Académique Documents
Professionnel Documents
Culture Documents
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
01 OBRAS PROVISIONALES 1,078.13 1,078.13 100.00% 0.00%
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 1,078.13 1,078.13 1,078.13 100.00% 0.00%
02 SISTEMAS DE AGUA POTABLE 897,019.00 145,113.48 16.18% 178,959.88 19.95% 179,205.42
02.01 SECTOR PIRATA CHILN 396,769.44 125,580.95 31.65% 159,355.48 40.16% 97,791.68
02.01.01 DEMOLICIONES 457.58 457.58 100.00% 0.00%
02.01.01.01 DEMOLICION DE ESTRUCTURAS DE CONCRETO (CAPTACIN) m3 2.46 186.01 457.58 457.58 100.00% 0.00%
02.01.02 CONSTRUCCION DE CAPTACION TIPO C1 (01 UND.) 4,500.76 4,500.76 100.00% 0.00%
02.01.02.01 LIMPIEZA MANUAL DE TERRENO m2 25.00 0.95 23.75 23.75 100.00% 0.00%
02.01.02.02 TRAZO Y REPLANTEO m2 5.30 5.35 28.36 28.36 100.00% 0.00%
02.01.02.03 EXCAVACION MANUAL m3 4.24 28.51 120.88 120.88 100.00% 0.00%
02.01.02.04 ELIMINACION MATERIAL EXCEDENTE m3 5.30 19.00 100.70 100.70 100.00% 0.00%
02.01.02.05 REFINE, NIVELACION Y COMPACTACION m2 5.30 2.23 11.82 11.82 100.00% 0.00%
02.01.02.06 ENCOFRADO Y DESENCOFRADO m2 18.60 40.90 760.74 760.74 100.00% 0.00%
02.01.02.07 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 2.46 379.34 933.18 933.18 100.00% 0.00%
02.01.02.08 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 36.31 100.00% 0.00%
02.01.02.09 ACERO F'y= 4200 KG/CM2, D=3/8" kg 20.92 3.64 76.15 76.15 100.00% 0.00%
02.01.02.10 COLOCACION DE GRAVA 3" EN FILTRO m3 0.51 110.03 56.12 56.12 100.00% 0.00%
02.01.02.11 COLOCACION DE GRAVILLA 1" EN FILTRO m3 0.99 153.13 151.60 151.60 100.00% 0.00%
02.01.02.12 COLOCACION DE ARENA GRUESA EN FILTRO m3 1.42 188.25 267.32 267.32 100.00% 0.00%
02.01.02.13 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 11.64 14.12 164.36 164.36 100.00% 0.00%
02.01.02.14 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 7.02 16.78 117.80 117.80 100.00% 0.00%
02.01.02.15 PENDIENTE FONDO (MORTERO 1:5) m2 0.49 16.18 7.93 7.93 100.00% 0.00%
02.01.02.16 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 11.64 8.12 94.52 94.52 100.00% 0.00%
02.01.02.17 SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA 2" + ACCES.-VENTILACION und 1.00 135.42 135.42 135.42 100.00% 0.00%
02.01.02.18 SUM. Y COLOC. ACCESORIOS SALIDA TUBERIA DE SALIDA, 3" und 1.00 362.30 362.30 362.30 100.00% 0.00%
02.01.02.19 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00 144.69 144.69 144.69 100.00% 0.00%
02.01.02.20 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 178.59 100.00% 0.00%
02.01.02.21 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.46 142.98 65.77 65.77 100.00% 0.00%
02.01.02.22 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 10.30 45.80 471.74 471.74 100.00% 0.00%
02.01.02.23 PUERTA DE CERCO PERIMTRICO und 1.00 124.47 124.47 124.47 100.00% 0.00%
02.01.02.24 CURADO DE OBRAS DE CONCRETO m2 18.66 3.55 66.24 66.24 100.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.01.03 INSTALACION DE LINEA DE CONDUCCION 2,846.70 2,846.70 100.00% 0.00%
02.01.03.01 TRAZO, NIVELACION Y REPLANTEO m 90.00 1.40 126.00 126.00 100.00% 0.00%
02.01.03.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 90.00 3.80 342.00 342.00 100.00% 0.00%
02.01.03.03 CAMA DE APOYO PARA TUBERIA m 90.00 3.22 289.80 289.80 100.00% 0.00%
02.01.03.04 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 3" m 90.00 17.18 1,546.20 1,546.20 100.00% 0.00%
02.01.03.05 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 90.00 4.56 410.40 410.40 100.00% 0.00%
02.01.03.06 PRUEBA HIDRAULICA + DESINFECCION TUBERIA PVC m 90.00 1.47 132.30 132.30 100.00% 0.00%
02.01.04 CONST. RESERVORIO RECTANGULAR 10 M3 (01 UND) 9,947.10 9,947.10 100.00% 0.00%
02.01.04.01 LIMPIEZA MANUAL DE TERRENO m2 11.56 0.95 10.98 10.98 100.00% 0.00%
02.01.04.02 TRAZO Y REPLANTEO m2 11.56 5.35 61.85 61.85 100.00% 0.00%
02.01.04.03 EXCAVACION MANUAL m3 5.78 28.51 164.79 164.79 100.00% 0.00%
02.01.04.04 REFINE, NIVELACION Y COMPACTACION m2 11.56 2.23 25.78 25.78 100.00% 0.00%
02.01.04.05 ELIMINACION MATERIAL EXCEDENTE m3 7.23 19.00 137.37 137.37 100.00% 0.00%
02.01.04.06 SOLADO DE 3" MEZCLA 1:12 CEMENTO-HORMIGON m2 11.56 15.33 177.21 177.21 100.00% 0.00%
02.01.04.07 ENCOFRADO Y DESENCOFRADO MUROS (02 CARAS) m2 37.62 40.90 1,538.66 1,538.66 100.00% 0.00%
02.01.04.08 ENCOFRADO Y DESENCOFRADO DE LOSA m2 11.45 40.90 468.31 468.31 100.00% 0.00%
02.01.04.09 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 5.68 379.34 2,154.65 2,154.65 100.00% 0.00%
02.01.04.10 ACERO F'y= 4200 KG/CM2, D=1/2" kg 568.77 3.64 2,070.32 2,070.32 100.00% 0.00%
02.01.04.11 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 35.16 14.12 496.46 496.46 100.00% 0.00%
02.01.04.12 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 17.82 16.78 299.02 299.02 100.00% 0.00%
02.01.04.13 PENDIENTE FONDO (MORTERO 1:5) m2 7.29 16.18 117.95 117.95 100.00% 0.00%
02.01.04.14 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 35.16 8.12 285.50 285.50 100.00% 0.00%
02.01.04.15 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 178.59 100.00% 0.00%
02.01.04.16 ACCESORIOS TUBERIA DE VENTILACIN 2", JUNTA WATER STOP und 1.00 314.58 314.58 314.58 100.00% 0.00%
02.01.04.17 VEREDA DE CONCRETO DE E=4" m2 2.72 36.55 99.42 99.42 100.00% 0.00%
02.01.04.18 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.40 142.98 57.19 57.19 100.00% 0.00%
02.01.04.19 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 16.00 45.80 732.80 732.80 100.00% 0.00%
02.01.04.20 PUERTA DE CERCO PERITRICO und 1.00 124.47 124.47 124.47 100.00% 0.00%
02.01.04.21 ESCALERA PREFABRICADA DE TUBERIA DE FG 3/4" und 1.00 243.12 243.12 243.12 100.00% 0.00%
02.01.04.22 CURADO DE OBRAS DE CONCRETO m2 52.98 3.55 188.08 188.08 100.00% 0.00%
02.01.05 CASETA DE CLORACIN POR GOTEO 6,770.62 6,770.62 100.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.01.05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 15.80 66.25 1,046.75 1,046.75 100.00% 0.00%
02.01.05.02 LISTONES DE MADERA 2"X2"X12 und 10.00 50.09 500.90 500.90 100.00% 0.00%
02.01.05.03 TARRAJEO DE MUROS INTERIORES Y EXTERIORES m2 31.60 14.12 446.19 446.19 100.00% 0.00%
PUERTA CONTRAPLACADA DE 2.00X0.90 (INCLUYE MARCO, CERRAJERA
02.01.05.04 und 1.00 318.53 318.53 318.53
PINTURA E INSTALACIN). 100.00% 0.00%
02.01.05.05 COLOCADO TEJA ANDINA ETERNIT m2 5.76 61.56 354.59 354.59 100.00% 0.00%
02.01.05.06 PINTURA EN MUROS EXTERIORES E INTERIORES m2 31.60 6.39 201.92 201.92 100.00% 0.00%
02.01.05.07 SUM. E INST. SISTEMA DE CLORACION X GOTEO GLB 1.00 3,901.74 3,901.74 3,901.74 100.00% 0.00%
02.01.06 CASETAS DE VALVULAS (01 UND.) 2,095.42 2,095.42 100.00% 0.00%
02.01.06.01 TRAZO Y REPLANTEO m2 1.88 5.35 10.06 10.06 100.00% 0.00%
02.01.06.02 EXCAVACION MANUAL m3 1.13 28.51 32.22 32.22 100.00% 0.00%
02.01.06.03 ELIMINACION MATERIAL EXCEDENTE m3 1.41 19.00 26.79 26.79 100.00% 0.00%
02.01.06.04 REFINE, NIVELACION Y COMPACTACION m2 1.88 2.23 4.19 4.19 100.00% 0.00%
02.01.06.05 ENCOFRADO Y DESENCOFRADO m2 6.55 40.90 267.90 267.90 100.00% 0.00%
02.01.06.06 CONCRETO F'C=210 KG/CM2 - LOSAS m3 0.72 366.61 263.96 263.96 100.00% 0.00%
02.01.06.07 ACERO F'y= 4200 KG/CM2, D=3/8" kg 7.48 3.64 27.23 27.23 100.00% 0.00%
02.01.06.08 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 6.39 14.12 90.23 90.23 100.00% 0.00%
02.01.06.09 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 4.14 8.12 33.62 33.62 100.00% 0.00%
02.01.06.10 SUM. Y COLOC. TAPA METALICA DE 0.80 x 0.80 und 1.00 210.71 210.71 210.71 100.00% 0.00%
02.01.06.11 SUM. Y COLOC. VALVULA 3"+ACCESORIOS-INGRESO R. 15M3 und 1.00 363.19 363.19 363.19 100.00% 0.00%
02.01.06.12 SUM. Y COLOC. VALVULA 2"+ACCESORIOS-SALIDA R. 15 m3 und 1.00 389.67 389.67 389.67 100.00% 0.00%
02.01.06.13 SUM. Y COLOC. TUBERIA DE LIMPIEZA Y REBOSE 2" + ACCESORIOS und 1.00 310.79 310.79 310.79 100.00% 0.00%
02.01.06.14 GRAVA PARA CAJAS, MAX.1" m3 0.06 97.80 5.87 5.87 100.00% 0.00%
02.01.06.15 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 36.31 100.00% 0.00%
02.01.06.16 CURADO DE OBRAS DE CONCRETO m2 6.39 3.55 22.68 22.68 100.00% 0.00%
02.01.07 INSTALACION RED DE DISTRIBUCIN 299,496.27 98,962.77 33.04% 159,319.95 53.20% 41,213.57
02.01.07.01 TRAZO, NIVELACION Y REPLANTEO m 12,685.00 1.40 17,759.00 17,759.00 100.00% 0.00%
02.01.07.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 8,800.00 3.80 33,440.00 22,154.00 66.25% 11,286.00 33.75%
02.01.07.03 EXCAVACION DE ZANJA, TERRENO SEMI ROCOSO m 3,805.00 15.84 60,271.20 44,826.71 74.38% 15,444.50 25.63%
02.01.07.04 CAMA DE APOYO PARA TUBERIA m 12,685.00 3.22 40,845.70 14,223.06 34.82% 26,622.64 65.18%
02.01.07.05 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1/2" m 3,950.00 4.24 16,748.00 0.00% 16,748.00 100.00%
02.01.07.06 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 3/4" m 4,000.00 4.61 18,440.00 0.00% 18,440.00 100.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.01.07.07 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1" m 2,275.00 6.03 13,718.25 0.00% 13,718.25 100.00%
02.01.07.08 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1 1/2" m 1,970.00 8.09 15,937.30 0.00% 15,937.30 100.00%
02.01.07.09 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 2" m 490.00 9.75 4,777.50 0.00% 4,777.50 100.00%
02.01.07.10 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 12,685.00 4.56 57,843.60 0.00% 16,630.04 28.75% 41,213.57
02.01.07.11 SUM. Y COLOC. ACCESORIOS RED DISTRIBUCION glb 1.00 1,068.77 1,068.77 0.00% 1,068.77 100.00%
02.01.07.12 PRUEBA HIDRAULICA+DESINFECCIN TUBERIA PVC m 12,685.00 1.47 18,646.95 0.00% 18,646.95 100.00%
02.01.08 CONSTRUCCION DE CAMARAS ROMPE PRESION TIPO 7 (9 UND.) 21,105.97 0.00% 35.53 0.17% 21,070.44
02.01.08.01 TRAZO Y REPLANTEO m2 13.86 5.35 74.15 0.00% 35.53 47.92% 38.62
02.01.08.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 11.09 28.51 316.18 0.00% 0.00% 316.18
02.01.08.03 ENCOFRADO Y DESENCOFRADO m2 73.44 40.90 3,003.70 0.00% 0.00% 3,003.70
02.01.08.04 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 7.08 379.34 2,685.73 0.00% 0.00% 2,685.73
02.01.08.05 ACERO F'y= 4200 KG/CM2, D=3/8" kg 436.56 3.64 1,589.08 0.00% 0.00% 1,589.08
02.01.08.06 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 65.88 14.12 930.23 0.00% 0.00% 930.23
02.01.08.07 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 25.92 16.78 434.94 0.00% 0.00% 434.94
02.01.08.08 DADOS DE CONCRETO P/DESAGUE und 9.00 36.31 326.79 0.00% 0.00% 326.79
02.01.08.09 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 65.88 8.12 534.95 0.00% 0.00% 534.95
02.01.08.10 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 9.00 178.59 1,607.31 0.00% 0.00% 1,607.31
