Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA

Title : 132/11kV S/S AT KHALIFA IIA


Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS23-29,36-38,48-49,51-55

NOTE:- ( GS24 & 49 consid. For max span, on worst case )

CHECK FOR TWO WAY SLAB :-


Main Reinforcement in the SHORT Span
Slab Data :-

Type of Panel (From Table 3.14, BS 8110) = One short edge discontinuous
Dead Load, Gk = 7.50 kN/m Long span, ly = 8000 mm
Live Load, Qk = 2.50 kN/m Short span, lx = 8000 mm
Total Design Ultimate Load, h = 1.4Gk + 1.6Qk ly / lx = 1.00
= 1.4x7.5 + 1.6x2.5 Breadth of Slab, b = 1000 mm
= 14.50 kN/m Depth of Slab, D = 250 mm
Characteristic Strength of Concrete, fcu = 35 N/mm Dia of Main bar, T1 = 12 mm
Yield Strength of Steel, fy = 460 N/mm Dia of Main bar, B1 = 12 mm
Concrete cover (Top), Ct = 25 mm Dia of distribution, T2 = 12 mm
Concrete cover (Bot), Cb = 25 mm Dia of distribution, B2 = 12 mm

Short Span

Coefficient, b sx (-ve) = 0.039


(+ve) = 0.029

Continuous edge `
Effective Depth, d = D - Ct - (T1/2)
= 250-25-(12/2)
= 219.0 mm
Max -ve moment at continuous edge, M = b sx h lx
= 0.03914.58
= 36.19 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z

= 36.1910^6/(0.954600.95219)
= 398.05 mm
Spacing reqd., s = 284 mm Provide nominal 200mm spacing
Spacing prod. = 200 mm T1extra = 0
Provide T12 @ 200mm c/c (T1)
Area of Steel prod., Ast = 565.20 mm Hence Ok

Mid span
Effective Depth, d = D - Cb - (B1/2)
= 250-25-(12/2)
= 219.0 mm
Max +ve moment at mid span, M = b sx h lx
= 0.02914.58
= 26.91 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 26.9110^6/(0.954600.95219)
= 295.98 mm
Spacing reqd., s = 382 mm Provide nominal 200mm spacing B1extra = 0
Spacing prod. = 100 mm
Provide T12 @ 100mm c/c (B1)
Area of Steel prod., Ast = 1130.40 mm Hence Ok
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS23-29,36-38,48-49,51-55
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS23-29,36-38,48-49,51-55

Check for Deflection

M/bd = 26.9110^6/(1000219)
= 0.56
Service Stress, fs = 2/3 fy As req/As prov (From Equation 8, BS 8110: Part 1)
= 80.34 N/mm
Modification factor, MF = 2.81 (From Equation 7, BS 8110: Part 1)
= 2.00 , as the value is greater than 2

Support condition = One side continuous


Span / Eff. Depth ratio = 23 (From Table 3.9, BS 8110: Part 1)

Depth required for deflection = 8000/(232)


173.91 mm Hence OK

Long Span

Coefficient, b sy (-ve) = 0.037


(+ve) = 0.028

Continuous edge
Effective Depth, d = D - Ct - T1 - (T2/2)
= 250-25-12-(12/2)
= 207.0 mm
Max -ve moment at continuous edge, M = b sy h lx
= 0.03714.58
= 34.34 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 34.3410^6/(0.954600.95207)
= 399.60 mm
Spacing reqd., s = 283 mm Provide nominal 200mm spacing
Spacing prod. = 200 mm T2extra = 0
Provide T12 @ 200mm c/c (T2)
Area of Steel prod., Ast = 565.20 mm Hence Ok

Mid span
Effective Depth, d = D - Cb - B1 - (B2/2)
= 250-25-12-(12/2)
= 207.0 mm
Max +ve moment at mid span, M = b sy h lx
= 0.02814.58
= 25.98 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 25.9810^6/(0.95460.0.95207)
= 302.32 mm
Spacing reqd., s = 374 mm Provide nominal 200mm spacing
Spacing prod. = 100 mm B2extra = 0
Provide T12 @ 100mm c/c (B2)
Area of Steel prod., Ast = 1130.40 mm Hence Ok

