Académique Documents
Professionnel Documents
Culture Documents
Title of Test: Compaction of soil with 8% quarry dust with 0.5% saw dust
Bulk Density (Pb) (W2-W1)/x g/cm3 1.62 1.69 1.77 1.82 1.92 1.97
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 49.30 51.80 37.90 42.50 40.20 45.50 38.20 48.00 32.50 42.70 31.40
Wt. of Dry soil & container (g) 46.20 48.40 35.40 39.40 36.60 41.00 34.50 42.70 29.50 37.80 27.90
Wt. of Container (g) 13.50 12.80 14.30 14.30 13.20 12.60 12.80 12.70 14.20 13.70 12.30
Wt. of dry soil (Wd) g 32.70 35.60 21.10 25.10 23.40 28.40 21.70 30.00 15.30 24.10 15.60
Wt. of Moisture (Wm) g 3.10 3.40 2.50 3.10 3.60 4.50 3.70 5.30 3.00 4.90 3.50
Moistur Content 100(Wm/Wd) % 9.48 9.55 11.85 12.35 15.38 15.85 17.05 17.67 19.61 20.33 22.44
Average Moisture Content (m) % 9.52 12.10 15.61 17.36 19.97 22.70
Dry Density = Pb/1+ (m/100) (g/cm3) 1.476 1.509 1.529 1.549 1.600 1.605
C.B.R. (mseen of top & bottom) %
1.650
1.600
1.550
Dry Density
1.500
1.450
1.400
5.00 10.00 15.00 20.00 25.00 30.00
1.450
1.400
5.00 10.00 15.00 20.00 25.00 30.00
Moisture Content
LATION OF SOIL
OPT.MC: 22.50%
9.52 1.476
12.10 1.509
15.61 1.529
17.36 1.549
19.97 1.600
22.70 1.605
24.48 1.603
26.74 1.534
30.00
30.00
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 8% QUARRY DUST AND 0.5% SAW DUST
DESCRIPTION DATE: 08/08/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 27 47 65 80 99 118 135 143 165 201
Load (KN) 0.00 0.30 0.51 0.71 0.88 1.08 1.29 1.48 1.56 1.80 2.20
C. B. R. %
UNSOAKED
2.5mm 5.0mm
BOTTOM 8.18 7.84
TOP 8.01 7.40
Force on Plunger ( kN )
12
50 40
11
10 30
9
25
8
7
20
6
5 15
12.50
233
2.55
TOP (UNSOAKED)
BOTTOM (UNSOAKED)
11 12
DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SO
USING STANDARD COMPACTION
Title of Test: Compaction of soil with 8% quarry dust with 1.0% saw dust
Wt. of mould & wet Soil (W2) g 3475.00 3550.00 3650.00 3700.00 3775.00 3875.00
Wt. of mould (W1) g 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1575.00 1650.00 1750.00 1800.00 1875.00 1975.00
Bulk Density (Pb) (W2-W1)/x g/cm3 1.59 1.67 1.77 1.82 1.89 1.99
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 49.10 50.50 46.80 52.10 31.00 38.50 31.20 41.20 34.10 45.50 35.60
Wt. of Dry soil & container (g) 45.90 47.00 43.20 47.80 28.50 34.80 28.40 36.80 30.70 39.90 31.20
Wt. of Container (g) 13.50 12.80 14.30 14.30 13.20 12.60 12.80 12.70 14.20 13.70 12.30
Wt. of dry soil (Wd) g 32.40 34.20 28.90 33.50 15.30 22.20 15.60 24.10 16.50 26.20 18.90
Wt. of Moisture (Wm) g 3.20 3.50 3.60 4.30 2.50 3.70 2.80 4.40 3.40 5.60 4.40
Moistur Content 100(Wm/Wd) % 9.88 10.23 12.46 12.84 16.34 16.67 17.95 18.26 20.61 21.37 23.28
Average Moisture Content (m) % 10.06 12.65 16.50 18.10 20.99 23.69
Dry Density = Pb/1+ (m/100) (g/cm3) 1.446 1.480 1.517 1.539 1.565 1.613
C.B.R. (mseen of top & bottom) %
1.650
1.600
1.550
Dry Density
1.500
1.450
1.400
1.350
5.00 10.00 15.00 20.00 25.00 30.00 35.00
1.400
1.350
5.00 10.00 15.00 20.00 25.00 30.00 35.00
Moisture Content
Y RELATION OF SOIL
ON
OPT.MC: 23.70%
10.06
12.65
16.50
18.10
20.99
23.69
27.08
28.49
29.87
UNSOAKED
2.5mm 5.0mm
BOTTOM 6.94 7.73
TOP 6.11 6.96
Force on Plunger ( kN )
12
50 40
11
10 30
9
25
8
7
20
6
5 15
12.50
203
2.22
TOP (UNSOAKED)
BOTTOM (UNSOAKED)
11 12
DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SOIL
USING STANDARD COMPACTION
Title of Test: Compaction of soil with 8% quarry dust with 1.5% saw dust
Wt. of mould & wet Soil (W2) g 3475.00 3575.00 3675.00 3750.00 3850.00 3900.00
