30th Annual General Meeting of the

Malaysian Gas Association (MGA)


12 May 2016
Dewan Sri Pinang, Level 3, Etiqa Twins,
Jalan Pinang, Kuala Lumpur

Development Masterplan of Pengerang

Mohd Yazid Jaafar


Chief Executive
Johor Petroleum Development Corporation

Johor Petroleum Development Corporation Berhad | 2016


1
JPDC is a federal Government agency entrusted to plan,
coordinate, and promote the development of downstream
O&G in Johor
MANDATES
1 4
Integrated
To plan and develop strategies for the To promote and market Johor
downstream oil and gas development in Promotion &
Planning downstream oil & gas industry to
Marketing
Johor potential investors

2 5
To identify and manage funds required Industry To ensure the availability of industry
Sufficient
Fund for financing the downstream oil and gas Ready ready workforce to drive and sustain
development in Johor Workforce PIPCs development growth

3 6
To coordinate and drive the execution of Local To enhance inclusiveness towards an
Coordination equitable society with more access to
development projects in Johor Participation
economic opportunities in PIPC

Tanjung South China Sea


Iskandar Langsat
Puteri
2
Pengerang
Singapore 1 2
Tanjung 3
Bin

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 2
Malaysias downstream oil & gas development has
limited capacity to grow in existing locations

Locations of downstream oil & gas in Malaysia

1 8
9
2
3 1
2

4 7

5
3
14
6

Legend Facilities Locations Current facilities in Malaysia


Oil Refineries
1.Kertih 2.Kemaman 3.Port
Dickson 4.Melaka
Scattered and non-integrated;
No space for expansion;
1.Gurun 2.Prai 3.Kertih
Petrochemicals 4.Gebeng 5.Nilai 6.Pasir Gudang No deepwater facility;
7.Bintulu 8.Labuan 9.Sipitang Unable to produce EURO 4/5; and
LNG RGT 1.Sungai Udang, Melaka Far from international ports.

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 3
Unleashing the potential of Pengerang, the place..

STRATEGIC LOCATION

Major international shipping


lane
Natural water depth of 24 m
Single plot of 80 km2 ~ 10% the
size of Singapore

Pengerang Low socioeconomic and


environmental impact
Near major markets
633 million ASEAN population
3 billion Asia region population

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 4
.. and transforming it into an integrated
downstream Oil & Gas hub

Pengerang Integrated Petroleum Complex (PIPC)

Dedicated Jetties Refineries and Naphtha Crackers

Medium & Light Industries

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 5
PIPC in numbers

1 million bbl/day 1,220 MW


Refining Capacity Co-generation Plant

11.8 MTA 3.5 MTA


Petrochemical Production RGT Capacity

5 million m3 520 MLD


Oil Storage Capacity Raw water supply
12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 6
Bringing huge benefits to the country and ample
opportunities for businesses..
Helping transform Malaysia into a
high income nation

Diversifying the countrys economy

Increasing Malaysias export capacity

Opening up of Oil & Gas trading


opportunities

Providing the nations growing


energy needs
12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 7
..and guided by a comprehensive PIPC Masterplan
to ensure development success
Plastics & Fine Downstream finished Medium & Light
Chemicals Park product zone Industries Hub

ERC
Future
integrated
investor 3
Future
integrated
investor 2

CUF WMC

Future
integrated
investor 1

Pengerang Integrated Pengerang Deepwater Commercial Solid


Complex (PIC) Terminal (PDT) Services Hub Logistics Hub

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 8
PIPC Masterplan was developed over the years
from conceptual to detailed masterplan
Conceptualization Realization
2011 2012 2013 2016

Conceptual Masterplan (Phase 1) Detailed Masterplan (Phase 2)

1. Market Analysis 6. Infrastructure Planning


1. Macro economic analysis 2. Investment Scenario 7. Utility Planning
2. Benchmarking analysis Planning 8. Site Preparation
3. Conceptual Layout Planning 3. PIPC Site Selection Planning
4. Implementation Planning and Layout Planning 9. Social and Economic
4. Non-refining Industry Impact Analysis
Planning 10. Project Management
5. Marine Support Organisation (PMO)
Service Planning Design

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 9
.. and proposes the development of PIPC to take
place over four (4) phases

PIPC Four (4) Development Phases

2015 2022

Phase 3.4
2023 2027
P&C Park
Phase 4
2014 2018
Investor 4
Phase 2
2018 2022

Phase 3.2

2013 2017

Phase 1
2014 2018
2018 2022 Phase 2
2021 2024
Phase 3.3
Phase 3.1

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 10
Implementation phase is crucial for PIPC success
and remains our focus for Phase 1..