Note:-
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS23-29,36-38,48-49,51-55
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS31,32,34,35

NOTE:- ( GS32 consid. For max span, on worst case )

CHECK FOR TWO WAY SLAB :-


Main Reinforcement in the LONG Span
Slab Data :-

Type of Panel (From Table 3.14, BS 8110) = One short edge discontinuous
Dead Load, Gk = 7.50 kN/m Long span, ly = 8000 mm
Live Load, Qk = 2.50 kN/m Short span, lx = 8000 mm
Total Design Ultimate Load, h = 1.4Gk + 1.6Qk ly / lx = 1.00
= 1.4x7.5 + 1.6x2.5 Breadth of Slab, b = 1000 mm
= 14.50 kN/m Depth of Slab, D = 250 mm
Characteristic Strength of Concrete, fcu = 35 N/mm Dia of Main bar, T1 = 12 mm
Yield Strength of Steel, fy = 460 N/mm Dia of Main bar, B1 = 12 mm
Concrete cover (Top), Ct = 25 mm Dia of distribution, T2 = 12 mm
Concrete cover (Bot), Cb = 25 mm Dia of distribution, B2 = 12 mm

Long Span

Coefficient, b sx (-ve) = 0.037


(+ve) = 0.028

Continuous edge `
Effective Depth, d = D - Ct - (T1/2)
= 250-25-(12/2)
= 219.0 mm
Max -ve moment at continuous edge, M = b sx h lx
= 0.03714.58
= 34.34 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z

= 34.3410^6/(0.954600.95219)
= 377.70 mm
Spacing reqd., s = 299 mm Provide nominal 200mm spacing
Spacing prod. = 200 mm T1extra = 0
Provide T12 @ 200mm c/c (T1)
Area of Steel prod., Ast = 565.20 mm Hence Ok

Mid span
Effective Depth, d = D - Cb - (B1/2)
= 250-25-(12/2)
= 219.0 mm
Max +ve moment at mid span, M = b sx h lx
= 0.02814.58
= 25.98 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 25.9810^6/(0.954600.95219)
= 285.75 mm
Spacing reqd., s = 396 mm Provide nominal 200mm spacing B1extra = 0
Spacing prod. = 100 mm
Provide T12 @ 100mm c/c (B1)
Area of Steel prod., Ast = 1130.40 mm Hence Ok
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS31,32,34,35
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS31,32,34,35

Check for Deflection

M/bd = 26.9110^6/(1000207)
= 0.63
Service Stress, fs = 2/3 fy As req/As prov (From Equation 8, BS 8110: Part 1)
= 84.99 N/mm
Modification factor, MF = 2.69 (From Equation 7, BS 8110: Part 1)
= 2.00 , as the value is greater than 2

Support condition = One side continuous


Span / Eff. Depth ratio = 23 (From Table 3.9, BS 8110: Part 1)

Depth required for deflection = 8000/(232)


173.91 mm Hence OK

Short Span

Coefficient, b sy (-ve) = 0.039


(+ve) = 0.029

Continuous edge
Effective Depth, d = D - Ct - T1 - (T2/2)
= 250-25-12-(12/2)
= 207.0 mm
Max -ve moment at continuous edge, M = b sy h lx
= 0.03914.58
= 36.19 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 36.1910^6/(0.954600.95207)
= 421.13 mm
Spacing reqd., s = 268 mm Provide nominal 200mm spacing
Spacing prod. = 200 mm T2extra = 0
Provide T12 @ 200mm c/c (T2)
Area of Steel prod., Ast = 565.20 mm Hence Ok

Mid span
Effective Depth, d = D - Cb - B1 - (B2/2)
= 250-25-12-(12/2)
= 207.0 mm
Max +ve moment at mid span, M = b sy h lx
= 0.02914.58
= 26.91 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 26.9110^6/(0.95460.0.95207)
= 313.14 mm
Spacing reqd., s = 361 mm Provide nominal 200mm spacing
Spacing prod. = 100 mm B2extra = 0
Provide T12 @ 100mm c/c (B2)
Area of Steel prod., Ast = 1130.40 mm Hence Ok