Wt. of mould (W1) g 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1575.00 1675.00 1775.00 1850.00 1950.00 2000.00
Bulk Density (Pb) (W2-W1)/x g/cm3 1.59 1.69 1.79 1.87 1.97 2.02
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 26.30 29.60 35.70 42.10 37.40 48.50 36.40 46.70 38.80 49.80 31.80
Wt. of Dry soil & container (g) 25.10 28.00 33.20 38.80 33.80 43.10 32.60 41.00 34.30 42.90 27.90
Wt. of Container (g) 13.50 12.80 14.30 14.30 13.20 12.60 12.80 12.70 14.20 13.70 12.30
Wt. of dry soil (Wd) g 11.60 15.20 18.90 24.50 20.60 30.50 19.80 28.30 20.10 29.20 15.60
Wt. of Moisture (Wm) g 1.20 1.60 2.50 3.30 3.60 5.40 3.80 5.70 4.50 6.90 3.90
Moistur Content 100(Wm/Wd) % 10.34 10.53 13.23 13.47 17.48 17.70 19.19 20.14 22.39 23.63 25.00
Average Moisture Content (m) % 10.44 13.35 17.59 19.67 23.01 25.25
Dry Density = Pb/1+ (m/100) (g/cm3) 1.441 1.493 1.525 1.562 1.601 1.613
C.B.R. (mseen of top & bottom) %
1.650
1.600
1.550
Dry Density
1.500
1.450
1.400
1.450
1.400
1.350
5.00 10.00 15.00 20.00 25.00 30.00 35.00
Moisture Content
LATION OF SOIL
OPT.MC: 25.2%
10.44 1.441
13.35 1.493
17.59 1.525
19.67 1.562
23.01 1.601
25.25 1.613
27.85 1.600
29.68 1.577
0 35.00
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 8% QUARRY DUST AND 1.5% SAW DUST
DESCRIPTION DATE: 08/08/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 25 44 60 73 79 96 115 132 148 173
Load (KN) 0.00 0.27 0.48 0.66 0.80 0.86 1.05 1.26 1.44 1.62 1.89
C. B. R. %
UNSOAKED
2.5mm 5.0mm
BOTTOM 6.52 7.23
TOP 5.62 6.58
Force on Plunger ( kN )
12
50 40
11
10 30
9
25
8
7
20
6
5 15
12.50
188
2.06
TOP (UNSOAKED)
BOTTOM (UNSOAKED)
11 12
DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SO
USING STANDARD COMPACTION
Wt. of mould & wet Soil (W2) g 3500.00 3550.00 3625.00 3725.00 3825.00 3875.00
Wt. of mould (W1) g 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1600.00 1650.00 1725.00 1825.00 1925.00 1975.00
Bulk Density (Pb) (W2-W1)/x g/cm3 1.62 1.67 1.74 1.84 1.94 1.99
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 39.80 42.10 41.50 50.60 48.80 39.70 37.10 41.50 38.00 39.70 32.00
Wt. of Dry soil & container (g) 37.30 39.30 38.40 46.40 44.60 36.00 33.40 37.00 33.80 35.00 28.20
Wt. of Container (g) 13.50 12.80 14.30 14.30 13.20 12.60 12.80 12.70 14.20 13.70 12.30
Wt. of dry soil (Wd) g 23.80 26.50 24.10 32.10 31.40 23.40 20.60 24.30 19.60 21.30 15.90
Wt. of Moisture (Wm) g 2.50 2.80 3.10 4.20 4.20 3.70 3.70 4.50 4.20 4.70 3.80
Moistur Content 100(Wm/Wd) % 10.50 10.57 12.86 13.08 13.38 15.81 17.96 18.52 21.43 22.07 23.90
Average Moisture Content (m) % 10.54 12.97 14.59 18.24 21.75 24.14
Dry Density = Pb/1+ (m/100) (g/cm3) 1.462 1.475 1.521 1.559 1.597 1.607
C.B.R. (mseen of top & bottom) %
1.650
1.600
1.550
DRy Density
1.500
1.450
1.400
1.450
1.400
1.350
5.00 10.00 15.00 20.00 25.00 30.0
Moisture Content
Y RELATION OF SOIL
ON
OPT.MC: 24.00%
23.70%
10.54
12.97
14.59
18.24
21.75
24.14
26.95
29.03
30.90
0 25.00 30.00 35.00
ontent
1.462
1.475
1.521
1.559
1.597
1.607
1.611
1.585
1.505
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 8% QUARRY DUST AND 2.0% SAW DUST
DESCRIPTION DATE: 09/08/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 21 40 64 72 77 92 112 130 150 172
Load (KN) 0.00 0.23 0.44 0.70 0.79 0.84 1.01 1.23 1.42 1.64 1.88
C. B. R. %
UNSOAKED
2.5mm 5.0mm
BOTTOM 6.36 7.12
TOP 5.29 6.52
Force on Plunger ( kN )
12
50 40
11
10 30
9
25
8
7
20
6
5 15
12.50
182
1.99
TOP (UNSOAKED)
BOTTOM (UNSOAKED)
11 12