02.01.08.11 SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA 2" + ACCES.-VENTILACION 1" und 9.00 135.42 1,218.78 1,218.78
0.00% 0.00%
02.01.08.12 SUM. Y COLOC. VALVULA 2"+ ACCESORIOS-INGRESO 01 und 1.00 386.10 386.10 0.00% 0.00% 386.10
02.01.08.13 SUM. Y COLOC. VALVULA 1 1/2"+ACCESORIOS - INGRESO und 2.00 243.50 487.00 0.00% 0.00% 487.00
02.01.08.14 SUM. Y COLOC. VALVULA 1"+ACCESORIOS - INGRESO und 2.00 193.21 386.42 0.00% 0.00% 386.42
02.01.08.15 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS - INGRESO und 3.00 137.68 413.04 0.00% 0.00% 413.04
02.01.08.16 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS - INGRESO und 1.00 128.74 128.74 0.00% 0.00% 128.74
02.01.08.17 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 2" - CRP-7 und 1.00 183.88 183.88 0.00% 0.00% 183.88
02.01.08.18 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1 1/2" - CRP-7 und 2.00 119.17 238.34 238.34
0.00% 0.00%
02.01.08.19 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1" - CRP-7 und 2.00 80.87 161.74 0.00% 0.00% 161.74
02.01.08.20 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 3/4" - CRP-7 und 3.00 78.67 236.01 0.00% 0.00% 236.01
02.01.08.21 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1/2" - CRP-7 und 1.00 61.24 61.24 0.00% 0.00% 61.24
02.01.08.22 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 3.24 142.98 463.26 0.00% 0.00% 463.26
02.01.08.23 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 82.80 45.80 3,792.24 0.00% 0.00% 3,792.24
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
02.01.08.18 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1 1/2" - CRP-7 und 2.00 119.17 238.34
100.00% 0.00% 0.00%
02.01.08.19 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1" - CRP-7 und 2.00 80.87 161.74 100.00% 0.00% 0.00%
02.01.08.20 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 3/4" - CRP-7 und 3.00 78.67 236.01 100.00% 0.00% 0.00%
02.01.08.21 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1/2" - CRP-7 und 1.00 61.24 61.24 100.00% 0.00% 0.00%
02.01.08.22 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 3.24 142.98 463.26 100.00% 0.00% 0.00%
02.01.08.23 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 82.80 45.80 3,792.24 100.00% 0.00% 0.00%
L SERVICIO
PROYECTO: DE AGUA POTABLE Y LETRINASAMPLIACIN
SANITARIAS Y
ENMEJORAMIENTO
EL CASERIO DE ANEXO
DEL SERVICIO
CHILON,DEDISTRITO
AGUA POTABLE
DE HUALGAYOC
Y LETRINAS
- HUALGA
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
02.01.08.18 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1 1/2" - CRP-7 und 2.00 119.17 238.34
0.00% 0.00%
02.01.08.19 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1" - CRP-7 und 2.00 80.87 161.74 0.00% 0.00%
02.01.08.20 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 3/4" - CRP-7 und 3.00 78.67 236.01 0.00% 0.00%
02.01.08.21 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1/2" - CRP-7 und 1.00 61.24 61.24 0.00% 0.00%
02.01.08.22 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 3.24 142.98 463.26 0.00% 0.00%
02.01.08.23 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 82.80 45.80 3,792.24 0.00% 0.00%
Y LETRINAS
PROYECTO: SANITARIAS EN EL CASERIO DEAMPLIACIN
ANEXO CHILON,
Y MEJORAMIENTO
DISTRITO DE HUALGAYOC
DEL SERVICIO
- HUALGAYOC
DE AGUA POTABLE
- CAJAMARCA
Y LETRINAS SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
02.01.08.18 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1 1/2" - CRP-7 und 2.00 119.17 238.34
0.00% 0.00%
02.01.08.19 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1" - CRP-7 und 2.00 80.87 161.74 0.00% 0.00%
02.01.08.20 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 3/4" - CRP-7 und 3.00 78.67 236.01 0.00% 0.00%
02.01.08.21 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1/2" - CRP-7 und 1.00 61.24 61.24 0.00% 0.00%
02.01.08.22 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 3.24 142.98 463.26 0.00% 0.00%
02.01.08.23 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 82.80 45.80 3,792.24 0.00% 0.00%
ASERIO DE ANEXO CHILON, DISTRITO DE HUALGAYOC
PROYECTO: AMPLIACIN- YHUALGAYOC
MEJORAMIENTO
- CAJAMARCA
DEL SERVICIO DE AGUA POTABLE Y LETRINAS SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
02.01.08.18 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1 1/2" - CRP-7 und 2.00 119.17 238.34
0.00% 0.00%
02.01.08.19 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1" - CRP-7 und 2.00 80.87 161.74 0.00% 0.00%
02.01.08.20 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 3/4" - CRP-7 und 3.00 78.67 236.01 0.00% 0.00%
02.01.08.21 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1/2" - CRP-7 und 1.00 61.24 61.24 0.00% 0.00%
02.01.08.22 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 3.24 142.98 463.26 0.00% 0.00%
02.01.08.23 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 82.80 45.80 3,792.24 0.00% 0.00%
PROYECTO: AMPLIACIN Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y LETRINAS SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.01.08.24 PUERTA DE CERCO PERITRICO und 9.00 124.47 1,120.23 0.00% 0.00% 1,120.23
02.01.08.25 CURADO DE OBRAS DE CONCRETO m2 91.80 3.55 325.89 0.00% 0.00% 325.89
02.01.09 VALVULAS DE CONTROL (17 UND.) 6,968.87 0.00% 0.00% 6,968.87
02.01.09.01 TRAZO Y REPLANTEO m2 20.40 5.35 109.14 0.00% 0.00% 109.14
02.01.09.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 12.24 28.51 348.96 0.00% 0.00% 348.96
02.01.09.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 34.00 39.00 1,326.00 0.00% 0.00% 1,326.00
02.01.09.04 CONCRETO F'C=175 KG/CM2 m3 1.70 320.46 544.78 0.00% 0.00% 544.78
02.01.09.05 GRAVA PARA CAJAS, MAX.1" m3 0.27 97.80 26.41 0.00% 0.00% 26.41
02.01.09.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 34.00 14.12 480.08 0.00% 0.00% 480.08
02.01.09.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 17.00 144.69 2,459.73 0.00% 0.00% 2,459.73
02.01.09.08 SUM. Y COLOC. VALVULA 2"+ACCESORIOS und 1.00 147.29 147.29 0.00% 0.00% 147.29
02.01.09.09 SUM. Y COLOC. VALVULA 1 1/2"+ACCESORIOS und 4.00 122.11 488.44 0.00% 0.00% 488.44
02.01.09.10 SUM. Y COLOC. VALVULA 1"+ACCESORIOS und 2.00 114.31 228.62 0.00% 0.00% 228.62
02.01.09.11 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 9.00 52.65 473.85 0.00% 0.00% 473.85
02.01.09.12 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS und 1.00 49.22 49.22 0.00% 0.00% 49.22
02.01.09.13 CURADO DE OBRAS DE CONCRETO m2 34.00 3.55 120.70 0.00% 0.00% 120.70
02.01.09.14 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 20.40 8.12 165.65 0.00% 0.00% 165.65
02.01.10 VALVULAS DE PURGA (03 UND.) 1,366.52 0.00% 0.00% 1,366.52
02.01.10.01 TRAZO Y REPLANTEO m2 3.60 5.35 19.26 0.00% 0.00% 19.26
02.01.10.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 2.16 28.51 61.58 0.00% 0.00% 61.58
02.01.10.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 6.00 39.00 234.00 0.00% 0.00% 234.00
02.01.10.04 CONCRETO F'C=175 KG/CM2 m3 0.30 320.46 96.14 0.00% 0.00% 96.14
02.01.10.05 GRAVA PARA CAJAS, MAX.1" m3 0.05 97.80 4.89 0.00% 0.00% 4.89
02.01.10.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 6.00 14.12 84.72 0.00% 0.00% 84.72
02.01.10.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 3.00 144.69 434.07 0.00% 0.00% 434.07
02.01.10.08 SUM. Y COLOC. VALVULA 1 1/2"+ACCESORIOS und 1.00 111.28 111.28 0.00% 0.00% 111.28
02.01.10.09 SUM. Y COLOC. VALVULA 1"+ACCESORIOS und 1.00 101.58 101.58 0.00% 0.00% 101.58
02.01.10.10 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 1.00 59.54 59.54 0.00% 0.00% 59.54
02.01.10.11 DADOS DE CONCRETO P/DESAGUE und 3.00 36.31 108.93 0.00% 0.00% 108.93
02.01.10.12 CURADO DE OBRAS DE CONCRETO m2 6.00 3.55 21.30 0.00% 0.00% 21.30
02.01.10.13 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 3.60 8.12 29.23 0.00% 0.00% 29.23
02.01.11 VALVULAS DE AIRE (04 UND.) 1,632.54 0.00% 0.00% 1,632.54
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.01.11.01 TRAZO Y REPLANTEO m2 4.80 5.35 25.68 0.00% 0.00% 25.68
02.01.11.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 2.88 28.51 82.11 0.00% 0.00% 82.11
02.01.11.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 8.00 39.00 312.00 0.00% 0.00% 312.00
02.01.11.04 CONCRETO F'C=175 KG/CM2 m3 0.40 320.46 128.18 0.00% 0.00% 128.18
02.01.11.05 GRAVA PARA CAJAS, MAX.1" m3 0.06 97.80 5.87 0.00% 0.00% 5.87
02.01.11.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 8.00 14.12 112.96 0.00% 0.00% 112.96
02.01.11.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 4.00 144.69 578.76 0.00% 0.00% 578.76
02.01.11.08 SUM. Y COLOC. VALVULA 1 1/2"+ACCESORIOS und 2.00 87.37 174.74 0.00% 0.00% 174.74
02.01.11.09 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 2.00 79.53 159.06 0.00% 0.00% 159.06
02.01.11.10 CURADO DE OBRAS DE CONCRETO m2 4.00 3.55 14.20 0.00% 0.00% 14.20
02.01.11.11 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 4.80 8.12 38.98 0.00% 0.00% 38.98
02.01.12 CONEXIN DOMICILIARIA DE AGUA Y LAVADERO (66 UND) 39,581.09 0.00% 0.00% 25,539.74
02.01.12.01 CAJA PREFABRICADA DE 0.40X0.40 e=0.10mt und 66.00 66.53 4,390.98 0.00% 0.00% 640.35
02.01.12.02 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS und 66.00 49.22 3,248.52 0.00% 0.00%
02.01.12.03 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% PG. m3 8.87 305.90 2,713.33 0.00% 0.00% 2,713.33
02.01.12.04 CONCRETO F'C=175 KG/CM2 m3 12.04 320.46 3,858.34 0.00% 0.00% 3,858.34
02.01.12.05 ENCOFRADO Y DESENCOFRADO m2 186.25 40.90 7,617.63 0.00% 0.00% 7,617.63
02.01.12.06 ACERO F'y= 4200 KG/CM2, D=1/4" kg 612.48 3.86 2,364.17 0.00% 0.00% 2,364.17
02.01.12.07 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 39.60 66.25 2,623.50 0.00% 0.00% 2,623.50
02.01.12.08 TARRAJEO MEZCLA 1:5 m2 322.41 14.12 4,552.43 0.00% 0.00% 4,552.43
02.01.12.09 ACCESORIOS DE SALIDA DE PILETA und 66.00 31.61 2,086.26 0.00% 0.00%
02.01.12.10 ACCESORIOS DE DESAGUE DE PILETA und 66.00 39.13 2,582.58 0.00% 0.00%
02.01.12.11 ACCESORIOS DE LLAVE DE PASO und 66.00 35.96 2,373.36 0.00% 0.00%
02.01.12.12 CURADO DE OBRAS DE CONCRETO m2 322.41 3.55 1,144.56 0.00% 0.00% 1,144.56
02.01.12.13 GRAVA PARA CAJAS, MAX.1" m3 0.26 97.80 25.43 0.00% 0.00% 25.43
02.02 SECTOR YANAHUANGA 285,974.98 19,532.53 6.83% 19,604.41 6.86% 81,413.75
02.02.01 DEMOLICIONES 913.31 913.31 100.00% 0.00%
02.02.01.01 DEMOLICION DE ESTRUCTURAS DE CONCRETO (CAPTACIONES) m3 4.91 186.01 913.31 913.31 100.00% 0.00%
02.02.02 CONSTRUCCION DE CAPTACION TIPO C1 (02 UND.) 8,840.35 8,840.35 100.00% 0.00%
02.02.02.01 LIMPIEZA MANUAL DE TERRENO m2 50.00 0.95 47.50 47.50 100.00% 0.00%
02.02.02.02 TRAZO Y REPLANTEO m2 10.60 5.35 56.71 56.71 100.00% 0.00%
