Académique Documents
Professionnel Documents
Culture Documents
Para e L/6
Entonces: q1,2 =
q1 =
Ancho de cimentacin
B =
La cimentacin combinada se trabaja con una viga con dos apoyos Isostticos:
Azap =
Vc = 1.1
- El diseo del Acero toma las expresiones del Diseo de Zapata Aislada.
PD = 75 Tn PD = 125 Tn Df = 1.20 m
PL = 35 Tn PL = 50 Tn 2 kg/cm2
Considerar:
Azap =
Ptotal = P1 + P2
P1 = 75 + 35 = 110 Tn
P2 = 125 + 50 = 175 Tn
Ahora:
= - hNPT - S/C
= 16.60 Tn/m2
Azap = = 17.17 m2
Para ubicar la Resultante del Peso Total y coincide con la reaccin del Terreno,
tenemos:
Rx0 = P1 +
X0 =
X0 = 3.67 m
USAR L = 7.35 m
Luego:
b = = = 2.34 m 2.40
P1u = 164.5 Tn
P2u = 260 Tn
Vz = 0
P1v + x = 0
X = = = 2.85 m
Mmax = P1u
Mmax = 57.76 )
P 0.50 Pb = 0.09
D = 77.43 cm
Luego:
Nuevamente: d = 90 75 = 81.87 cm
VERIFICACION POR CORTANTE
Ahora: Vc = 1.1 bd
Condicin: Vc - conforme
a) Refuerzo superior
d = 81.87 cm
As =
a =
Nuevamente:
As = = 65.68 cm2
a = 7.72 cm
# var = = 12.95 13 1
@ = = 18.45 20
USAR 1 @ 0.20 m
Verificacin de Cuanta
P = P > Pmin
Pmin = 0.0018
b) REFUERZO INFERIOR
Entonces: a = d/s
As = = 14.93 cm2
@ = = 0.17
USAR : # 0.17 M
DISEO EN EL SENTIDO TRANSVERSAL DE LA ZAPATA
Siendo:
b1 = 50 + 81.87/2 = 90.94 . b1 = 95 cm
Mumax = = 30.93 Tn m
As = = 11.11 cm2
Asmin = 0.0018 (95) (81.87)
# var = = 4.91 S
USAR: 5
Mj = = 41.47 Tn/m
Pero:
# var = = 6.77
USAR: 7
= 2 t n/m3
hNPT + 0.25
N Pisos : 3 niveles
USO : Oficinas
Solucin:
METRADO DE CARGAS
b2 x d2 = = 622.81 cm2
b2 = d2 = 24.96 cm
C1 PL1 = 10.50 tn
PL2 = 7.88 Tn
Ahora: Ptotal = P1 + P2
Azap = = 10.86 m2
Ubicacin de Resultante:
Rx0 = P1 + P2
Xo =
Xo = 1.84 m
Entonces:
P1u = 52.58 Tn
P1u = 39.45 Tn
X = = 1.59 m
Entonces:
Mmax = = 31.44 Tn m
W = 0.09 (aluminios)
d = 25.72 cm
luego: hzap = 25.72 + 7.5 + = 633.86 cm 35
. d = 35 7.5 = 26.87 cm
La condicin es : Vu/ Vc
Hzap = 35 + 5 = 40 cm -OK
A8 = = = 28.997 29 cm2
A = = 2.31 cm
As = 27.01 cm . a = 2.15 cm
- OK
USAR :
- OK
b) Refuerzo Inferior
# var = = 11.7 12
@ = 295 / 12 = 24.58 cm
b2 = 25 + 31.87/2 = 40.94 cm . b = 45 cm
Asmin= 0.0018 d
= 11.14
# VR=
USAR:6 5/
ACERO MONTAJE
Ahora:
= =20.46
A=
# VR=
USAR:8 3/
Ejemplo:
C1: 25x25 = 20 Tn = 10 Tn
C1: 35x35 = 32 Tn = 14 Tn
Solucin:
Tn=9 Tn/
e/6
B==23.77/9
Entonces B=2.64 m
USAR B=2.65m
Donde:
=1.2+ 1.6
= 1.2820+32)+1.6(10+14)
= 100.80 Tn
Ahora:
Para hallar q:
Entonces: = 4.548 X
= - 40 Tn + 8.79 x + = 0
- 40+8.79x+2.27 = 0
+ 3.87x 17.62 =0
2.686m x = 2.69m
= - 56.05 Tn-m
Dimensionamiento: W=0.09
=w(1-0.59w)
56.05x = 0.9(210)(265)(0.09)(1-0.59x0.09)
d=36.24cm
Luego:
USAR:=0.45m
d= 45-7.5- = 36.55cm
= =45.08 a=4.cm
=42.92 a=3.81cm
USAR: @0.18m.
Asmin = 0.0018 bd
USAR = @ 0.30 m
Columna exterior : Pd = 83 Tn PL = 36 Tn
Columna interior : PD = 52 Tn PL = 21 Tn
C2 = 30 x 30 cm2
= hNPT - S/Cpiso
R = 119 + 73 = 192 tn
Azap = = 16.99 m2
Xr = 1.66 m
= = 2.10 m - OK -
Area Trapezoidal:
Ahora:
X1 = Xr = = 1.66
= 4.95 . L (2a+b) = 4.98 (8.09)
a = 1.50 m
b = 6.59 m