Vous êtes sur la page 1sur 8

Cascade Control

BITS Pilani Pratik N Sheth


Department of Chemical Engineering
Pilani Campus
Problems 16.1 and 16.5

16.1
Based on secondary measurement time lag

16.5
Based on decision making for combination of feed forward and Cascade Control
strategy

Dr Pratik N Sheth, Dept of Chemical Engg, BITS Pilani, Pilani Campus


Time Delay Compensation

Problems associated with time Delay

Dr Pratik N Sheth, Dept of Chemical Engg, BITS Pilani, Pilani Campus


Smith Predictor Method

Block Diagram

Dr Pratik N Sheth, Dept of Chemical Engg, BITS Pilani, Pilani Campus


Smith Predictor Method

Equivalent block diagram

Dr Pratik N Sheth, Dept of Chemical Engg, BITS Pilani, Pilani Campus


Smith Predictor Method

Equivalent block diagram

For conventional Feed back control loop

Dr Pratik N Sheth, Dept of Chemical Engg, BITS Pilani, Pilani Campus


Effect of Smith- Predictor
Method

Dr Pratik N Sheth, Dept of Chemical Engg, BITS Pilani, Pilani Campus


Smith Predictor Method

Disadvantage of Smith-Predictor Method


Model Based
Performance is limited model accuracy

Dr Pratik N Sheth, Dept of Chemical Engg, BITS Pilani, Pilani Campus

Vous aimerez peut-être aussi