Note:-
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS31,32,34,35
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 30,56

CHECK FOR TWO WAY SLAB :-


Main Reinforcement in the LONG Span
Slab Data :-

Type of Panel (From Table 3.14, BS 8110) = One short edge discontinuous
Dead Load, Gk = 7.50 kN/m Long span, ly = 8000 mm
Live Load, Qk = 2.50 kN/m Short span, lx = 8000 mm
Total Design Ultimate Load, h = 1.4Gk + 1.6Qk ly / lx = 1.00
= 1.4x7.5 + 1.6x2.5 Breadth of Slab, b = 1000 mm
= 14.50 kN/m Depth of Slab, D = 250 mm
Characteristic Strength of Concrete, fcu = 35 N/mm Dia of Main bar, T1 = 12 mm
Yield Strength of Steel, fy = 460 N/mm Dia of Main bar, B1 = 12 mm
Concrete cover (Top), Ct = 25 mm Dia of distribution, T2 = 12 mm
Concrete cover (Bot), Cb = 25 mm Dia of distribution, B2 = 12 mm

Long Span

Coefficient, b sx (-ve) = 0.037


(+ve) = 0.028

Continuous edge `
Effective Depth, d = D - Ct - (T1/2)
= 250-25-(12/2)
= 219.0 mm
Max -ve moment at continuous edge, M = b sx h lx
= 0.03714.58
= 34.34 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z

= 34.3410^6/(0.954600.95219)
= 377.70 mm
Spacing reqd., s = 299 mm Provide nominal 200mm spacing
Spacing prod. = 200 mm T1extra = 0
Provide T12 @ 200mm c/c (T1)
Area of Steel prod., Ast = 565.20 mm Hence Ok

Mid span
Effective Depth, d = D - Cb - (B1/2)
= 250-25-(12/2)
= 219.0 mm
Max +ve moment at mid span, M = b sx h lx
= 0.02814.58
= 25.98 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 25.9810^6/(0.954600.95219)
= 285.75 mm
Spacing reqd., s = 396 mm Provide nominal 200mm spacing B1extra = 0
Spacing prod. = 100 mm
Provide T12 @ 100mm c/c (B1)
Area of Steel prod., Ast = 1130.40 mm Hence Ok
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 30,56
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 30,56

Check for Deflection

M/bd = 26.9110^6/(1000207)
= 0.63
Service Stress, fs = 2/3 fy As req/As prov (From Equation 8, BS 8110: Part 1)
= 84.99 N/mm
Modification factor, MF = 2.69 (From Equation 7, BS 8110: Part 1)
= 2.00 , as the value is greater than 2

Support condition = One side continuous


Span / Eff. Depth ratio = 23 (From Table 3.9, BS 8110: Part 1)

Depth required for deflection = 8000/(232)


173.91 mm Hence OK

Short Span

Coefficient, b sy (-ve) = 0.039


(+ve) = 0.029

Continuous edge
Effective Depth, d = D - Ct - T1 - (T2/2)
= 250-25-12-(12/2)
= 207.0 mm
Max -ve moment at continuous edge, M = b sy h lx
= 0.03914.58
= 36.19 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 36.1910^6/(0.954600.95207)
= 421.13 mm
Spacing reqd., s = 268 mm Provide nominal 200mm spacing
Spacing prod. = 200 mm T2extra = 0
Provide T12 @ 200mm c/c (T2)
Area of Steel prod., Ast = 565.20 mm Hence Ok

Mid span
Effective Depth, d = D - Cb - B1 - (B2/2)
= 250-25-12-(12/2)
= 207.0 mm
Max +ve moment at mid span, M = b sy h lx
= 0.02914.58
= 26.91 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 26.9110^6/(0.95460.0.95207)
= 313.14 mm
Spacing reqd., s = 361 mm Provide nominal 200mm spacing
Spacing prod. = 100 mm B2extra = 0
Provide T12 @ 100mm c/c (B2)
Area of Steel prod., Ast = 1130.40 mm Hence Ok

Note:-
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 30,56
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 65,66