02.02.02.03 EXCAVACION MANUAL m3 8.48 28.51 241.76 241.76 100.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.02.02.04 ELIMINACION MATERIAL EXCEDENTE m3 10.60 19.00 201.40 201.40 100.00% 0.00%
02.02.02.05 REFINE, NIVELACION Y COMPACTACION m2 10.60 2.23 23.64 23.64 100.00% 0.00%
02.02.02.06 ENCOFRADO Y DESENCOFRADO m2 37.19 40.90 1,521.07 1,521.07 100.00% 0.00%
02.02.02.07 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 4.91 379.34 1,862.56 1,862.56 100.00% 0.00%
02.02.02.08 DADOS DE CONCRETO P/DESAGUE und 2.00 36.31 72.62 72.62 100.00% 0.00%
02.02.02.09 ACERO F'y= 4200 KG/CM2, D=3/8" kg 41.84 3.64 152.30 152.30 100.00% 0.00%
02.02.02.10 COLOCACION DE GRAVA 3/4" EN FILTRO m3 1.02 110.03 112.23 112.23 100.00% 0.00%
02.02.02.11 COLOCACION DE GRAVILLA 1/4" EN FILTRO m3 1.98 153.13 303.20 303.20 100.00% 0.00%
02.02.02.12 COLOCACION DE ARENA GRUESA EN FILTRO m3 2.84 188.25 534.63 534.63 100.00% 0.00%
02.02.02.13 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 23.28 14.12 328.71 328.71 100.00% 0.00%
02.02.02.14 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 14.04 16.78 235.59 235.59 100.00% 0.00%
02.02.02.15 PENDIENTE FONDO (MORTERO 1:5) m2 0.98 16.18 15.86 15.86 100.00% 0.00%
02.02.02.16 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 23.28 8.12 189.03 189.03 100.00% 0.00%
02.02.02.17 SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA 2" + ACCES.-VENTILACION und 2.00 135.42 270.84 270.84
100.00% 0.00%
02.02.02.18 SUM. Y COLOC. ACCESORIOS SALIDA TUBERIA DE SALIDA, 2" und 2.00 348.68 697.36 697.36 100.00% 0.00%
02.02.02.19 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 2.00 144.69 289.38 289.38 100.00% 0.00%
02.02.02.20 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 2.00 178.59 357.18 357.18 100.00% 0.00%
02.02.02.21 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.91 142.98 130.11 130.11 100.00% 0.00%
02.02.02.22 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 17.80 45.80 815.24 815.24 100.00% 0.00%
02.02.02.23 PUERTA DE CERCO PERITRICO und 2.00 124.47 248.94 248.94 100.00% 0.00%
02.02.02.24 CURADO DE OBRAS DE CONCRETO m2 37.32 3.55 132.49 132.49 100.00% 0.00%
02.02.03 INSTALACION DE LINEA DE CONDUCCION 9,680.00 9,680.00 100.00% 0.00%
02.02.03.01 TRAZO, NIVELACION Y REPLANTEO m 400.00 1.40 560.00 560.00 100.00% 0.00%
02.02.03.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 400.00 3.80 1,520.00 1,520.00 100.00% 0.00%
02.02.03.03 CAMA DE APOYO PARA TUBERIA m 400.00 3.22 1,288.00 1,288.00 100.00% 0.00%
02.02.03.04 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 2" m 400.00 9.75 3,900.00 3,900.00 100.00% 0.00%
02.02.03.05 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 400.00 4.56 1,824.00 1,824.00 100.00% 0.00%
02.02.03.06 PRUEBA HIDRAULICA + DESINFECCION TUBERIA PVC m 400.00 1.47 588.00 588.00 100.00% 0.00%
02.02.04 CONST. RESERVORIO RECTANGULAR DE 5 M3 (01 UND) 6,557.24 98.87 1.51% 6,458.37 98.49%
02.02.04.01 LIMPIEZA MANUAL DE TERRENO m2 8.41 0.95 7.99 6.99 87.48% 1.00 12.52%
02.02.04.02 TRAZO Y REPLANTEO m2 8.41 5.35 44.99 39.37 87.51% 5.62 12.49%
02.02.04.03 EXCAVACION MANUAL m3 4.21 28.51 120.03 52.51 43.75% 67.52 56.25%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.02.04.04 REFINE, NIVELACION Y COMPACTACION m2 8.41 2.23 18.75 0.00% 18.75 100.00%
02.02.04.05 ELIMINACION MATERIAL EXCEDENTE m3 5.26 19.00 99.94 0.00% 99.94 100.00%
02.02.04.06 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 8.41 15.33 128.93 0.00% 128.93 100.00%
02.02.04.07 ENCOFRADO Y DESENCOFRADO MUROS (02 CARAS) m2 24.44 40.90 999.60 0.00% 999.60 100.00%
02.02.04.08 ENCOFRADO Y DESENCOFRADO DE LOSA m2 8.40 40.90 343.56 0.00% 343.56 100.00%
02.02.04.09 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 3.49 379.34 1,323.90 0.00% 1,323.90 100.00%
02.02.04.10 ACERO F'y= 4200 KG/CM2, D=3/8" kg 243.73 3.64 887.18 0.00% 887.18 100.00%
02.02.04.11 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 24.61 14.12 347.49 0.00% 347.49 100.00%
02.02.04.12 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 11.44 16.78 191.96 0.00% 191.96 100.00%
02.02.04.13 PENDIENTE FONDO (MORTERO 1:5) m2 4.84 16.18 78.31 0.00% 78.31 100.00%
02.02.04.14 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 24.61 8.12 199.83 0.00% 199.83 100.00%
02.02.04.15 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 0.00% 178.59 100.00%
02.02.04.16 ACCESORIOS TUBERIA DE VENTILACIN 2", JUNTA WATER STOP und 1.00 314.58 314.58 0.00% 314.58 100.00%
02.02.04.17 VEREDA DE CONCRETO DE E=4" m2 2.32 36.55 84.80 0.00% 84.80 100.00%
02.02.04.18 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.35 142.98 50.04 0.00% 50.04 100.00%
02.02.04.19 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 14.00 45.80 641.20 0.00% 641.20 100.00%
02.02.04.20 PUERTA DE CERCO PERITRICO und 1.00 124.47 124.47 0.00% 124.47 100.00%
02.02.04.21 ESCALERA PREFABRICADA DE TUBERIA DE FG 3/4" und 1.00 243.12 243.12 0.00% 243.12 100.00%
02.02.04.22 CURADO DE OBRAS DE CONCRETO m2 36.05 3.55 127.98 0.00% 127.98 100.00%
02.02.05 CASETA DE CLORACIN POR GOTEO 5,944.01 0.00% 5,944.01 100.00%
02.02.05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 12.72 66.25 842.70 0.00% 842.70 100.00%
02.02.05.02 LISTONES DE MADERA 2"X2"X12 und 8.00 50.09 400.72 0.00% 400.72 100.00%
02.02.05.03 TARRAJEO DE MUROS INTERIORES Y EXTERIORES m2 25.44 14.12 359.21 0.00% 359.21 100.00%
PUERTA CONTRAPLACADA DE 2.00X0.90 (INCLUYE MARCO, CERRAJERA
02.02.05.04 und 1.00 318.53 318.53 318.53
PINTURA E INSTALACIN). 0.00% 100.00%
02.02.05.05 COLOCADO TEJA ANDINA ETERNIT m2 4.20 61.56 258.55 0.00% 258.55 100.00%
02.02.05.06 PINTURA EN MUROS EXTERIORES E INTERIORES m2 25.44 6.39 162.56 0.00% 162.56 100.00%
02.02.05.07 SUM. E INST. SISTEMA DE CLORACION X GOTEO GLB 1.00 3,601.74 3,601.74 0.00% 3,601.74 100.00%
02.02.06 CASETAS DE VALVULAS (01 UND.) 1,966.00 0.00% 1,318.82 67.08% 647.18
02.02.06.01 TRAZO Y REPLANTEO m2 1.88 5.35 10.06 0.00% 10.06 100.00%
02.02.06.02 EXCAVACION MANUAL m3 1.13 28.51 32.22 0.00% 32.22 100.00%
02.02.06.03 ELIMINACION MATERIAL EXCEDENTE m3 1.41 19.00 26.79 0.00% 26.79 100.00%
02.02.06.04 REFINE, NIVELACION Y COMPACTACION m2 1.88 2.23 4.19 0.00% 4.19 100.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.02.06.05 ENCOFRADO Y DESENCOFRADO m2 6.55 40.90 267.90 0.00% 267.90 100.00%
02.02.06.06 CONCRETO F'C=210 KG/CM2 - LOSAS m3 0.72 366.61 263.96 0.00% 263.96 100.00%
02.02.06.07 ACERO F'y= 4200 KG/CM2, D=3/8" kg 7.48 3.64 27.23 0.00% 27.23 100.00%
02.02.06.08 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 6.39 14.12 90.23 0.00% 90.23 100.00%
02.02.06.09 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 4.14 8.12 33.62 0.00% 33.62 100.00%
02.02.06.10 SUM. Y COLOC. TAPA METALICA DE 0.80 x 0.80 und 1.00 210.71 210.71 0.00% 210.71 100.00%
02.02.06.11 SUM. Y COLOC. VALVULA 2"+ACCESORIOS-INGRESO R. 7M3 und 1.00 334.77 334.77 0.00% 292.92 87.50% 41.85
02.02.06.12 SUM. Y COLOC. VALVULA 11/2"+ACCESORIOS - SALIDA R. 7M3 und 1.00 288.67 288.67 0.00% 0.00% 288.67
02.02.06.13 SUM. Y COLOC. TUBERIA DE LIMPIEZA Y REBOSE 2" + ACCESORIOS und 1.00 310.79 310.79 310.79
0.00% 0.00%
02.02.06.14 GRAVA PARA CAJAS, MAX.1" m3 0.06 97.80 5.87 0.00% 0.00% 5.87
02.02.06.15 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 36.31 100.00%
02.02.06.16 CURADO DE OBRAS DE CONCRETO m2 6.39 3.55 22.68 0.00% 22.68 100.00%
02.02.07 INSTALACION RED DE DISTRIBUCIN 205,311.43 0.00% 5,883.21 2.87% 80,766.57
02.02.07.01 TRAZO, NIVELACION Y REPLANTEO m 8,770.00 1.40 12,278.00 0.00% 5,883.21 47.92% 6,394.79
02.02.07.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 6,140.00 3.80 23,332.00 0.00% 0.00% 23,332.00
02.02.07.03 EXCAVACION DE ZANJA, TERRENO SEMI ROCOSO m 2,630.00 15.84 41,659.20 0.00% 0.00% 27,338.85
02.02.07.04 CAMA DE APOYO PARA TUBERIA m 8,770.00 3.22 28,239.40 0.00% 0.00% 23,700.93
02.02.07.05 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1/2" m 3,195.00 4.24 13,546.80 0.00% 0.00%
02.02.07.06 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 3/4" m 2,895.00 4.61 13,345.95 0.00% 0.00%
02.02.07.07 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1" m 1,565.00 6.03 9,436.95 0.00% 0.00%
02.02.07.08 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1 1/2" m 565.00 8.09 4,570.85 0.00% 0.00%
02.02.07.09 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 2" m 550.00 9.75 5,362.50 0.00% 0.00%
02.02.07.10 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 8,770.00 4.56 39,991.20 0.00% 0.00%
02.02.07.11 SUM. Y COLOC. ACCESORIOS RED DISTRIBUCION glb 1.00 656.68 656.68 0.00% 0.00%
02.02.07.12 PRUEBA HIDRAULICA+DESINFECCIN TUBERIA PVC m 8,770.00 1.47 12,891.90 0.00% 0.00%
02.02.08 CONSTRUCCION DE CAMARAS ROMPE PRESION TIPO 7 (11 UND.) 24,958.72 0.00% 0.00%
02.02.08.01 TRAZO Y REPLANTEO m2 16.94 5.35 90.63 0.00% 0.00%
02.02.08.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 13.55 28.51 386.31 0.00% 0.00%
02.02.08.03 ENCOFRADO Y DESENCOFRADO m2 89.76 40.90 3,671.18 0.00% 0.00%
02.02.08.04 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 8.65 379.34 3,281.29 0.00% 0.00%
02.02.08.05 ACERO F'y= 4200 KG/CM2, D=3/8" kg 533.58 3.64 1,942.23 0.00% 0.00%
02.02.08.06 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 80.52 14.12 1,136.94 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.02.08.07 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 31.68 16.78 531.59 0.00% 0.00%
02.02.08.08 DADOS DE CONCRETO P/DESAGUE und 11.00 36.31 399.41 0.00% 0.00%
02.02.08.09 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 80.52 8.12 653.82 0.00% 0.00%
02.02.08.10 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 11.00 178.59 1,964.49 0.00% 0.00%
02.02.08.11 SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA 2" + ACCES.-VENTILACION 1" und 11.00 135.42 1,489.62
0.00% 0.00%
02.02.08.12 SUM. Y COLOC. VALVULA 1"+ACCESORIOS - INGRESO und 2.00 193.21 386.42 0.00% 0.00%
02.02.08.13 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS - INGRESO und 7.00 137.68 963.76 0.00% 0.00%
02.02.08.14 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS - INGRESO und 2.00 128.74 257.48 0.00% 0.00%
02.02.08.15 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1" - CRP-7 und 2.00 80.87 161.74 0.00% 0.00%
02.02.08.16 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 3/4" - CRP-7 und 7.00 78.67 550.69 0.00% 0.00%
02.02.08.17 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1/2" - CRP-7 und 2.00 61.24 122.48 0.00% 0.00%
02.02.08.18 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 3.96 142.98 566.20 0.00% 0.00%
02.02.08.19 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 101.20 45.80 4,634.96 0.00% 0.00%
