Vous êtes sur la page 1sur 2

ADEL AHMED OTHMAN

11 AL GABER STREET, HARAM


GIZA, EGYPT
ADEL.AHMED.OSMAN@GMAIL.COM
HOME/+023-7798-500 MOBILE/+020100-5891-424

OBJECTIVE
Over five year experience in design process including:
Project management, performing all the scheduling and cost control activities that are required for ECG
projects in home office.
Structural analysis, design and construction of concrete structures, using international codes (ECP,ACI and BS) ;
preparing and modifying structural drawings; reviewing shop drawings; modelling using BIM programs (Revit
structural) ; quantity surveying; application of computer software programs as SAP 2000, ETABS, SAFE , and
design of pre stressed members using RAM concept, as well as spreadsheets for various projects.
EDUCATION
Attended PMP preparation course ,American University in Cairo 2014

Pre masters studies , Civil Engineering, Cairo University, Egypt, 2012


Preparing thesis in Model Pushover Analysis For Un-Symmetric Building Analysis
Under supervision of Professor Nayer el Esnawy

Civil Engineering, Bachelor Degree 2011


Cairo University, Faculty of Engineering, Cairo, Egypt
Grade: Very Good With Honor (81.15%)
Graduation Project : Design of Reinforced Concrete Structures

High School Completion Certificate , 2006 Manor House Schools (Dokki), Cairo, Egypt
Math Major
Graduation grade: 96.5%.

SOFTWARE SKILLS

MS Office ( Word Excel Power Point )


AutoCAD, Autodesk Design Review
Structure analysis Programs (ETABS,RAM CONCEPT, SAP 2000, SAFE)
BIM Programs (Revit Structure)
Design Programs such as (CSI COLUMN, PCA COLUMN, ISA, PROKON)

Language Skills
-Arabic : Mother Tongue
-English: Fluent
-French: Fair

Personal Information
Date of Birth: February 8, 1989
Nationality: Egyptian
Place of Birth: Cairo, Egypt
Marital Status: Single
Military Status: Exempted
WORKING EXPERIENCE

MARCH 2012 Till Now, ECG Engineering Consultants Group S.A., Cairo, ;

Project Engineer, Responsibilities include satisfy the engineering work program within the indicated time Schedule and budget,
Prepares the design and tentative time schedules during the proposal phase, Contacts with all levels of Company management.
Contacts with clients, national and foreign government officials, representatives of joint venture organizations, vendors, and
financial/professional groups as appropriate and required by the project contract, Assists in the preparation of the Bases of Design
Report (BODR) of the project including; data collection, identification of problem areas, conceptual and preliminary engineering,
outline specifications and projects preliminary cost estimates, Plans and directs utility and offside studies and engineering design,
Reviews all bid analyses and present them to the Project Manager for approval, Establish and maintains coordination between
engineering staff and client technical representatives. Controls client requests to assure adherence to the project scope, for
various projects including:

December 2015 Till Now, Marriott Courtyard, DUBAI, the project is 4 star hotel which is located at Al-Khayl Street
December 2016 August 2017: Data Center, Project is a Data center building consist of two basement floors , ground and
roof floor in total area per each floor around 3850 square meter for MOD.
February 2016 July 2016: Preparing the Conceptual master plan and detailed master plan for three zones in the
presidential project Reclamation and Development of 1500000 Acre for Egypts Countryside Development Company..
May 2015 January 2017, Barsha Hotel, Dubai.
April 2015 - October 2016, Oman Public Prosecution Office Building

Senior Structural Design Engineer, Responsibilities include complete analysis and design of structural elements using computer
programs (SAP 2000, ETABS , SAFE, Prokon and PCA Column, Ram concept) as well as spreadsheets; design for pre stressed
elements using ram concept ; preparing and modifying structural drawings; quantity surveying and shop drawing review for
various projects including:

June 2017 till now : Qatar Emiri Naval Forces Base (QENFB) Project, Qatar
December 2016 February 2017: Girls Campus of the Islamic university in Niger
October 2016 December 2016 Tanzania border post
July 2016- September 2016, Umm al-Qura University, Umm Al-Qura University is a large public university in Mecca, Saudi
Arabia.
March 2015 April 2015, School Campus in El Safaa District. Jeddah.
January 2015 March 2015, BARSHA HOTEL, DUBAI.
October 2014 January 2015, Stage II phase II of el Gabal El Asfar waste water treatment plant.
April 2014 - October 2014, Oman Public Prosecution Office Building.
February 2014 - April 2014, Tunduma One-Stop Border Post, Tanzania
January 2014- February 2014, Twyla kindergarten at Qatar.
October 2013 - December 2013 , Efinance office building at smart village
October 2012 - October 2013 ,Grand Egyptian Museum (GEM) - Phase III
August 2012 - September 2012, Saint Fatima Canadian School (Metropolitan Intl.)
June 2012 - August 2011 Multi-Storey Car Park - Housing & Development Bank.
March 2012-September 2012, Palm Hills Golf Extension Project.
March 2012-September 2012, Palm Hills Golf Views (Villas and Townhouses).

Certifications
REVIT 2015 ARCHITECTURE PROFESSIONAL

Vous aimerez peut-être aussi