CHECK FOR TWO WAY SLAB :-


Main Reinforcement in the SHORT Span
Slab Data :-

Type of Panel (From Table 3.14, BS 8110) = One short edge discontinuous
Dead Load, Gk = 7.50 kN/m Long span, ly = 8000 mm
Live Load, Qk = 2.50 kN/m Short span, lx = 8000 mm
Total Design Ultimate Load, h = 1.4Gk + 1.6Qk ly / lx = 1.00
= 1.4x7.5 + 1.6x2.5 Breadth of Slab, b = 1000 mm
= 14.50 kN/m Depth of Slab, D = 250 mm
Characteristic Strength of Concrete, fcu = 35 N/mm Dia of Main bar, T1 = 12 mm
Yield Strength of Steel, fy = 460 N/mm Dia of Main bar, B1 = 12 mm
Concrete cover (Top), Ct = 25 mm Dia of distribution, T2 = 12 mm
Concrete cover (Bot), Cb = 25 mm Dia of distribution, B2 = 12 mm

Short Span

Coefficient, b sx (-ve) = 0.039


(+ve) = 0.029

Continuous edge `
Effective Depth, d = D - Ct - (T1/2)
= 250-25-(12/2)
= 219.0 mm
Max -ve moment at continuous edge, M = b sx h lx
= 0.03914.58
= 36.19 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z

= 36.1910^6/(0.954600.95219)
= 398.05 mm
Spacing reqd., s = 284 mm Provide nominal 200mm spacing
Spacing prod. = 200 mm T1extra = 0
Provide T12 @ 200mm c/c (T1)
Area of Steel prod., Ast = 565.20 mm Hence Ok

Mid span
Effective Depth, d = D - Cb - (B1/2)
= 250-25-(12/2)
= 219.0 mm
Max +ve moment at mid span, M = b sx h lx
= 0.02914.58
= 26.91 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 26.9110^6/(0.954600.95219)
= 295.98 mm
Spacing reqd., s = 382 mm Provide nominal 200mm spacing B1extra = 0
Spacing prod. = 100 mm
Provide T12 @ 100mm c/c (B1)
Area of Steel prod., Ast = 1130.40 mm Hence Ok
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 65,66
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 65,66

Check for Deflection

M/bd = 26.9110^6/(1000219)
= 0.56
Service Stress, fs = 2/3 fy As req/As prov (From Equation 8, BS 8110: Part 1)
= 80.34 N/mm
Modification factor, MF = 2.81 (From Equation 7, BS 8110: Part 1)
= 2.00 , as the value is greater than 2

Support condition = One side continuous


Span / Eff. Depth ratio = 23 (From Table 3.9, BS 8110: Part 1)

Depth required for deflection = 8000/(232)


173.91 mm Hence OK

Long Span

Coefficient, b sy (-ve) = 0.037


(+ve) = 0.028

Continuous edge
Effective Depth, d = D - Ct - T1 - (T2/2)
= 250-25-12-(12/2)
= 207.0 mm
Max -ve moment at continuous edge, M = b sy h lx
= 0.03714.58
= 34.34 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 34.3410^6/(0.954600.95207)
= 399.60 mm
Spacing reqd., s = 283 mm Provide nominal 200mm spacing
Spacing prod. = 200 mm T2extra = 0
Provide T12 @ 200mm c/c (T2)
Area of Steel prod., Ast = 565.20 mm Hence Ok

Mid span
Effective Depth, d = D - Cb - B1 - (B2/2)
= 250-25-12-(12/2)
= 207.0 mm
Max +ve moment at mid span, M = b sy h lx
= 0.02814.58
= 25.98 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 25.9810^6/(0.95460.0.95207)
= 302.32 mm
Spacing reqd., s = 374 mm Provide nominal 200mm spacing
Spacing prod. = 100 mm B2extra = 0
Provide T12 @ 100mm c/c (B2)
Area of Steel prod., Ast = 1130.40 mm Hence Ok

Note:-
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 65,66
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 69-72