02.02.08.20 PUERTA DE CERCO PERITRICO und 11.00 124.47 1,369.17 0.00% 0.00%
02.02.08.21 CURADO DE OBRAS DE CONCRETO m2 112.20 3.55 398.31 0.00% 0.00%
02.02.09 VALVULAS DE CONTROL (8 UND.) 3,335.47 0.00% 0.00%
02.02.09.01 TRAZO Y REPLANTEO m2 9.60 5.35 51.36 0.00% 0.00%
02.02.09.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 5.76 28.51 164.22 0.00% 0.00%
02.02.09.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 16.00 39.00 624.00 0.00% 0.00%
02.02.09.04 CONCRETO F'C=175 KG/CM2 m3 0.80 320.46 256.37 0.00% 0.00%
02.02.09.05 GRAVA PARA CAJAS, MAX.1" m3 0.13 97.80 12.71 0.00% 0.00%
02.02.09.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 16.00 14.12 225.92 0.00% 0.00%
02.02.09.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 8.00 144.69 1,157.52 0.00% 0.00%
02.02.09.08 SUM. Y COLOC. VALVULA 2"+ACCESORIOS und 1.00 147.29 147.29 0.00% 0.00%
02.02.09.09 SUM. Y COLOC. VALVULA 1 1/2"+ACCESORIOS und 1.00 122.11 122.11 0.00% 0.00%
02.02.09.10 SUM. Y COLOC. VALVULA 1"+ACCESORIOS und 2.00 114.31 228.62 0.00% 0.00%
02.02.09.11 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 4.00 52.65 210.60 0.00% 0.00%
02.02.09.12 CURADO DE OBRAS DE CONCRETO m2 16.00 3.55 56.80 0.00% 0.00%
02.02.09.13 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 9.60 8.12 77.95 0.00% 0.00%
02.02.10 VALVULAS DE PURGA (02 UND.) 848.16 0.00% 0.00%
02.02.10.01 TRAZO Y REPLANTEO m2 2.40 5.35 12.84 0.00% 0.00%
02.02.10.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 1.44 28.51 41.05 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.02.10.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 4.00 39.00 156.00 0.00% 0.00%
02.02.10.04 CONCRETO F'C=175 KG/CM2 m3 0.20 320.46 64.09 0.00% 0.00%
02.02.10.05 GRAVA PARA CAJAS, MAX.1" m3 0.03 97.80 2.93 0.00% 0.00%
02.02.10.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 4.00 14.12 56.48 0.00% 0.00%
02.02.10.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 2.00 144.69 289.38 0.00% 0.00%
02.02.10.08 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 2.00 59.54 119.08 0.00% 0.00%
02.02.10.09 DADOS DE CONCRETO P/DESAGUE und 2.00 36.31 72.62 0.00% 0.00%
02.02.10.10 CURADO DE OBRAS DE CONCRETO m2 4.00 3.55 14.20 0.00% 0.00%
02.02.10.11 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 2.40 8.12 19.49 0.00% 0.00%
02.02.11 VALVULAS DE AIRE (02 UND.) 828.40 0.00% 0.00%
02.02.11.01 TRAZO Y REPLANTEO m2 2.40 5.35 12.84 0.00% 0.00%
02.02.11.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 1.44 28.51 41.05 0.00% 0.00%
02.02.11.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 4.00 39.00 156.00 0.00% 0.00%
02.02.11.04 CONCRETO F'C=175 KG/CM2 m3 0.20 320.46 64.09 0.00% 0.00%
02.02.11.05 GRAVA PARA CAJAS, MAX.1" m3 0.03 97.80 2.93 0.00% 0.00%
02.02.11.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 4.00 14.12 56.48 0.00% 0.00%
02.02.11.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 2.00 144.69 289.38 0.00% 0.00%
02.02.11.08 SUM. Y COLOC. VALVULA 2"+ACCESORIOS und 1.00 87.37 87.37 0.00% 0.00%
02.02.11.09 SUM. Y COLOC. VALVULA 1"+ACCESORIOS und 1.00 84.57 84.57 0.00% 0.00%
02.02.11.10 CURADO DE OBRAS DE CONCRETO m2 4.00 3.55 14.20 0.00% 0.00%
02.02.11.11 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 2.40 8.12 19.49 0.00% 0.00%
02.02.12 CONEXIN DOMICILIARIA DE AGUA Y LAVADERO (28 UND) 16,791.89 0.00% 0.00%
02.02.12.01 CAJA PREFABRICADA DE 0.40X0.40 e=0.10mt und 28.00 66.53 1,862.84 0.00% 0.00%
02.02.12.02 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS und 28.00 49.22 1,378.16 0.00% 0.00%
02.02.12.03 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% PG. m3 3.76 305.90 1,150.18 0.00% 0.00%
02.02.12.04 CONCRETO F'C=175 KG/CM2 m3 5.11 320.46 1,637.55 0.00% 0.00%
02.02.12.05 ENCOFRADO Y DESENCOFRADO m2 79.02 40.90 3,231.92 0.00% 0.00%
02.02.12.06 ACERO F'y= 4200 KG/CM2, D=1/4" kg 259.84 3.86 1,002.98 0.00% 0.00%
02.02.12.07 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 16.80 66.25 1,113.00 0.00% 0.00%
02.02.12.08 TARRAJEO MEZCLA 1:5 m2 136.78 14.12 1,931.33 0.00% 0.00%
02.02.12.09 ACCESORIOS DE SALIDA DE PILETA und 28.00 31.61 885.08 0.00% 0.00%
02.02.12.10 ACCESORIOS DE DESAGUE DE PILETA und 28.00 39.13 1,095.64 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.02.12.11 ACCESORIOS DE LLAVE DE PASO und 28.00 35.96 1,006.88 0.00% 0.00%
02.02.12.12 CURADO DE OBRAS DE CONCRETO m2 136.78 3.55 485.57 0.00% 0.00%
02.02.12.13 GRAVA PARA CAJAS, MAX.1" m3 0.11 97.80 10.76 0.00% 0.00%
02.03 SECTOR PIEDRA OQUE 46,386.06 0.00% 0.00%
02.03.01 CONSTRUCCION DE CAPTACION TIPO C1 (01 UND.) 4,487.14 0.00% 0.00%
02.03.01.01 LIMPIEZA MANUAL DE TERRENO m2 25.00 0.95 23.75 0.00% 0.00%
02.03.01.02 TRAZO Y REPLANTEO m2 5.30 5.35 28.36 0.00% 0.00%
02.03.01.03 EXCAVACION MANUAL m3 4.24 28.51 120.88 0.00% 0.00%
02.03.01.04 ELIMINACION MATERIAL EXCEDENTE m3 5.30 19.00 100.70 0.00% 0.00%
02.03.01.05 REFINE, NIVELACION Y COMPACTACION m2 5.30 2.23 11.82 0.00% 0.00%
02.03.01.06 ENCOFRADO Y DESENCOFRADO m2 18.60 40.90 760.74 0.00% 0.00%
02.03.01.07 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 2.46 379.34 933.18 0.00% 0.00%
02.03.01.08 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 0.00%
02.03.01.09 ACERO F'y= 4200 KG/CM2, D=3/8" kg 20.92 3.64 76.15 0.00% 0.00%
02.03.01.10 COLOCACION DE GRAVA 3/4" EN FILTRO m3 0.51 110.03 56.12 0.00% 0.00%
02.03.01.11 COLOCACION DE GRAVILLA 1/4" EN FILTRO m3 0.99 153.13 151.60 0.00% 0.00%
02.03.01.12 COLOCACION DE ARENA GRUESA EN FILTRO m3 1.42 188.25 267.32 0.00% 0.00%
02.03.01.13 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 11.64 14.12 164.36 0.00% 0.00%
02.03.01.14 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 7.02 16.78 117.80 0.00% 0.00%
02.03.01.15 PENDIENTE FONDO (MORTERO 1:5) m2 0.49 16.18 7.93 0.00% 0.00%
02.03.01.16 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 11.64 8.12 94.52 0.00% 0.00%
02.03.01.17 SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA 2" + ACCES.-VENTILACION und 1.00 135.42 135.42 0.00% 0.00%
02.03.01.18 SUM. Y COLOC. ACCESORIOS SALIDA TUBERIA DE SALIDA, 2" und 1.00 348.68 348.68 0.00% 0.00%
02.03.01.19 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00 144.69 144.69 0.00% 0.00%
02.03.01.20 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 0.00% 0.00%
02.03.01.21 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.46 142.98 65.77 0.00% 0.00%
02.03.01.22 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 10.30 45.80 471.74 0.00% 0.00%
02.03.01.23 PUERTA DE CERCO PERITRICO und 1.00 124.47 124.47 0.00% 0.00%
02.03.01.24 CURADO DE OBRAS DE CONCRETO m2 18.66 3.55 66.24 0.00% 0.00%
02.03.02 INSTALACION DE LINEA DE CONDUCCION 968.00 0.00% 0.00%
02.03.02.01 TRAZO, NIVELACION Y REPLANTEO m 40.00 1.40 56.00 0.00% 0.00%
02.03.02.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 40.00 3.80 152.00 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.03.02.03 CAMA DE APOYO PARA TUBERIA m 40.00 3.22 128.80 0.00% 0.00%
02.03.02.04 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 2" m 40.00 9.75 390.00 0.00% 0.00%
02.03.02.05 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 40.00 4.56 182.40 0.00% 0.00%
02.03.02.06 PRUEBA HIDRAULICA + DESINFECCION TUBERIA PVC m 40.00 1.47 58.80 0.00% 0.00%
02.03.03 CONST. RESERVORIO RECTANGULAR DE 1 M3 3,661.61 0.00% 0.00%
02.03.03.01 LIMPIEZA MANUAL DE TERRENO m2 3.61 0.95 3.43 0.00% 0.00%
02.03.03.02 TRAZO Y REPLANTEO m2 3.61 5.35 19.31 0.00% 0.00%
02.03.03.03 EXCAVACION MANUAL m3 1.44 28.51 41.05 0.00% 0.00%
02.03.03.04 REFINE, NIVELACION Y COMPACTACION m2 3.61 2.23 8.05 0.00% 0.00%
02.03.03.05 ELIMINACION MATERIAL EXCEDENTE m3 1.81 19.00 34.39 0.00% 0.00%
02.03.03.06 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 3.61 15.33 55.34 0.00% 0.00%
02.03.03.07 ENCOFRADO Y DESENCOFRADO MUROS (02 CARAS) m2 10.26 40.90 419.63 0.00% 0.00%
02.03.03.08 ENCOFRADO Y DESENCOFRADO DE LOSA m2 3.80 40.90 155.42 0.00% 0.00%
02.03.03.09 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 1.64 379.34 622.12 0.00% 0.00%
02.03.03.10 ACERO F'y= 4200 KG/CM2, D=3/8" kg 133.27 3.64 485.10 0.00% 0.00%
02.03.03.11 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 11.31 14.12 159.70 0.00% 0.00%
02.03.03.12 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 4.56 16.78 76.52 0.00% 0.00%
02.03.03.13 PENDIENTE FONDO (MORTERO 1:5) m2 1.44 16.18 23.30 0.00% 0.00%
02.03.03.14 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 11.31 8.12 91.84 0.00% 0.00%
02.03.03.15 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 0.00% 0.00%
02.03.03.16 ACCESORIOS TUBERIA DE VENTILACIN 2", JUNTA WATER STOP und 1.00 314.58 314.58 0.00% 0.00%
02.03.03.17 VEREDA DE CONCRETO DE E=4" m2 1.52 36.55 55.56 0.00% 0.00%
02.03.03.18 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.25 142.98 35.75 0.00% 0.00%
02.03.03.19 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 10.00 45.80 458.00 0.00% 0.00%
02.03.03.20 PUERTA DE CERCO PERITRICO und 1.00 124.47 124.47 0.00% 0.00%
02.03.03.21 ESCALERA PREFABRICADA DE TUBERIA DE FG 3/4" und 1.00 243.12 243.12 0.00% 0.00%
02.03.03.22 CURADO DE OBRAS DE CONCRETO m2 15.87 3.55 56.34 0.00% 0.00%
02.03.04 CASETA DE CLORACIN POR GOTEO 4,495.36 0.00% 0.00%
02.03.04.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 5.35 66.25 354.44 0.00% 0.00%
02.03.04.02 LISTONES DE MADERA 2"X2"X12 und 6.00 50.09 300.54 0.00% 0.00%
02.03.04.03 TARRAJEO DE MUROS INTERIORES Y EXTERIORES m2 10.70 14.12 151.08 0.00% 0.00%
PUERTA CONTRAPLACADA DE 1.50X0.70 (INCLUYE MARCO, CERRAJERA
02.03.04.04 und 1.00 318.53 318.53
PINTURA E INSTALACIN). 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.03.04.05 COLOCADO TEJA ANDINA ETERNIT m2 1.96 61.56 120.66 0.00% 0.00%
02.03.04.06 PINTURA EN MUROS EXTERIORES E INTERIORES m2 10.70 6.39 68.37 0.00% 0.00%
02.03.04.07 SUM. E INST. SISTEMA DE CLORACION X GOTEO GLB 1.00 3,181.74 3,181.74 0.00% 0.00%
02.03.05 CASETAS DE VALVULAS (01 UND.) 1,966.00 0.00% 0.00%
02.03.05.01 TRAZO Y REPLANTEO m2 1.88 5.35 10.06 0.00% 0.00%
02.03.05.02 EXCAVACION MANUAL m3 1.13 28.51 32.22 0.00% 0.00%
02.03.05.03 ELIMINACION MATERIAL EXCEDENTE m3 1.41 19.00 26.79 0.00% 0.00%
02.03.05.04 REFINE, NIVELACION Y COMPACTACION m2 1.88 2.23 4.19 0.00% 0.00%
02.03.05.05 ENCOFRADO Y DESENCOFRADO m2 6.55 40.90 267.90 0.00% 0.00%
02.03.05.06 CONCRETO F'C=210 KG/CM2 - LOSAS m3 0.72 366.61 263.96 0.00% 0.00%
02.03.05.07 ACERO F'y= 4200 KG/CM2, D=3/8" kg 7.48 3.64 27.23 0.00% 0.00%
02.03.05.08 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 6.39 14.12 90.23 0.00% 0.00%
02.03.05.09 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 4.14 8.12 33.62 0.00% 0.00%
