12 Pieces Ellipz Lighting PL2-OW 600x600mm 4000K LED See our luminaire
Panel Light catalog for an image of
Article No.: PL2-OW 600x600mm 4000K the luminaire.
Luminous flux (Luminaire): 3402 lm
Luminous flux (Lamps): 3405 lm
Luminaire Wattage: 32.7 W
Luminaire classification according to CIE: 100
CIE flux code: 43 74 94 100 100
Fitting: 1 x Ellipz LED (Correction Factor 1.500).
Page 3
Buidling - CCB - Meeting Room
28.03.2016
Ellipz Lighting PL2-OW 600x600mm 4000K LED Panel Light / Luminaire Data Sheet
Luminous emittance 1:
Page 4
Buidling - CCB - Meeting Room
28.03.2016
Room 1 / Summary
Height of Room: 2.800 m, Mounting Height: 2.800 m, Light loss factor: Values in Lux, Scale 1:101
0.80
No. Pieces Designation (Correction Factor) (Luminaire) [lm] (Lamps) [lm] P [W]
Ellipz Lighting PL2-OW 600x600mm 4000K
1 12 3402 3405 32.7
LED Panel Light (1.500)
Total: 40819 Total: 40857 392.4
Specific connected load: 5.59 W/m = 0.90 W/m/100 lx (Ground area: 70.20 m)
Page 5
Buidling - CCB - Meeting Room
28.03.2016
12 Pieces Ellipz Lighting PL2-OW 600x600mm 4000K LED See our luminaire
Panel Light catalog for an image of
Article No.: PL2-OW 600x600mm 4000K the luminaire.
Luminous flux (Luminaire): 3402 lm
Luminous flux (Lamps): 3405 lm
Luminaire Wattage: 32.7 W
Luminaire classification according to CIE: 100
CIE flux code: 43 74 94 100 100
Fitting: 1 x Ellipz LED (Correction Factor 1.500).
Page 6
Buidling - CCB - Meeting Room
28.03.2016
Scale 1 : 65
Page 7
Buidling - CCB - Meeting Room
28.03.2016
Surface Average illuminances [lx] Reflection factor [%] Average luminance [cd/m]
direct indirect total
Workplane 489 135 625 / /
Floor 390 142 533 20 34
Ceiling 0.00 140 140 80 36
Wall 1 208 132 340 50 54
Wall 2 251 132 383 50 61
Wall 3 208 133 342 50 54
Wall 4 251 129 380 50 60
Specific connected load: 5.59 W/m = 0.90 W/m/100 lx (Ground area: 70.20 m)