Vous êtes sur la page 1sur 4

MR.ALVIN T.

ABRENCILLO

GUMACA,QUEZON PROVINCE PHILIPPINES

Contact# +639776258712/+639083252156

Email adress: alvinabrencillo@yahoo.com

OBJECTIVES

Working abroad,by learn more ideas in work every person or citizen,you are
going to work with or by helping them, of what I have learn, as a group, be
attention,working hard,to reach the goal or mission of company together and
it reflect my family, a good worker,it give my family a perfect life in the future.
Safety first,before start working, complete PPE (personal protective
equipment).

POSITION APPLIED:

DUCTMAN/ DUCT INSTALLER


PERSONAL DATA:

AGE:38yrs old

Date of birth: September 1, 1979

Civil status: Married

Religion: Roman Catholic

EDUCATIONAL BACKGROUND:

Elementary Graduate with diploma, since 1986-1992 HES, Gumaca Quezon


Phil.

High School Graduate with diploma, since 1994-1997CNSH, Gumaca Quezon


Phil.

OBJECTIVE:

To acquire a job that would enhance my skills and knowledge.


To give some support toward the achievements of the organizational
goals and objectives

SKILLS:

Knowledge in Mechanical works.


Can work in minimal supervision.
Having good leadership

CONTACT PERSON: Elena A. Abrencillo #09776258712


WORKING EXPERIENCE:

AMASI (Alphaland and Marriott Project).Position :Ductmanleadman since april 3, 2010 to


sept.09,2015.Location:Pasay City, Manila Philippines.(6yrs)

DUTIES AND RESPONSIBILITIES:

Engaged monitoring the correct drawing orientation based on actual.


Lay out of all type of duct support as referred to drawing specification
Installation of duct (RAD) fresh air duct (FAD)Exhaust air duct (EAD) and all duct riser with
proper safety equipment /PPE, helmet, eye glass/goggles, dust mask, hand gloves, and
safety shoes.
Responsible in cutting and layout of fitting using parallel method and triangulation.
We also use scaffolding with right guard railing system the compose of top rail, mid rail and
toe board.
When working in height of 1.8 meter and above we put full body harness (PFAS)with
double anchorage and hook it on an independent life line to reduce the risk of fail .

TOOLS THAT I ALREADY USED:


Meter Metal Saw Bisecrip
Hammer Flies Hand drill
Flatscrewdriver All open wrench Mason drill helti
Philipscrewdriver Automatic open wrench Grider
Speed cutter Welding machine

MANSWORK (SM Pampanga Project) .Position: Duct installer since January ,2006 to march,2008.
Location:QuezonCity,Manila Philippines.(2yrs)

DUTIES AND RESPONSIBILITIES:

Engaged monitoring the correct drawing orientation based on actual.


Lay out of all type of duct support as referred to drawing specification.
Installation of duct (RAD) fresh air duct (FAD)Exhaust air duct (EAD) and all duct riser with
proper safety equipment /PPE, helmet, eye glass/goggles, dust mask, hand gloves, and
safety shoes.
Responsible in cutting and layout of fitting using parallel method and triangulation.
We also use scaffolding with right guard railing system the compose of top rail, mid rail and
toe board.
When working in height of 1.8 meter and above we put full body harness (PFAS)with
double anchorage and hook it on an independent life line to reduce the risk of failing.
TOOLS THAT I ALREADY USED:
Meter Metal Saw Bisecrip Speed cutter
Hammer Flies Hand drill Welding machine
Flatscrewdriver All open wrench Mason drill helti
Philipscrewdriver Automatic open wrench Grider
AIMELAIR (Highland Project).Position: Duct installer since January 10 ,2003 to December 23,2005.
Location: Quezon City, Manila Philippines. (2yrs) DUTIES AND RESPONSIBILITIES:

Engaged monitoring the correct drawing orientation based on actual.


Lay out of all type of duct support as referred to drawing specification.
Installation of duct (RAD) fresh air duct (FAD)Exhaust air duct (EAD) and all duct riser with
proper safety equipment /PPE, helmet, eye glass/goggles, dust mask, hand gloves, and
safety shoes.
Responsible in cutting and layout of fitting using parallel method and triangulation.
We also use scaffolding with right guard railing system the compose of top rail, mid rail and
toe board.
When working in height of 1.8 meter and above we put full body harness (PFAS)with
double anchorage and hook it on an independent life line to reduce the risk of failing.
TOOLS THAT I ALREADY USED:
Meter Metal Saw Bisecrip
Hammer Flies Hand drill
Flatscrewdriver All open wrench Mason drill helti
Philipscrewdriver Automatic open wrench Grider Speed cutter
Welding machine

DIAMOND NETWORK CONTRACTING COMPANY L.L.C. Position: Duct installer since September
09,2015 to September 10,2017 .Location: Riyadh, Saudi Arabia. (2yrs)

DUTIES AND RESPONSIBILITIES:

Engaged monitoring the correct drawing orientation based on actual.


Lay out of all type of duct support as referred to drawing specification.
Installation of duct (RAD) fresh air duct (FAD)Exhaust air duct (EAD) and all duct riser with
proper safety equipment /PPE, helmet, eye glass/goggles, dust mask, hand gloves, and
safety shoes.
Responsible in cutting and layout of fitting using parallel method and triangulation.
We also use scaffolding with right guard railing system the compose of top rail, mid rail and
toe board.
When working in height of 1.8 meter and above we put full body harness (PFAS)with
double anchorage and hook it on an independent life line to reduce the risk of failing.
TOOLS THAT I ALREADY USED:
Meter Metal Saw Bisecrip
Hammer Flies Hand drill
Flatscrewdriver All open wrench Mason drill helti
Philipscrewdriver Automatic open wrench Grider Speed cutter
Welding machine

I hereby certify that the above information are true and correct to best of my knowledge and belief.
.

SIGNATURE

Vous aimerez peut-être aussi