02.03.05.10 SUM. Y COLOC. TAPA METALICA DE 0.80 x 0.80 und 1.00 210.71 210.71 0.00% 0.00%
02.03.05.11 SUM. Y COLOC. VALVULA 2"+ACCESORIOS-INGRESO R. 3M3 und 1.00 334.77 334.77 0.00% 0.00%
02.03.05.12 SUM. Y COLOC. VALVULA 11/2"+ACCESORIOS - SALIDA R. 3M3 und 1.00 288.67 288.67 0.00% 0.00%
02.03.05.13 SUM. Y COLOC. TUBERIA DE LIMPIEZA Y REBOSE 2" + ACCESORIOS und 1.00 310.79 310.79 0.00% 0.00%
02.03.05.14 GRAVA PARA CAJAS, MAX.1" m3 0.06 97.80 5.87 0.00% 0.00%
02.03.05.15 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 0.00%
02.03.05.16 CURADO DE OBRAS DE CONCRETO m2 6.39 3.55 22.68 0.00% 0.00%
02.03.06 INSTALACION RED DE DISTRIBUCIN 27,665.58 0.00% 0.00%
02.03.06.01 TRAZO, NIVELACION Y REPLANTEO m 1,100.00 1.40 1,540.00 0.00% 0.00%
02.03.06.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 770.00 3.80 2,926.00 0.00% 0.00%
02.03.06.03 EXCAVACION DE ZANJA, TERRENO SEMI ROCOSO m 330.00 15.84 5,227.20 0.00% 0.00%
02.03.06.04 CAMA DE APOYO PARA TUBERIA m 1,100.00 3.22 3,542.00 0.00% 0.00%
02.03.06.05 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1/2" m 325.00 4.24 1,378.00 0.00% 0.00%
02.03.06.06 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1" m 90.00 6.03 542.70 0.00% 0.00%
02.03.06.07 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1 1/2" m 685.00 8.09 5,541.65 0.00% 0.00%
02.03.06.08 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 1,100.00 4.56 5,016.00 0.00% 0.00%
02.03.06.09 SUM. Y COLOC. ACCESORIOS RED DISTRIBUCION glb 1.00 335.03 335.03 0.00% 0.00%
02.03.06.10 PRUEBA HIDRAULICA+DESINFECCIN TUBERIA PVC m 1,100.00 1.47 1,617.00 0.00% 0.00%
02.03.07 VALVULAS DE CONTROL (1 UND.) 450.84 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.03.07.01 TRAZO Y REPLANTEO m2 1.20 5.35 6.42 0.00% 0.00%
02.03.07.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 0.72 28.51 20.53 0.00% 0.00%
02.03.07.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 2.00 39.00 78.00 0.00% 0.00%
02.03.07.04 CONCRETO F'C=175 KG/CM2 m3 0.10 320.46 32.05 0.00% 0.00%
02.03.07.05 GRAVA PARA CAJAS, MAX.1" m3 0.02 97.80 1.96 0.00% 0.00%
02.03.07.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 2.00 14.12 28.24 0.00% 0.00%
02.03.07.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00 144.69 144.69 0.00% 0.00%
02.03.07.08 SUM. Y COLOC. VALVULA 1 1/2"+ACCESORIOS und 1.00 122.11 122.11 0.00% 0.00%
02.03.07.09 CURADO DE OBRAS DE CONCRETO m2 2.00 3.55 7.10 0.00% 0.00%
02.03.07.10 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 1.20 8.12 9.74 0.00% 0.00%
02.03.08 VALVULAS DE PURGA (01 UND.) 476.32 0.00% 0.00%
02.03.08.01 TRAZO Y REPLANTEO m2 1.20 5.35 6.42 0.00% 0.00%
02.03.08.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 0.72 28.51 20.53 0.00% 0.00%
02.03.08.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 2.00 39.00 78.00 0.00% 0.00%
02.03.08.04 CONCRETO F'C=175 KG/CM2 m3 0.10 320.46 32.05 0.00% 0.00%
02.03.08.05 GRAVA PARA CAJAS, MAX.1" m3 0.02 97.80 1.96 0.00% 0.00%
02.03.08.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 2.00 14.12 28.24 0.00% 0.00%
02.03.08.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00 144.69 144.69 0.00% 0.00%
02.03.08.08 SUM. Y COLOC. VALVULA 1 1/2"+ACCESORIOS und 1.00 111.28 111.28 0.00% 0.00%
02.03.08.09 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 0.00%
02.03.08.10 CURADO DE OBRAS DE CONCRETO m2 2.00 3.55 7.10 0.00% 0.00%
02.03.08.11 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 1.20 8.12 9.74 0.00% 0.00%
02.03.09 VALVULAS DE AIRE (01 UND.) 416.10 0.00% 0.00%
02.03.09.01 TRAZO Y REPLANTEO m2 1.20 5.35 6.42 0.00% 0.00%
02.03.09.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 0.72 28.51 20.53 0.00% 0.00%
02.03.09.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 2.00 39.00 78.00 0.00% 0.00%
02.03.09.04 CONCRETO F'C=175 KG/CM2 m3 0.10 320.46 32.05 0.00% 0.00%
02.03.09.05 GRAVA PARA CAJAS, MAX.1" m3 0.02 97.80 1.96 0.00% 0.00%
02.03.09.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 2.00 14.12 28.24 0.00% 0.00%
02.03.09.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00 144.69 144.69 0.00% 0.00%
02.03.09.08 SUM. Y COLOC. VALVULA 1 1/2"+ACCESORIOS und 1.00 87.37 87.37 0.00% 0.00%
02.03.09.09 CURADO DE OBRAS DE CONCRETO m2 2.00 3.55 7.10 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.03.09.10 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 1.20 8.12 9.74 0.00% 0.00%
02.03.10 CONEXIN DOMICILIARIA DE AGUA Y LAVADERO (3 UND) 1,799.11 0.00% 0.00%
02.03.10.01 CAJA PREFABRICADA DE 0.40X0.40 e=0.10mt und 3.00 66.53 199.59 0.00% 0.00%
02.03.10.02 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS und 3.00 49.22 147.66 0.00% 0.00%
02.03.10.03 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% PG. m3 0.40 305.90 122.36 0.00% 0.00%
02.03.10.04 CONCRETO F'C=175 KG/CM2 m3 0.55 320.46 176.25 0.00% 0.00%
02.03.10.05 ENCOFRADO Y DESENCOFRADO m2 8.47 40.90 346.42 0.00% 0.00%
02.03.10.06 ACERO F'y= 4200 KG/CM2, D=1/4" kg 27.84 3.86 107.46 0.00% 0.00%
02.03.10.07 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 1.80 66.25 119.25 0.00% 0.00%
02.03.10.08 TARRAJEO MEZCLA 1:5 m2 14.66 14.12 207.00 0.00% 0.00%
02.03.10.09 ACCESORIOS DE SALIDA DE PILETA und 3.00 31.61 94.83 0.00% 0.00%
02.03.10.10 ACCESORIOS DE DESAGUE DE PILETA und 3.00 39.13 117.39 0.00% 0.00%
02.03.10.11 ACCESORIOS DE LLAVE DE PASO und 3.00 35.96 107.88 0.00% 0.00%
02.03.10.12 CURADO DE OBRAS DE CONCRETO m2 14.66 3.55 52.04 0.00% 0.00%
02.03.10.13 GRAVA PARA CAJAS, MAX.1" m3 0.01 97.80 0.98 0.00% 0.00%
02.04 SECTOR TRANCA GRANDE 44,780.85 0.00% 0.00%
02.04.01 CONSTRUCCION DE CAPTACION TIPO C1 (01 UND.) 4,487.14 0.00% 0.00%
02.04.01.01 LIMPIEZA MANUAL DE TERRENO m2 25.00 0.95 23.75 0.00% 0.00%
02.04.01.02 TRAZO Y REPLANTEO m2 5.30 5.35 28.36 0.00% 0.00%
02.04.01.03 EXCAVACION MANUAL m3 4.24 28.51 120.88 0.00% 0.00%
02.04.01.04 ELIMINACION MATERIAL EXCEDENTE m3 5.30 19.00 100.70 0.00% 0.00%
02.04.01.05 REFINE, NIVELACION Y COMPACTACION m2 5.30 2.23 11.82 0.00% 0.00%
02.04.01.06 ENCOFRADO Y DESENCOFRADO m2 18.60 40.90 760.74 0.00% 0.00%
02.04.01.07 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 2.46 379.34 933.18 0.00% 0.00%
02.04.01.08 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 0.00%
02.04.01.09 ACERO F'y= 4200 KG/CM2, D=3/8" kg 20.92 3.64 76.15 0.00% 0.00%
02.04.01.10 COLOCACION DE GRAVA 3/4" EN FILTRO m3 0.51 110.03 56.12 0.00% 0.00%
02.04.01.11 COLOCACION DE GRAVILLA 1/4" EN FILTRO m3 0.99 153.13 151.60 0.00% 0.00%
02.04.01.12 COLOCACION DE ARENA GRUESA EN FILTRO m3 1.42 188.25 267.32 0.00% 0.00%
02.04.01.13 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 11.64 14.12 164.36 0.00% 0.00%
02.04.01.14 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 7.02 16.78 117.80 0.00% 0.00%
02.04.01.15 PENDIENTE FONDO (MORTERO 1:5) m2 0.49 16.18 7.93 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.04.01.16 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 11.64 8.12 94.52 0.00% 0.00%
02.04.01.17 SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA 2" + ACCES.-VENTILACION und 1.00 135.42 135.42 0.00% 0.00%
02.04.01.18 SUM. Y COLOC. ACCESORIOS SALIDA TUBERIA DE SALIDA, 2" und 1.00 348.68 348.68 0.00% 0.00%
02.04.01.19 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00 144.69 144.69 0.00% 0.00%
02.04.01.20 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 0.00% 0.00%
02.04.01.21 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.46 142.98 65.77 0.00% 0.00%
02.04.01.22 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 10.30 45.80 471.74 0.00% 0.00%
02.04.01.23 PUERTA DE CERCO PERITRICO und 1.00 124.47 124.47 0.00% 0.00%
02.04.01.24 CURADO DE OBRAS DE CONCRETO m2 18.66 3.55 66.24 0.00% 0.00%
02.04.02 INSTALACION DE LINEA DE CONDUCCION 847.00 0.00% 0.00%
02.04.02.01 TRAZO, NIVELACION Y REPLANTEO m 35.00 1.40 49.00 0.00% 0.00%
02.04.02.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 35.00 3.80 133.00 0.00% 0.00%
02.04.02.03 CAMA DE APOYO PARA TUBERIA m 35.00 3.22 112.70 0.00% 0.00%
02.04.02.04 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 2" m 35.00 9.75 341.25 0.00% 0.00%
02.04.02.05 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 35.00 4.56 159.60 0.00% 0.00%
02.04.02.06 PRUEBA HIDRAULICA + DESINFECCION TUBERIA PVC m 35.00 1.47 51.45 0.00% 0.00%
02.04.03 CONST. RESERVORIO RECTANGULAR DE 1 M3 3,661.61 0.00% 0.00%
02.04.03.01 LIMPIEZA MANUAL DE TERRENO m2 3.61 0.95 3.43 0.00% 0.00%
02.04.03.02 TRAZO Y REPLANTEO m2 3.61 5.35 19.31 0.00% 0.00%
02.04.03.03 EXCAVACION MANUAL m3 1.44 28.51 41.05 0.00% 0.00%
02.04.03.04 REFINE, NIVELACION Y COMPACTACION m2 3.61 2.23 8.05 0.00% 0.00%
02.04.03.05 ELIMINACION MATERIAL EXCEDENTE m3 1.81 19.00 34.39 0.00% 0.00%
02.04.03.06 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 3.61 15.33 55.34 0.00% 0.00%
02.04.03.07 ENCOFRADO Y DESENCOFRADO MUROS (02 CARAS) m2 10.26 40.90 419.63 0.00% 0.00%
02.04.03.08 ENCOFRADO Y DESENCOFRADO DE LOSA m2 3.80 40.90 155.42 0.00% 0.00%
02.04.03.09 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 1.64 379.34 622.12 0.00% 0.00%
02.04.03.10 ACERO F'y= 4200 KG/CM2, D=3/8" kg 133.27 3.64 485.10 0.00% 0.00%
02.04.03.11 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 11.31 14.12 159.70 0.00% 0.00%
02.04.03.12 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 4.56 16.78 76.52 0.00% 0.00%
02.04.03.13 PENDIENTE FONDO (MORTERO 1:5) m2 1.44 16.18 23.30 0.00% 0.00%
02.04.03.14 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 11.31 8.12 91.84 0.00% 0.00%
02.04.03.15 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.04.03.16 ACCESORIOS TUBERIA DE VENTILACIN 2", JUNTA WATER STOP und 1.00 314.58 314.58 0.00% 0.00%
02.04.03.17 VEREDA DE CONCRETO DE E=4" m2 1.52 36.55 55.56 0.00% 0.00%
02.04.03.18 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.25 142.98 35.75 0.00% 0.00%
02.04.03.19 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 10.00 45.80 458.00 0.00% 0.00%
02.04.03.20 PUERTA DE CERCO PERITRICO und 1.00 124.47 124.47 0.00% 0.00%
02.04.03.21 ESCALERA PREFABRICADA DE TUBERIA DE FG 3/4" und 1.00 243.12 243.12 0.00% 0.00%
02.04.03.22 CURADO DE OBRAS DE CONCRETO m2 15.87 3.55 56.34 0.00% 0.00%
02.04.04 CASETA DE CLORACIN POR GOTEO 4,665.36 0.00% 0.00%
02.04.04.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 5.35 66.25 354.44 0.00% 0.00%
02.04.04.02 LISTONES DE MADERA 2"X2"X12 und 6.00 50.09 300.54 0.00% 0.00%
02.04.04.03 TARRAJEO DE MUROS INTERIORES Y EXTERIORES m2 10.70 14.12 151.08 0.00% 0.00%
PUERTA CONTRAPLACADA DE 2.00X0.90 (INCLUYE MARCO, CERRAJERA
02.04.04.04 und 1.00 318.53 318.53 0.00% 0.00%
PINTURA E INSTALACIN).
