Vous êtes sur la page 1sur 1

ETAP

Project: IEEE 30 BUS SYSTEM 12.5.0D Date: 06-08-2017


Location: K.K.W.I.E.E.& R SN: DLR-EA-48
Contract: 7755988293 Revision: Base
Engineer: Priyanka Jawale Study Case: RA3 Config.: 5GENON

Project File: C:\Users\vasudevank\Desktop\PROJECT\PROJECT\IEEE 30 BUS


Output Report: 5genon

RELIABILITY ANALYSIS
Sensitivity Analysis For Expected Interrupting Cost (ECOST)

System (Total ECOST 0.000 $/year)

11

10

6
ECOST ($/year)

0
0 0.5 1.0 1.5 2.0 2.5
Elements