


138 No Panic Bar Provide SD/1, SD/2 with panic anti-bar system D-BID-134H-003 0 1,656
Additional Panic Bar for Door AND WINDOW SCHEDULE

Provide:
DSP Base: DSP BASE CONCEPTUAL
139 No Airlock - airlock for canteen room D-BID-1340-011 0 4,295
Additional Air Lock LAYOUT

DSP Base DSP BASE CONCEPTUAL


140 One Central Toilet - provide showers and toilets for every cabin D-BID-1340-011 0 172,839
Additional Toilet for Each Cabin LAYOUT

DSP Base: DSP BASE CONCEPTUAL


141 No Paving -provide paved area D-BID-1340-011 0 7,076
Additional Pave LAYOUT

DSP Base - Details for weapons store and dike refer to our comment DSP BASE CONCEPTUAL
142 Not specified D-BID-1340-011 1 389,305
Additional Weapon Store in C-GT-SHY/JY-0137. LAYOUT

DSP Base: CONCEPTUAL LAYOUT OF


143 Refer to contract drawing Due to SH comments on DSP Base D-CPF-1317-904 13,781
Additional Tuff Paving (800m2+512m2) PAVING

Chemical Storage: CHEMICAL STORAGE PLAN,


144 GL+50mm - Review the elevation at least (300 mm) D-BID-134N-101 0 10,923
Raise of Floor Elevation (GL+200mm) ELEVATION AND SECTION

Power Supply Scheme: POWER SUPPLY SCHEME FOR


145 Not specified F.A.P must be U.P.S powered. S-CPF-1340-081 0 62,436
FAP to be Powered by UPS BUILDINGS

Power Supply Scheme: 2.5 METERING HOUSE: add HVAC equipment to POWER SUPPLY SCHEME FOR
146 Normal Power S-CPF-1340-081 0 10,406
Additional Essential Power for Metering HVAC essential low voltage BUILDINGS

Power Supply Scheme:


2.9 MAINTENANCE BLDG: add HVAC equipment 50% to POWER SUPPLY SCHEME FOR
147 Additional Essential Power for Maintenance Normal Power S-CPF-1340-081 0 20,812
essential low voltage BUILDINGS
BLDG HVAC
Power Supply Scheme:
2.3 FLAMMABLE LIQUID STORAGE: add emergency POWER SUPPLY SCHEME FOR
148 Additional Emergency Lighting for Flammable Normal Lighting S-CPF-1340-081 0 2,081
lighting to essential low voltage BUILDINGS
Liquid Storage
Power Supply Scheme:
2.14 CHEMICAL STORAGE: add emergency lighting to POWER SUPPLY SCHEME FOR
149 Additional Emergency Lighting for Chemical Normal Lighting S-CPF-1340-081 0 2,081
essential low voltage BUILDINGS
Storage

Power Supply Scheme: POWER SUPPLY SCHEME FOR


150 Normal Lighting 2.16 DSP BASE: add lighting to essential low voltage S-CPF-1340-081 0 2,081
Additional Essential Power for DSP Lighting BUILDINGS

General Specification: - ablution room in Main Control GENERAL SPECIFICATION FOR


151 No Ablution & Prayer Room S-CPF-1340-002 0 12,242 as per clarification on 08 JAN 2010
Additional Ablution in Main Control Building - Hand washbasin in toilets BUILDING

General Specification: Complete by hot water provided for


GENERAL SPECIFICATION FOR
152 Additional Hot Water Supply for Toilet and Cold Water Only - Hand washbasin in toilets S-CPF-1340-002 0 36,727 as per clarification on 08 JAN 2010
BUILDING
Ablution - ablution room

General Specification: - Dedicated CO2 System with 100% spare for HV area GENERAL SPECIFICATION FOR
153 One System for HV & LV Area S-CPF-1340-002 0 189,022 As per M-GT-JY/SHY-0026 Rev.1
Dedicated CO2 System for Main Substation and LV area to be provided. BUILDING

General Specification: - Dedicated fire alarm panel for HV area and LV area to GENERAL SPECIFICATION FOR
154 One System for HV & LV Area S-CPF-1340-002 0 10,406 As per M-GT-JY/SHY-0026 Rev.1
Dedicated Fir Alarm Panel for Main Substation be provided. BUILDING

General Specification: GENERAL SPECIFICATION FOR


155 FM200 - "FM200" to be "FM200 or equivalent" S-CPF-1340-002 0 564,816 As per M-GT-JY/SHY-0045
Change from FM200 to NOVEC 1230 BUILDING

General Specification: - 4.3.5.californians stores (curtains) shall be provided for GENERAL SPECIFICATION FOR
156 No Blind S-CPF-1340-002 1 44,071
Additional Horizontal Blind external windows of offices BUILDING

General Specification: GENERAL SPECIFICATION FOR


157 minimum 150mm - 5.5.and 200mm for heavy loads S-CPF-1340-002 1 52,978
Change minimum Thickness of Heavy Duty Slab BUILDING

General Specification: GENERAL SPECIFICATION FOR


158 Cold Water Only - 7.5.1. Mess Room S-CPF-1340-002 1 48,969
Additional Hot Water Supply for Mess Room BUILDING

General Specification:
- Materials used for internal finishing in MCB & LAB to be GENERAL SPECIFICATION FOR
159 Additional Requirement of Noncombustible Not specified S-CPF-1340-002 1 39,937 Ishizu e-mail on 18 June 2010
noncombustible materials BUILDING
Material for MCB & LAB

Schematic Diagram for BLDG F&G System: - 4.7 Extinguish system by water to be provided for SCHEMATIC DIAGRAM FOR
160 Indoor Hose Station only S-CPF-1340-071 1 96,492 L-GT-JY/SHY-459
Additional Sprinkler for Warehouse Warehouse BUILDING F&G SYSTEM

STANDARD DRAWING FOR


Car Parks: Car Parking for Administration Building to be reduced
161 40cars D-CPF-1340-003 COVERED CAR PARKS AND 0 -167,710 as per M-GT-JY/SHY-0045
Reduce of car parking from 40 to 30 for ADM from 40 to 30
TRUCK SHED
STANDARD DRAWING FOR
Car Parks: Parking for 18 cars with sunshade and 2 buses without
162 No sunshade for car park D-CPF-1340-003 COVERED CAR PARKS AND 0 473,200 as per M-GT-JY/SHY-0045
Additional Sunshade for 18 Car parkings sunshade to be provided.
TRUCK SHED
- Carpet Flooring for ADM MGR RM, Reservoir MGR RM,
MAR:
Secretary (RM), Maint. MGR RM, Secretary (MM), HSE
163 Change of Floor Finishing from Carpet Flooring to Carpet Flooring MAR No. 040 Carpet Flooring 0 38,134 Ishizu e-mail on 01 July 2010
MGR RM & Secretary (HSSM) to be changed to ceramic-
Ceramic Tile
tile-A.

Office Furniture: C-GT-SHY/JY-1470


164 Refer to contract document - Additional Furniture to be provided S-CPF-1340-004 Office Furniture List 0 Later L-GT-JY/SHY-0458
Change of Type and Quantity

5,122,741 -168,730
Exchange Rate
1USD=72.9394 DA TOTAL 4,954,010
1EUR=103.5010 DA
100JPY=75,4754DA
1EUR=1.4190 USD
100JPY=1.0348 USD

4 / 4