02.04.04.05 COLOCADO TEJA ANDINA ETERNIT m2 1.96 61.56 120.66 0.00% 0.00%
02.04.04.06 PINTURA EN MUROS EXTERIORES E INTERIORES m2 10.70 6.39 68.37 0.00% 0.00%
02.04.04.07 SUM. E INST. SISTEMA DE CLORACION X GOTEO GLB 1.00 3,351.74 3,351.74 0.00% 0.00%
02.04.05 CASETAS DE VALVULAS (01 UND.) 1,902.84 0.00% 0.00%
02.04.05.01 TRAZO Y REPLANTEO m2 1.88 5.35 10.06 0.00% 0.00%
02.04.05.02 EXCAVACION MANUAL m3 1.13 28.51 32.22 0.00% 0.00%
02.04.05.03 ELIMINACION MATERIAL EXCEDENTE m3 1.41 19.00 26.79 0.00% 0.00%
02.04.05.04 REFINE, NIVELACION Y COMPACTACION m2 1.88 2.23 4.19 0.00% 0.00%
02.04.05.05 ENCOFRADO Y DESENCOFRADO m2 6.55 40.90 267.90 0.00% 0.00%
02.04.05.06 CONCRETO F'C=210 KG/CM2 - LOSAS m3 0.72 366.61 263.96 0.00% 0.00%
02.04.05.07 ACERO F'y= 4200 KG/CM2, D=3/8" kg 7.48 3.64 27.23 0.00% 0.00%
02.04.05.08 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 6.39 14.12 90.23 0.00% 0.00%
02.04.05.09 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 4.14 8.12 33.62 0.00% 0.00%
02.04.05.10 SUM. Y COLOC. TAPA METALICA DE 0.80 x 0.80 und 1.00 210.71 210.71 0.00% 0.00%
02.04.05.11 SUM. Y COLOC. VALVULA 2"+ACCESORIOS-INGRESO R. 5M3 und 1.00 334.77 334.77 0.00% 0.00%
02.04.05.12 SUM. Y COLOC. VALVULA 1"+ACCESORIOS-SALIDA R. 5 M3 und 1.00 225.51 225.51 0.00% 0.00%
02.04.05.13 SUM. Y COLOC. TUBERIA DE LIMPIEZA Y REBOSE 2" + ACCESORIOS und 1.00 310.79 310.79 0.00% 0.00%
02.04.05.14 GRAVA PARA CAJAS, MAX.1" m3 0.06 97.80 5.87 0.00% 0.00%
02.04.05.15 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 0.00%
02.04.05.16 CURADO DE OBRAS DE CONCRETO m2 6.39 3.55 22.68 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.04.06 INSTALACION RED DE DISTRIBUCIN 21,170.92 0.00% 0.00%
02.04.06.01 TRAZO, NIVELACION Y REPLANTEO m 915.00 1.40 1,281.00 0.00% 0.00%
02.04.06.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 640.00 3.80 2,432.00 0.00% 0.00%
02.04.06.03 EXCAVACION DE ZANJA, TERRENO SEMI ROCOSO m 275.00 15.84 4,356.00 0.00% 0.00%
02.04.06.04 CAMA DE APOYO PARA TUBERIA m 915.00 3.22 2,946.30 0.00% 0.00%
02.04.06.05 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1/2" m 375.00 4.24 1,590.00 0.00% 0.00%
02.04.06.06 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 3/4" m 405.00 4.61 1,867.05 0.00% 0.00%
02.04.06.07 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1" m 135.00 6.03 814.05 0.00% 0.00%
02.04.06.08 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 915.00 4.56 4,172.40 0.00% 0.00%
02.04.06.09 SUM. Y COLOC. ACCESORIOS RED DE DISTRIBUCIN GLB 1.00 367.07 367.07 0.00% 0.00%
02.04.06.10 PRUEBA HIDRAULICA+DESINFECCIN TUBERIA PVC m 915.00 1.47 1,345.05 0.00% 0.00%
02.04.07 VALVULAS DE CONTROL (4 UND.) 1,523.54 0.00% 0.00%
02.04.07.01 TRAZO Y REPLANTEO m2 4.80 5.35 25.68 0.00% 0.00%
02.04.07.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 2.88 28.51 82.11 0.00% 0.00%
02.04.07.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 8.00 39.00 312.00 0.00% 0.00%
02.04.07.04 CONCRETO F'C=175 KG/CM2 m3 0.40 320.46 128.18 0.00% 0.00%
02.04.07.05 GRAVA PARA CAJAS, MAX.1" m3 0.06 97.80 5.87 0.00% 0.00%
02.04.07.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 8.00 14.12 112.96 0.00% 0.00%
02.04.07.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 4.00 144.69 578.76 0.00% 0.00%
02.04.07.08 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 4.00 52.65 210.60 0.00% 0.00%
02.04.07.09 CURADO DE OBRAS DE CONCRETO m2 8.00 3.55 28.40 0.00% 0.00%
02.04.07.10 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 4.80 8.12 38.98 0.00% 0.00%
02.04.08 VALVULAS DE PURGA (03 UND.) 1,314.78 0.00% 0.00%
02.04.08.01 TRAZO Y REPLANTEO m2 3.60 5.35 19.26 0.00% 0.00%
02.04.08.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 2.16 28.51 61.58 0.00% 0.00%
02.04.08.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 6.00 39.00 234.00 0.00% 0.00%
02.04.08.04 CONCRETO F'C=175 KG/CM2 m3 0.30 320.46 96.14 0.00% 0.00%
02.04.08.05 GRAVA PARA CAJAS, MAX.1" m3 0.05 97.80 4.89 0.00% 0.00%
02.04.08.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 6.00 14.12 84.72 0.00% 0.00%
02.04.08.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 3.00 144.69 434.07 0.00% 0.00%
02.04.08.08 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 2.00 59.54 119.08 0.00% 0.00%
02.04.08.09 SUM. Y COLOC. VALVULA 1"+ACCESORIOS und 1.00 101.58 101.58 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.04.08.10 DADOS DE CONCRETO P/DESAGUE und 3.00 36.31 108.93 0.00% 0.00%
02.04.08.11 CURADO DE OBRAS DE CONCRETO m2 6.00 3.55 21.30 0.00% 0.00%
02.04.08.12 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 3.60 8.12 29.23 0.00% 0.00%
02.04.09 VALVULAS DE AIRE (01 UND.) 408.26 0.00% 0.00%
02.04.09.01 TRAZO Y REPLANTEO m2 1.20 5.35 6.42 0.00% 0.00%
02.04.09.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 0.72 28.51 20.53 0.00% 0.00%
02.04.09.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 2.00 39.00 78.00 0.00% 0.00%
02.04.09.04 CONCRETO F'C=175 KG/CM2 m3 0.10 320.46 32.05 0.00% 0.00%
02.04.09.05 GRAVA PARA CAJAS, MAX.1" m3 0.02 97.80 1.96 0.00% 0.00%
02.04.09.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 2.00 14.12 28.24 0.00% 0.00%
02.04.09.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00 144.69 144.69 0.00% 0.00%
02.04.09.08 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 1.00 79.53 79.53 0.00% 0.00%
02.04.09.09 CURADO DE OBRAS DE CONCRETO m2 2.00 3.55 7.10 0.00% 0.00%
02.04.09.10 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 1.20 8.12 9.74 0.00% 0.00%
02.04.10 CONEXIN DOMICILIARIA DE AGUA Y LAVADERO (8 UND) 4,799.40 0.00% 0.00%
02.04.10.01 CAJA PREFABRICADA DE 0.40X0.40 e=0.10mt und 8.00 66.53 532.24 0.00% 0.00%
02.04.10.02 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS und 8.00 49.22 393.76 0.00% 0.00%
02.04.10.03 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% PG. m3 1.08 305.90 330.37 0.00% 0.00%
02.04.10.04 CONCRETO F'C=175 KG/CM2 m3 1.46 320.46 467.87 0.00% 0.00%
02.04.10.05 ENCOFRADO Y DESENCOFRADO m2 22.58 40.90 923.52 0.00% 0.00%
02.04.10.06 ACERO F'y= 4200 KG/CM2, D=1/4" kg 74.24 3.86 286.57 0.00% 0.00%
02.04.10.07 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 4.80 66.25 318.00 0.00% 0.00%
02.04.10.08 TARRAJEO MEZCLA 1:5 m2 39.08 14.12 551.81 0.00% 0.00%
02.04.10.09 ACCESORIOS DE SALIDA DE PILETA und 8.00 31.61 252.88 0.00% 0.00%
02.04.10.10 ACCESORIOS DE DESAGUE DE PILETA und 8.00 39.13 313.04 0.00% 0.00%
02.04.10.11 ACCESORIOS DE LLAVE DE PASO und 8.00 35.96 287.68 0.00% 0.00%
02.04.10.12 CURADO DE OBRAS DE CONCRETO m2 39.08 3.55 138.73 0.00% 0.00%
02.04.10.13 GRAVA PARA CAJAS, MAX.1" m3 0.03 97.80 2.93 0.00% 0.00%
02.05 SECTOR CONGA 46,415.29 0.00% 0.00%
02.05.01 CONSTRUCCION DE CAPTACION TIPO C1 (01 UND.) 4,487.14 0.00% 0.00%
02.05.01.01 LIMPIEZA MANUAL DE TERRENO m2 25.00 0.95 23.75 0.00% 0.00%
02.05.01.02 TRAZO Y REPLANTEO m2 5.30 5.35 28.36 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.05.01.03 EXCAVACION MANUAL m3 4.24 28.51 120.88 0.00% 0.00%
02.05.01.04 ELIMINACION MATERIAL EXCEDENTE m3 5.30 19.00 100.70 0.00% 0.00%
02.05.01.05 REFINE, NIVELACION Y COMPACTACION m2 5.30 2.23 11.82 0.00% 0.00%
02.05.01.06 ENCOFRADO Y DESENCOFRADO m2 18.60 40.90 760.74 0.00% 0.00%
02.05.01.07 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 2.46 379.34 933.18 0.00% 0.00%
02.05.01.08 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 0.00%
02.05.01.09 ACERO F'y= 4200 KG/CM2, D=3/8" kg 20.92 3.64 76.15 0.00% 0.00%
02.05.01.10 COLOCACION DE GRAVA 3/4" EN FILTRO m3 0.51 110.03 56.12 0.00% 0.00%
02.05.01.11 COLOCACION DE GRAVILLA 1/4" EN FILTRO m3 0.99 153.13 151.60 0.00% 0.00%
02.05.01.12 COLOCACION DE ARENA GRUESA EN FILTRO m3 1.42 188.25 267.32 0.00% 0.00%
02.05.01.13 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 11.64 14.12 164.36 0.00% 0.00%
02.05.01.14 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 7.02 16.78 117.80 0.00% 0.00%
02.05.01.15 PENDIENTE FONDO (MORTERO 1:5) m2 0.49 16.18 7.93 0.00% 0.00%
02.05.01.16 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 11.64 8.12 94.52 0.00% 0.00%
02.05.01.17 SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA 2" + ACCES.-VENTILACION und 1.00 135.42 135.42 0.00% 0.00%
02.05.01.18 SUM. Y COLOC. ACCESORIOS SALIDA TUBERIA DE SALIDA, 2" und 1.00 348.68 348.68 0.00% 0.00%
02.05.01.19 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00 144.69 144.69 0.00% 0.00%
02.05.01.20 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 0.00% 0.00%
02.05.01.21 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.46 142.98 65.77 0.00% 0.00%
02.05.01.22 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 10.30 45.80 471.74 0.00% 0.00%
02.05.01.23 PUERTA DE CERCO PERITRICO und 1.00 124.47 124.47 0.00% 0.00%
02.05.01.24 CURADO DE OBRAS DE CONCRETO m2 18.66 3.55 66.24 0.00% 0.00%
02.05.02 INSTALACION DE LINEA DE CONDUCCION 484.00 0.00% 0.00%
02.05.02.01 TRAZO, NIVELACION Y REPLANTEO m 20.00 1.40 28.00 0.00% 0.00%
02.05.02.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 20.00 3.80 76.00 0.00% 0.00%
02.05.02.03 CAMA DE APOYO PARA TUBERIA m 20.00 3.22 64.40 0.00% 0.00%
02.05.02.04 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 2" m 20.00 9.75 195.00 0.00% 0.00%
02.05.02.05 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 20.00 4.56 91.20 0.00% 0.00%
02.05.02.06 PRUEBA HIDRAULICA + DESINFECCION TUBERIA PVC m 20.00 1.47 29.40 0.00% 0.00%
02.05.03 CONST. RESERVORIO RETANGULAR DE 1 M3 3,661.61 0.00% 0.00%
02.05.03.01 LIMPIEZA MANUAL DE TERRENO m2 3.61 0.95 3.43 0.00% 0.00%
02.05.03.02 TRAZO Y REPLANTEO m2 3.61 5.35 19.31 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.05.03.03 EXCAVACION MANUAL m3 1.44 28.51 41.05 0.00% 0.00%
02.05.03.04 REFINE, NIVELACION Y COMPACTACION m2 3.61 2.23 8.05 0.00% 0.00%
