Ver. 2.0
World is moving out to the Universe to find out how to protect and not destroy the
Prolog
earth. As the global warming is the top issue in 21centry, Electric Power System
must be seeking an innovation to support making clean world. Solid Dielectric Product
would be one of the best solution, removing SF6 gas and supply non-gas product,
it will provide not only clean world but also safer Power Distribution System.
Solid Dielectric Pad Mount Suitchgear for Underground Power Distribution System
are used to minimize outage time and area.
Solid Dielectric Pad Mount Suitchgear use Vacuum Interrupter with independent phase
structure and magnetic actuator as an operation mechanism. Above of all, by removing
SF6 gas use, Solid Pan Mount Switchgear increases safety and guarantees maintenance
free Operation. In addition, Solid Dielectric Pad Mount Suitchgear has embedded
Partial Discharge Diagnosis, this monitoring system can check not only by using
interface software at the site but also by a remote communication at the control
center station.
Solid Dielectric Pad Mount Switchgear 2_3
Battery
24V DC, 40AH
Dead line operation available during 48hours
Earth Terminal
Rechargeable by auxiliary power source(110/220Vac)
Convenient earthing
4 ETPS1-4-2S1B1W-A-E
6 ETPS2-6-2S3B1W-A-E
Ordering menu
: 1~6
G : Gas type 1 : 15kV N : Total number S : Load Break Switch M : Manual E : Earthed
S : Solid type 2 : 27kV of way(1~6) B : Circuit Breaker E : Electrical NE : Not Earthed
W : direct way A : Auto(Built-In RTU option)
Ex) ETPG1-6-2S4B-A-WE , ETPS2-4-2S2B-A-E SW : Switch without Earth
Control Part
Contorl : ETCCU104
Protection Metering
Control
Time Current Curve editable Voltage, Current
Protection and IEEE, IEC and 37 non-standard inverse time curves Demand watts and VARs and frequency
Metering Protective settings in nonvolatile memory during power failure Load Profile data & Ocillogram
Delay time overcurrent protection(51P,51G) Power-KW/KVAR/KVA
Instantaneous overcurrent protection(50P,50G) Power factor
Negative sequence overcurrent protection(46) 3PH Power-KVA/KW/KVAR/PF
Cold load pickup and sequence coordination Energy
Underfrequency and load shedding(81) (Pos W/H, Pos V/H, NEGs W/H, NEG V/H)
Undervoltage, overvoltage detection and alarm(27,59)
!
!
!
Table of Locations
1 Main Switch 6 Controller 11 Battery Box
2 Earthing Switch 7 Control Power Switch 12 Modem Bracket
3 Circuit Breaker 8 Emergency Trip Device 13 PT
4 Epoxy Housing 9 Lifting lugs 14 CT
5 Manual Operation Handle 10 Capacitor Box 15 Earthing Terminal
!
78-6 78-6 78-6 ;41,16;=4)<-,;?1<+0/-):
78-6
78-68=44 78-6
78-6
78-68=44 78-6
78-6 +76<:744-:
<aXM -<++,
,I\M
+)=<176 47+3 -):<0;? +)=<176 47+3 -):<0;? +)=<176
-IZ\PWXMZI\QWVTWKSQVOLM^QKM
+47;- ,WVW\KTW[MWVIK\Q^MTQVM -IZ\PWXMZI\QWVTWKSQVOLM^QKM
+47;- ,WVW\KTW[MWVIK\Q^MTQVM -IZ\PWXMZI\QWVTWKSQVOLM^QKM +47;- ,WVW\KTW[MWVIK\Q^MTQVM :I\ML
>WT\IOM
:MTMI[M\PMJWT\\WMIZ\PQVO +)=<176 :MTMI[M\PMJWT\\WMIZ\PQVO +)=<176 :MTMI[M\PMJWT\\WMIZ\PQVO
+47;- ,WVW\KTW[MWVIK\Q^MTQVM +47;- ,WVW\KTW[MWVIK\Q^MTQVM ?MQOP\ 3O
+*5)6=)4<:18
47+316/,->1+-
!
jGwGi
XYW} ; * ; * ;
Table of Locations
1 Main Switch 6 Controller 11 Battery Box
2 Earthing Switch 7 Control Power Switch 12 Modem Bracket
3 Circuit Breaker 8 Emergency Trip Device 13 PT
4 Epoxy Housing 9 Lifting lugs 14 CT
5 Manual Operation Handle 10 Capacitor Box 15 Earthing Terminal
Solid Dielectric Pad Mount Switchgear 6_7
!
;41,16;=4)<-,;?1<+0/-):
78-6
5)16;?
+47;-
+7=6<-:
+7=6<-: +7=6<-: +7=6<-: +7=6<-: +7=6<-:
78-6
78-68=44 78-6
78-68=44 78-6
78-68=44 78-6
78-68=44 78-6
78-68=44 78-6
-):<0;? +76<:744-:
+)=<176 <aXM
47+3 -):<0;? 47+3 -):<0;? 47+3 -):<0;? 47+3 -):<0;? 47+3 -):<0;? -<++,
-IZ\PWXMZI\QWVTWKSQVOLM^QKM
+47;- ,WVW\KTW[MWVIK\Q^MTQVM
;MZQIT6W
+)=<176 +)=<176 +)=<176 +)=<176 +)=<176
+47;- ,WVW\KTW[MWVIK\Q^MTQVM +47;- ,WVW\KTW[MWVIK\Q^MTQVM +47;- ,WVW\KTW[MWVIK\Q^MTQVM +47;- ,WVW\KTW[MWVIK\Q^MTQVM +47;- ,WVW\KTW[MWVIK\Q^MTQVM
,I\M
!
jGwGi
XYW} ; * * * * *
Table of Locations
1 Main Switch 6 Controller 11 Battery Box
2 Earthing Switch 7 Control Power Switch 12 Modem Bracket
3 Circuit Breaker 8 Emergency Trip Device 13 PT
4 Epoxy Housing 9 Lifting lugs 14 CT
5 Manual Operation Handle 10 Capacitor Box 15 Earthing Terminal
!
Table of Locations
1 Main Switch 4 Lifting lugs 7 PT
2 Earthing Switch 5 Epoxy Housing 8 CT
3 Circuit Breaker 6 Capacitor Box 9 Earthing Terminal
* Note. Product structure and arrangement shall be modified without notice.