EVALUACIN DE UN PIT

.=/

PIT
PIT m3 densidad ton R.D
MINERAL 1,937,103.33 2.56 151,278,358.45
PIT 50 ESTERIL 17,370,014.57 2.50 43,425,036.43 8.97
TOTAL 19,307,117.90 194,703,394.88
MINERAL 1,956,418.25 2.56 5,008,430.72
PIT 60 ESTERIL 18,171,930.80 2.50 45,429,827.00 9.29
TOTAL 20,128,349.05 50,438,257.72
MINERAL 1,464,519.59 2.56 3,749,170.15
PIT 70 ESTERIL 13,096,818.17 2.50 32,742,045.43 8.94
TOTAL 14,561,337.76 36,491,215.58
MINERAL 1,929,949.14 2.56 4,940,669.80
PIT 80 ESTERIL 17,801,522.08 2.50 44,503,805.20 9.22
TOTAL 19,731,471.22 49,444,475.00
MINERAL 1,940,321.06 2.56 4,967,221.91
PIT 90 ESTERIL 17,997,997.39 2.50 44,994,993.48 9.28
TOTAL 19,938,318.45 49,962,215.39
MINERAL 1,819,404.07 2.56 4,657,674.42
PITPTIMO ESTERIL 16,247,050.71 2.50 40,617,626.78 8.93
TOTAL 18,066,454.78 45,275,301.19

COMENTARIO:
CONFORME EL PIT AUMENTA SU ABERTURA EL RADIO DE DESBROCE AUMENTA A FAVOR DE
ESTERIL. ES POR ESO QUE EL PIT OPTIMO SERA: EL pitptimo-calculado con (design)
N PIT

POR 8..97 m3 de estril recuperamos 1 m3 de mineral

POR 9.29 m3 de estril recuperamos 1m3 de mineral

POR 8.94 m3 de estril recuperamos 1m3 de mineral

POR 9.22 m3 de estril recuperamos 1m3 de mineral

POR 9.28 m3 de estril recuperamos 1m3 de mineral

POR 8.93 m3 de estril recuperamos 1m3 de mineral

BROCE AUMENTA A FAVOR DEL MATERIAL


-calculado con (design)