02.05.03.05 ELIMINACION MATERIAL EXCEDENTE m3 1.81 19.00 34.39 0.00% 0.00%
02.05.03.06 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 3.61 15.33 55.34 0.00% 0.00%
02.05.03.07 ENCOFRADO Y DESENCOFRADO MUROS (02 CARAS) m2 10.26 40.90 419.63 0.00% 0.00%
02.05.03.08 ENCOFRADO Y DESENCOFRADO DE LOSA m2 3.80 40.90 155.42 0.00% 0.00%
02.05.03.09 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 1.64 379.34 622.12 0.00% 0.00%
02.05.03.10 ACERO F'y= 4200 KG/CM2, D=3/8" kg 133.27 3.64 485.10 0.00% 0.00%
02.05.03.11 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 11.31 14.12 159.70 0.00% 0.00%
02.05.03.12 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 4.56 16.78 76.52 0.00% 0.00%
02.05.03.13 PENDIENTE FONDO (MORTERO 1:5) m2 1.44 16.18 23.30 0.00% 0.00%
02.05.03.14 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 11.31 8.12 91.84 0.00% 0.00%
02.05.03.15 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 0.00% 0.00%
02.05.03.16 ACCESORIOS TUBERIA DE VENTILACIN 2", JUNTA WATER STOP und 1.00 314.58 314.58 0.00% 0.00%
02.05.03.17 VEREDA DE CONCRETO DE E=4" m2 1.52 36.55 55.56 0.00% 0.00%
02.05.03.18 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.25 142.98 35.75 0.00% 0.00%
02.05.03.19 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 10.00 45.80 458.00 0.00% 0.00%
02.05.03.20 PUERTA DE CERCO PERITRICO und 1.00 124.47 124.47 0.00% 0.00%
02.05.03.21 ESCALERA PREFABRICADA DE TUBERIA DE FG 3/4" und 1.00 243.12 243.12 0.00% 0.00%
02.05.03.22 CURADO DE OBRAS DE CONCRETO m2 15.87 3.55 56.34 0.00% 0.00%
02.05.04 CASETA DE CLORACIN POR GOTEO 5,215.36 0.00% 0.00%
02.05.04.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 5.35 66.25 354.44 0.00% 0.00%
02.05.04.02 LISTONES DE MADERA 2"X2"X12 und 6.00 50.09 300.54 0.00% 0.00%
02.05.04.03 TARRAJEO DE MUROS INTERIORES Y EXTERIORES m2 10.70 14.12 151.08 0.00% 0.00%
PUERTA CONTRAPLACADA DE 1.50X0.70 (INCLUYE MARCO, CERRAJERA
02.05.04.04 und 1.00 318.53 318.53
PINTURA E INSTALACIN). 0.00% 0.00%
02.05.04.05 COLOCADO TEJA ANDINA ETERNIT m2 1.96 61.56 120.66 0.00% 0.00%
02.05.04.06 PINTURA EN MUROS EXTERIORES E INTERIORES m2 10.70 6.39 68.37 0.00% 0.00%
02.05.04.07 SUM. E INST. SISTEMA DE CLORACION X GOTEO GLB 1.00 3,901.74 3,901.74 0.00% 0.00%
02.05.05 CASETAS DE VALVULAS (01 UND.) 1,902.84 0.00% 0.00%
02.05.05.01 TRAZO Y REPLANTEO m2 1.88 5.35 10.06 0.00% 0.00%
02.05.05.02 EXCAVACION MANUAL m3 1.13 28.51 32.22 0.00% 0.00%
02.05.05.03 ELIMINACION MATERIAL EXCEDENTE m3 1.41 19.00 26.79 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.05.05.04 REFINE, NIVELACION Y COMPACTACION m2 1.88 2.23 4.19 0.00% 0.00%
02.05.05.05 ENCOFRADO Y DESENCOFRADO m2 6.55 40.90 267.90 0.00% 0.00%
02.05.05.06 CONCRETO F'C=210 KG/CM2 - LOSAS m3 0.72 366.61 263.96 0.00% 0.00%
02.05.05.07 ACERO F'y= 4200 KG/CM2, D=3/8" kg 7.48 3.64 27.23 0.00% 0.00%
02.05.05.08 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 6.39 14.12 90.23 0.00% 0.00%
02.05.05.09 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 4.14 8.12 33.62 0.00% 0.00%
02.05.05.10 SUM. Y COLOC. TAPA METALICA DE 0.80 x 0.80 und 1.00 210.71 210.71 0.00% 0.00%
02.05.05.11 SUM. Y COLOC. VALVULA 2"+ACCESORIOS-INGRESO R. 5M3 und 1.00 334.77 334.77 0.00% 0.00%
02.05.05.12 SUM. Y COLOC. VALVULA 1"+ACCESORIOS-SALIDA R. 5 M3 und 1.00 225.51 225.51 0.00% 0.00%
02.05.05.13 SUM. Y COLOC. TUBERIA DE LIMPIEZA Y REBOSE 2" + ACCESORIOS und 1.00 310.79 310.79 0.00% 0.00%
02.05.05.14 GRAVA PARA CAJAS, MAX.1" m3 0.06 97.80 5.87 0.00% 0.00%
02.05.05.15 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 0.00%
02.05.05.16 CURADO DE OBRAS DE CONCRETO m2 6.39 3.55 22.68 0.00% 0.00%
02.05.06 INSTALACION RED DE DISTRIBUCIN 23,822.26 0.00% 0.00%
02.05.06.01 TRAZO, NIVELACION Y REPLANTEO m 1,025.00 1.40 1,435.00 0.00% 0.00%
02.05.06.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 720.00 3.80 2,736.00 0.00% 0.00%
02.05.06.03 EXCAVACION DE ZANJA, TERRENO SEMI ROCOSO m 305.00 15.84 4,831.20 0.00% 0.00%
02.05.06.04 CAMA DE APOYO PARA TUBERIA m 1,025.00 3.22 3,300.50 0.00% 0.00%
02.05.06.05 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1/2" m 460.00 4.24 1,950.40 0.00% 0.00%
02.05.06.06 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 3/4" m 275.00 4.61 1,267.75 0.00% 0.00%
02.05.06.07 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1" m 290.00 6.03 1,748.70 0.00% 0.00%
02.05.06.08 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 1,025.00 4.56 4,674.00 0.00% 0.00%
02.05.06.09 SUM. Y COLOC. ACCESORIOS RED DISTRIBUCION glb 1.00 371.96 371.96 0.00% 0.00%
02.05.06.10 PRUEBA HIDRAULICA+DESINFECCIN TUBERIA PVC m 1,025.00 1.47 1,506.75 0.00% 0.00%
02.05.07 VALVULAS DE CONTROL (3 UND.) 1,204.80 0.00% 0.00%
02.05.07.01 TRAZO Y REPLANTEO m2 3.60 5.35 19.26 0.00% 0.00%
02.05.07.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 2.16 28.51 61.58 0.00% 0.00%
02.05.07.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 6.00 39.00 234.00 0.00% 0.00%
02.05.07.04 CONCRETO F'C=175 KG/CM2 m3 0.30 320.46 96.14 0.00% 0.00%
02.05.07.05 GRAVA PARA CAJAS, MAX.1" m3 0.05 97.80 4.89 0.00% 0.00%
02.05.07.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 6.00 14.12 84.72 0.00% 0.00%
02.05.07.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 3.00 144.69 434.07 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.05.07.08 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 2.00 52.65 105.30 0.00% 0.00%
02.05.07.09 SUM. Y COLOC. VALVULA 1"+ACCESORIOS und 1.00 114.31 114.31 0.00% 0.00%
02.05.07.10 CURADO DE OBRAS DE CONCRETO m2 6.00 3.55 21.30 0.00% 0.00%
02.05.07.11 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 3.60 8.12 29.23 0.00% 0.00%
02.05.08 VALVULAS DE PURGA (01 UND.) 424.58 0.00% 0.00%
02.05.08.01 TRAZO Y REPLANTEO m2 1.20 5.35 6.42 0.00% 0.00%
02.05.08.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 0.72 28.51 20.53 0.00% 0.00%
02.05.08.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 2.00 39.00 78.00 0.00% 0.00%
02.05.08.04 CONCRETO F'C=175 KG/CM2 m3 0.10 320.46 32.05 0.00% 0.00%
02.05.08.05 GRAVA PARA CAJAS, MAX.1" m3 0.02 97.80 1.96 0.00% 0.00%
02.05.08.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 2.00 14.12 28.24 0.00% 0.00%
02.05.08.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00 144.69 144.69 0.00% 0.00%
02.05.08.08 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 1.00 59.54 59.54 0.00% 0.00%
02.05.08.09 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 0.00%
02.05.08.10 CURADO DE OBRAS DE CONCRETO m2 2.00 3.55 7.10 0.00% 0.00%
02.05.08.11 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 1.20 8.12 9.74 0.00% 0.00%
02.05.09 VALVULAS DE AIRE (01 UND.) 413.30 0.00% 0.00%
02.05.09.01 TRAZO Y REPLANTEO m2 1.20 5.35 6.42 0.00% 0.00%
02.05.09.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 0.72 28.51 20.53 0.00% 0.00%
02.05.09.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 2.00 39.00 78.00 0.00% 0.00%
02.05.09.04 CONCRETO F'C=175 KG/CM2 m3 0.10 320.46 32.05 0.00% 0.00%
02.05.09.05 GRAVA PARA CAJAS, MAX.1" m3 0.02 97.80 1.96 0.00% 0.00%
02.05.09.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 2.00 14.12 28.24 0.00% 0.00%
02.05.09.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00 144.69 144.69 0.00% 0.00%
02.05.09.08 SUM. Y COLOC. VALVULA 1"+ACCESORIOS und 1.00 84.57 84.57 0.00% 0.00%
02.05.09.09 CURADO DE OBRAS DE CONCRETO m2 2.00 3.55 7.10 0.00% 0.00%
02.05.09.10 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 1.20 8.12 9.74 0.00% 0.00%
02.05.10 CONEXIN DOMICILIARIA DE AGUA Y LAVADERO (8 UND) 4,799.40 0.00% 0.00%
02.05.10.01 CAJA PREFABRICADA DE 0.40X0.40 e=0.10mt und 8.00 66.53 532.24 0.00% 0.00%
02.05.10.02 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS und 8.00 49.22 393.76 0.00% 0.00%
02.05.10.03 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% PG. m3 1.08 305.90 330.37 0.00% 0.00%
02.05.10.04 CONCRETO F'C=175 KG/CM2 m3 1.46 320.46 467.87 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.05.10.05 ENCOFRADO Y DESENCOFRADO m2 22.58 40.90 923.52 0.00% 0.00%
02.05.10.06 ACERO F'y= 4200 KG/CM2, D=1/4" kg 74.24 3.86 286.57 0.00% 0.00%
02.05.10.07 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 4.80 66.25 318.00 0.00% 0.00%
02.05.10.08 TARRAJEO MEZCLA 1:5 m2 39.08 14.12 551.81 0.00% 0.00%
02.05.10.09 ACCESORIOS DE SALIDA DE PILETA und 8.00 31.61 252.88 0.00% 0.00%
02.05.10.10 ACCESORIOS DE DESAGUE DE PILETA und 8.00 39.13 313.04 0.00% 0.00%
02.05.10.11 ACCESORIOS DE LLAVE DE PASO und 8.00 35.96 287.68 0.00% 0.00%
02.05.10.12 CURADO DE OBRAS DE CONCRETO m2 39.08 3.55 138.73 0.00% 0.00%
02.05.10.13 GRAVA PARA CAJAS, MAX.1" m3 0.03 97.80 2.93 0.00% 0.00%
02.06 SECTOR LAS LAGUNAS 76,692.38 0.00% 0.00%
02.06.01 CONSTRUCCION DE CAPTACION TIPO C1 (02 UND.) 8,840.35 0.00% 0.00%
02.06.01.01 LIMPIEZA MANUAL DE TERRENO m2 50.00 0.95 47.50 0.00% 0.00%
02.06.01.02 TRAZO Y REPLANTEO m2 10.60 5.35 56.71 0.00% 0.00%
02.06.01.03 EXCAVACION MANUAL m3 8.48 28.51 241.76 0.00% 0.00%
02.06.01.04 ELIMINACION MATERIAL EXCEDENTE m3 10.60 19.00 201.40 0.00% 0.00%
02.06.01.05 REFINE, NIVELACION Y COMPACTACION m2 10.60 2.23 23.64 0.00% 0.00%
02.06.01.06 ENCOFRADO Y DESENCOFRADO m2 37.19 40.90 1,521.07 0.00% 0.00%
02.06.01.07 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 4.91 379.34 1,862.56 0.00% 0.00%
02.06.01.08 DADOS DE CONCRETO P/DESAGUE und 2.00 36.31 72.62 0.00% 0.00%
02.06.01.09 ACERO F'y= 4200 KG/CM2, D=3/8" kg 41.84 3.64 152.30 0.00% 0.00%
02.06.01.10 COLOCACION DE GRAVA 3/4" EN FILTRO m3 1.02 110.03 112.23 0.00% 0.00%
02.06.01.11 COLOCACION DE GRAVILLA 1/4" EN FILTRO m3 1.98 153.13 303.20 0.00% 0.00%
02.06.01.12 COLOCACION DE ARENA GRUESA EN FILTRO m3 2.84 188.25 534.63 0.00% 0.00%