PIPC Detailed Implementation


PIPC Master Plan
Master Plan Phase
(2011)
(2012-2013) (2012-2027)

PIPC Development Stages


Planning and Development Areas Stage 1 Stage 2 Stage 3
Master Plan Layout / Buffer Zoning / Investment Planning Conceptual/High-level Detailed Implementation
Utilities planning / Infrastructures planning High-level Detailed Implementation
Site preparation planning (incl. drainage) Detailed Implementation
Land surveys High-level Detailed
Marine facilities,Traffic Congestion Study / Anchorage planning High-level Detailed Implementation
Emergency Response Plan (ERP) Detailed Implementation
Environmental impact High level Preliminary EIA Detailed EIA
Economic impact High-level Detailed ECBc Application
Social Impact Detailed SIA Application
Governance High-level Detailed Implementation
Project/Programme Management PMO design Implementation

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 11
PIPC core activities
Refineries Petrochemical Plants

LNG Storage Tanks Power Plant

Regasification Plant Naphtha Crackers

Oil Storage Tanks

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 12
PIPC non-refining industry planning
Emergency Coordination Downstream Finished Product
Centre Zone (1,081 acres)
Emergency Coordination Plastics and Fine Chemicals
Hospital / Clinic Small / Medium Enterprise
PIPC Security Coordination

Medium and Light


Waste Management
Industry Hub (700 acres)
Centre (60 acres)
Support Industries
Waste Water Treatment
Testing and Metering
Solid Waste Conversion

Emergency Response
Centre (10 acres)
Fire Response Team
Ambulance Base

Solid Logistics Hub (125


acres)
Container Facilities
Sulphur and Coke

Centralised Tank Farm; CTF Commercial Services Hub


(1,400 acres) (180 acres)
Crude and Product Handling Professional Services
Sulphur and Coke Handling Banking and Finance

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 13
Two major investors are already on the ground
leading the way..
1 2
Pengerang
sdasdasd Deepwater Terminal (PDT) Pengerang Integrated Complex (PIC)
by DIALOG-Royal Vopak-SSI Johor by PETRONAS

Completed 1.3 million m3 storage in Final Investment Decision (FID)


December 2014 was approved on 3 April 2014
Started operations since April 2014 and Work is progressing to plan at 27.8%
has received more than 537 shipments vs target 29.1% as at end March 2016
as of 12 April 2016
The refinerys Ready for Start Up
Second phase under construction (RFSU) date is Q1 of 2019

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 14
With strong support from the Government of
Malaysia..

Support from the Government

1
Development of world-class
infrastructure and public amenities

2
Dedicated agency to plan,
coordinate, facilitate and oversee
the implementation of PIPC

3
Dedicated Government forums
to fast track development

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 15
.. infrastructure and public amenity projects are
progressing according to plan

New Roads New Fire Stations New Police Station


(under construction) (under construction) (under construction)

New medical clinic New schools


(completed) (completed)

26 work packages:
Overall development progress of 12.12% (vs plan 12.23%)*
Note: * RMK-10 & RMK-11 Progress as at 14 April 2016 and all projects to be completed in early 2019
12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 16
.. and with other milestones achieved according to
plan, the dream will soon become a reality..

PETRONAS
Refinery Ready
PETRONAS For Start-Up
FID 3 April TODAY Q1 2019


2014 2015 2016 2017 2018 2019

DIALOG DIALOG PETRONAS DIALOG


Phase 1 Phase 2 GAS Phase 2
operation & RGT2 RGT2 operation operation
commenced construction commences commences
12 April 2014 commenced Q4 2017 Q1 2019

Q1 2015

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 17
No longer a pipedream PIPC has secured
commitment from private investors and strong
support from the Government of Malaysia..

National Project of strategic importance

PIPC is already operating! Independent


storage started April 2014

PIC project is progressing at 27.8% and is


on track to achieve PIC start-up Q1 2019

Public and private players are committed to


realise the dream of an oil and gas hub in
Pengerang

12 May 2016 To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 18
Main Office
Suite 17.03A, Level 17,
Menara MSC Cyberport,
No. 5, Jalan Bukit Meldrum,
80300 Johor Bahru,
Johor, Malaysia.
Tel : +607 267 2900
Fax : +607 267 2999

enquiries@jpdc.gov.my
www.jpdc.gov.my
facebook.com/johorpetroleumdevelopmentcorporationberhad

Thank you

Johor Petroleum Development Corporation Berhad | 2016