METHADOLOGY

FLOW CHART

CREATING A
GROUP

THE DISTANCE OF
ROAD MUST BE IN
FIND A PLACE OF
MINIMUM 1 KM
PROJECT

ANALYSIS AND
DETERMINE THE
DAMAGE ALONG THE
ROAD AREA

Determine the
Distress Density and
Deduct Value

MAKE A
RECOMMENDATION
FROM THE PROBLEM

END
FORMING GROUP
Lecturer told us there is a project for Highway Engineering subject and she asked us to
form in a group. To proceed with the project we have to create group consist of 4 people.

PROBLEM AND SCOPE OF PROJECT


After the briefing for forming group, the lecturer gave us the problem and the scope of
project. She has briefly explained the problem statement for the project. The problem was
about the roads that have been built are often damaged due to vehicle load and
environment. This situation requires the maintenance work to be done so that it can
provide comfortable riding to road users. Each of the group has to conduct a survey of
pavement conditions to determine damages and recommend appropriate pavement
preservation work to local authorities. The factors of the damage to the roads also need to
be reviewed.
.
BRIEFING BEFORE SURVEYING OUR SAMPLE UNIT
Our lecturer gave us a brainstorming session on how to solve the related problem. In this
session, lecturer had given us some opinions such as the procedures and requirements for
the project also the equipment that are needed for this project.

DISCUSSION / INVESTIGATING PROBLEM


After the lecturer briefed us about the problem of the project and the group discussion on
10 December 2017, we had suggested a few sites for our project around Parit Raja area
Jalan Parit Kaspan. To determine the site for our project, we have to conduct a survey on
the site so that the site that we choose is fulfilled the requirements of this project such as
cracks lab sheet of the sample unit to be inspected and length of the road must exceed 1
KM. Each of the group member has to identify the problems and do research on the
problems in the internet, books and journal. After that, the identified problems will be
solved in FILA table by using brainstorming method. The method of FILA table is as
followings:
FACTS IDEAS LEARNING ACTION PLAN
ISSUES
- The roads that - Improper drainage -Types of distress - Identified the
have been built are system and design -Design of pavement distress
often damaged due -Aggregate for chip - Based on data
to vehicle load and seals analysis, recommend
environment a design of chip seal
to repair or prevent
the distress