CHECK FOR TWO WAY SLAB :-


Main Reinforcement in the SHORT Span
Slab Data :-

Type of Panel (From Table 3.14, BS 8110) = Four edges discontinuous


Dead Load, Gk = 7.50 kN/m Long span, ly = 8000 mm
Live Load, Qk = 2.50 kN/m Short span, lx = 8000 mm
Total Design Ultimate Load, h = 1.4Gk + 1.6Qk ly / lx = 1.00
= 1.4x7.5 + 1.6x2.5 Breadth of Slab, b = 1000 mm
= 14.50 kN/m Depth of Slab, D = 250 mm
Characteristic Strength of Concrete, fcu = 35 N/mm Dia of Main bar, T1 = 10 mm
Yield Strength of Steel, fy = 460 N/mm Dia of Main bar, B1 = 10 mm
Concrete cover (Top), Ct = 25 mm Dia of distribution, T2 = 10 mm
Concrete cover (Bot), Cb = 25 mm Dia of distribution, B2 = 10 mm

Short Span

Coefficient, b sx (-ve) = 0.000


(+ve) = 0.055

Continuous edge `
Effective Depth, d = D - Ct - (T1/2)
= 250-25-(10/2)
= 220.0 mm
Max -ve moment at continuous edge, M = b sx h lx
= 014.58
= 0 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z

= 010^6/(0.954600.95220)
= 0.00 mm
Spacing reqd., s = mm Provide nominal 200mm spacing
Spacing prod. = 200 mm T1extra = 0
Provide T10 @ 200mm c/c (T1)
Area of Steel prod., Ast = 392.50 mm Hence Ok

Mid span
Effective Depth, d = D - Cb - (B1/2)
= 250-25-(10/2)
= 220.0 mm
Max +ve moment at mid span, M = b sx h lx
= 0.05514.58
= 51.04 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 51.0410^6/(0.954600.95220)
= 558.83 mm
Spacing reqd., s = 140 mm B1extra = 0
Spacing prod. = 100 mm
Provide T10 @ 100mm c/c (B1)
Area of Steel prod., Ast = 785.00 mm Hence Ok
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 69-72
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 69-72

Check for Deflection

M/bd = 51.0410^6/(1000220)
= 1.05
Service Stress, fs = 2/3 fy As req/As prov (From Equation 8, BS 8110: Part 1)
= 218.42 N/mm
Modification factor, MF = 1.66 (From Equation 7, BS 8110: Part 1)
= 1.66

Support condition = One side continuous


Span / Eff. Depth ratio = 23 (From Table 3.9, BS 8110: Part 1)

Depth required for deflection = 8000/(231.66)


209.53 mm Hence OK

Long Span

Coefficient, b sy (-ve) = 0.000


(+ve) = 0.056

Continuous edge
Effective Depth, d = D - Ct - T1 - (T2/2)
= 250-25-10-(10/2)
= 210.0 mm
Max -ve moment at continuous edge, M = b sy h lx
= 014.58
= 0 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 010^6/(0.954600.95210)
= 0.00 mm
Spacing reqd., s = mm Provide nominal 200mm spacing
Spacing prod. = 200 mm T2extra = 0
Provide T10 @ 200mm c/c (T2)
Area of Steel prod., Ast = 392.50 mm Hence Ok

Mid span
Effective Depth, d = D - Cb - B1 - (B2/2)
= 250-25-10-(10/2)
= 210.0 mm
Max +ve moment at mid span, M = b sy h lx
= 0.05614.58
= 51.97 kN-m
z = 0.95d, , as the value is greater than 0.95
Area of Steel reqd., Ast = M /.95 fy z
= 51.9710^6/(0.95460.0.95210)
= 596.11 mm
Spacing reqd., s = 132 mm
Spacing prod. = 100 mm B2extra = 0
Provide T10 @ 100mm c/c (B2)
Area of Steel prod., Ast = 785.00 mm Hence Ok

Note:-
Project : 132/11 kV S/S AT E1, W6, KHALIFA PARK, KHALIFA IIA
Title : 132/11kV S/S AT KHALIFA IIA
Doc. No. : 4351-SE-1000-J-103 Rev - Job 5V080007
Description: GROUND SLAB DESIGN Sheet No.
Location: GS 69-72