02.06.01.13 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 23.28 14.12 328.71 0.00% 0.00%
02.06.01.14 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 14.04 16.78 235.59 0.00% 0.00%
02.06.01.15 PENDIENTE FONDO (MORTERO 1:5) m2 0.98 16.18 15.86 0.00% 0.00%
02.06.01.16 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 23.28 8.12 189.03 0.00% 0.00%
02.06.01.17 SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA 2" + ACCES.-VENTILACION und 2.00 135.42 270.84 0.00% 0.00%
02.06.01.18 SUM. Y COLOC. ACCESORIOS SALIDA TUBERIA DE SALIDA, 2" und 2.00 348.68 697.36 0.00% 0.00%
02.06.01.19 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 2.00 144.69 289.38 0.00% 0.00%
02.06.01.20 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 2.00 178.59 357.18 0.00% 0.00%
02.06.01.21 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.91 142.98 130.11 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.06.01.22 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 17.80 45.80 815.24 0.00% 0.00%
02.06.01.23 PUERTA DE CERCO PERITRICO und 2.00 124.47 248.94 0.00% 0.00%
02.06.01.24 CURADO DE OBRAS DE CONCRETO m2 37.32 3.55 132.49 0.00% 0.00%
02.06.02 INSTALACION DE LINEA DE CONDUCCION 3,388.00 0.00% 0.00%
02.06.02.01 TRAZO, NIVELACION Y REPLANTEO m 140.00 1.40 196.00 0.00% 0.00%
02.06.02.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 140.00 3.80 532.00 0.00% 0.00%
02.06.02.03 CAMA DE APOYO PARA TUBERIA m 140.00 3.22 450.80 0.00% 0.00%
02.06.02.04 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 2" m 140.00 9.75 1,365.00 0.00% 0.00%
02.06.02.05 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 140.00 4.56 638.40 0.00% 0.00%
02.06.02.06 PRUEBA HIDRAULICA + DESINFECCION TUBERIA PVC m 140.00 1.47 205.80 0.00% 0.00%
02.06.03 CONST. RESERVORIO RECTANGULAR DE 2 M3 4,581.55 0.00% 0.00%
02.06.03.01 LIMPIEZA MANUAL DE TERRENO m2 4.41 0.95 4.19 0.00% 0.00%
02.06.03.02 TRAZO Y REPLANTEO m2 4.41 5.35 23.59 0.00% 0.00%
02.06.03.03 EXCAVACION MANUAL m3 1.76 28.51 50.18 0.00% 0.00%
02.06.03.04 REFINE, NIVELACION Y COMPACTACION m2 4.41 2.23 9.83 0.00% 0.00%
02.06.03.05 ELIMINACION MATERIAL EXCEDENTE m3 2.21 19.00 41.99 0.00% 0.00%
02.06.03.06 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 4.41 15.33 67.61 0.00% 0.00%
02.06.03.07 ENCOFRADO Y DESENCOFRADO MUROS (02 CARAS) m2 16.74 40.90 684.67 0.00% 0.00%
02.06.03.08 ENCOFRADO Y DESENCOFRADO DE LOSA m2 4.56 40.90 186.50 0.00% 0.00%
02.06.03.09 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 2.33 379.34 883.86 0.00% 0.00%
02.06.03.10 ACERO F'y= 4200 KG/CM2, D=3/8" kg 159.36 3.64 580.07 0.00% 0.00%
02.06.03.11 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 15.83 14.12 223.52 0.00% 0.00%
02.06.03.12 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 7.56 16.78 126.86 0.00% 0.00%
02.06.03.13 PENDIENTE FONDO (MORTERO 1:5) m2 1.96 16.18 31.71 0.00% 0.00%
02.06.03.14 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 15.83 8.12 128.54 0.00% 0.00%
02.06.03.15 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 0.00% 0.00%
02.06.03.16 ACCESORIOS TUBERIA DE VENTILACIN 2", JUNTA WATER STOP und 1.00 314.58 314.58 0.00% 0.00%
02.06.03.17 VEREDA DE CONCRETO DE E=4" m2 1.68 36.55 61.40 0.00% 0.00%
02.06.03.18 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.27 142.98 38.60 0.00% 0.00%
02.06.03.19 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 10.80 45.80 494.64 0.00% 0.00%
02.06.03.20 PUERTA DE CERCO PERITRICO und 1.00 124.47 124.47 0.00% 0.00%
02.06.03.21 ESCALERA PREFABRICADA DE TUBERIA DE FG 3/4" und 1.00 243.12 243.12 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.06.03.22 CURADO DE OBRAS DE CONCRETO m2 23.39 3.55 83.03 0.00% 0.00%
02.06.04 CASETA DE CLORACIN POR GOTEO 5,690.65 0.00% 0.00%
02.06.04.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 8.78 66.25 581.68 0.00% 0.00%
02.06.04.02 LISTONES DE MADERA 2"X2"X12 und 7.00 50.09 350.63 0.00% 0.00%
02.06.04.03 TARRAJEO DE MUROS INTERIORES Y EXTERIORES m2 17.56 14.12 247.95 0.00% 0.00%
PUERTA CONTRAPLACADA DE 2.00X0.90 (INCLUYE MARCO, CERRAJERA
02.06.04.04 und 1.00 318.53 318.53
PINTURA E INSTALACIN). 0.00% 0.00%
02.06.04.05 COLOCADO TEJA ANDINA ETERNIT m2 2.89 61.56 177.91 0.00% 0.00%
02.06.04.06 PINTURA EN MUROS EXTERIORES E INTERIORES m2 17.56 6.39 112.21 0.00% 0.00%
02.06.04.07 SUM. E INST. SISTEMA DE CLORACION X GOTEO GLB 1.00 3,901.74 3,901.74 0.00% 0.00%
02.06.05 CASETAS DE VALVULAS (01 UND.) 1,902.84 0.00% 0.00%
02.06.05.01 TRAZO Y REPLANTEO m2 1.88 5.35 10.06 0.00% 0.00%
02.06.05.02 EXCAVACION MANUAL m3 1.13 28.51 32.22 0.00% 0.00%
02.06.05.03 ELIMINACION MATERIAL EXCEDENTE m3 1.41 19.00 26.79 0.00% 0.00%
02.06.05.04 REFINE, NIVELACION Y COMPACTACION m2 1.88 2.23 4.19 0.00% 0.00%
02.06.05.05 ENCOFRADO Y DESENCOFRADO m2 6.55 40.90 267.90 0.00% 0.00%
02.06.05.06 CONCRETO F'C=210 KG/CM2 - LOSAS m3 0.72 366.61 263.96 0.00% 0.00%
02.06.05.07 ACERO F'y= 4200 KG/CM2, D=3/8" kg 7.48 3.64 27.23 0.00% 0.00%
02.06.05.08 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 6.39 14.12 90.23 0.00% 0.00%
02.06.05.09 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 4.14 8.12 33.62 0.00% 0.00%
02.06.05.10 SUM. Y COLOC. TAPA METALICA DE 0.80 x 0.80 und 1.00 210.71 210.71 0.00% 0.00%
02.06.05.11 SUM. Y COLOC. VALVULA 2"+ACCESORIOS-INGRESO R. 5M3 und 1.00 334.77 334.77 0.00% 0.00%
02.06.05.12 SUM. Y COLOC. VALVULA 1"+ACCESORIOS-SALIDA R. 5 M3 und 1.00 225.51 225.51 0.00% 0.00%
02.06.05.13 SUM. Y COLOC. TUBERIA DE LIMPIEZA Y REBOSE 2" + ACCESORIOS und 1.00 310.79 310.79 0.00% 0.00%
02.06.05.14 GRAVA PARA CAJAS, MAX.1" m3 0.06 97.80 5.87 0.00% 0.00%
02.06.05.15 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 0.00%
02.06.05.16 CURADO DE OBRAS DE CONCRETO m2 6.39 3.55 22.68 0.00% 0.00%
02.06.06 INSTALACION RED DE DISTRIBUCIN 37,258.65 0.00% 0.00%
02.06.06.01 TRAZO, NIVELACION Y REPLANTEO m 1,610.00 1.40 2,254.00 0.00% 0.00%
02.06.06.02 EXCAVACION MANUAL DE ZANJAS, H=0.60 M. m 1,125.00 3.80 4,275.00 0.00% 0.00%
02.06.06.03 EXCAVACION DE ZANJA, TERRENO SEMI ROCOSO m 485.00 15.84 7,682.40 0.00% 0.00%
02.06.06.04 CAMA DE APOYO PARA TUBERIA m 1,610.00 3.22 5,184.20 0.00% 0.00%
02.06.06.05 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1/2" m 690.00 4.24 2,925.60 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.06.06.06 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 3/4" m 530.00 4.61 2,443.30 0.00% 0.00%
02.06.06.07 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1" m 390.00 6.03 2,351.70 0.00% 0.00%
02.06.06.08 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 1,610.00 4.56 7,341.60 0.00% 0.00%
02.06.06.09 SUM. Y COLOC. ACCESORIOS RED DISTRIBUCION glb 1.00 434.15 434.15 0.00% 0.00%
02.06.06.10 PRUEBA HIDRAULICA+DESINFECCIN TUBERIA PVC m 1,610.00 1.47 2,366.70 0.00% 0.00%
02.06.07 CONSTRUCCION DE CAMARAS ROMPE PRESION TIPO 7 (1 UND.) 2,566.50 0.00% 0.00%
02.06.07.01 TRAZO Y REPLANTEO m2 1.54 5.35 8.24 0.00% 0.00%
02.06.07.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 1.23 28.51 35.07 0.00% 0.00%
02.06.07.03 ENCOFRADO Y DESENCOFRADO m2 8.16 40.90 333.74 0.00% 0.00%
02.06.07.04 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 0.79 379.34 299.68 0.00% 0.00%
02.06.07.05 ACERO F'y= 4200 KG/CM2, D=3/8" kg 48.51 3.64 176.58 0.00% 0.00%
02.06.07.06 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 7.32 14.12 103.36 0.00% 0.00%
02.06.07.07 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 2.88 16.78 48.33 0.00% 0.00%
02.06.07.08 DADOS DE CONCRETO P/DESAGUE und 1.00 36.31 36.31 0.00% 0.00%
02.06.07.09 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 7.32 8.12 59.44 0.00% 0.00%
02.06.07.10 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00 178.59 178.59 0.00% 0.00%
02.06.07.11 SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA 2" + ACCES.-VENTILACION 1" und 1.00 135.42 135.42 0.00% 0.00%
02.06.07.12 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS - INGRESO und 1.00 137.68 137.68 0.00% 0.00%
02.06.07.13 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 3/4" - CRP-7 und 1.00 78.67 78.67 0.00% 0.00%
02.06.07.14 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 1.19 142.98 170.15 0.00% 0.00%
02.06.07.15 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 13.20 45.80 604.56 0.00% 0.00%
02.06.07.16 PUERTA DE CERCO PERITRICO und 1.00 124.47 124.47 0.00% 0.00%
02.06.07.17 CURADO DE OBRAS DE CONCRETO m2 10.20 3.55 36.21 0.00% 0.00%
02.06.08 VALVULAS DE CONTROL (3 UND.) 1,204.80 0.00% 0.00%
02.06.08.01 TRAZO Y REPLANTEO m2 3.60 5.35 19.26 0.00% 0.00%
02.06.08.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 2.16 28.51 61.58 0.00% 0.00%
02.06.08.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 6.00 39.00 234.00 0.00% 0.00%
02.06.08.04 CONCRETO F'C=175 KG/CM2 m3 0.30 320.46 96.14 0.00% 0.00%
02.06.08.05 GRAVA PARA CAJAS, MAX.1" m3 0.05 97.80 4.89 0.00% 0.00%
02.06.08.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 6.00 14.12 84.72 0.00% 0.00%
02.06.08.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 3.00 144.69 434.07 0.00% 0.00%
02.06.08.08 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 2.00 52.65 105.30 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.06.08.09 SUM. Y COLOC. VALVULA 1"+ACCESORIOS und 1.00 114.31 114.31 0.00% 0.00%
02.06.08.10 CURADO DE OBRAS DE CONCRETO m2 6.00 3.55 21.30 0.00% 0.00%
02.06.08.11 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 3.60 8.12 29.23 0.00% 0.00%
02.06.09 VALVULAS DE PURGA (02 UND.) 848.16 0.00% 0.00%
02.06.09.01 TRAZO Y REPLANTEO m2 2.40 5.35 12.84 0.00% 0.00%
02.06.09.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 1.44 28.51 41.05 0.00% 0.00%
02.06.09.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 4.00 39.00 156.00 0.00% 0.00%
02.06.09.04 CONCRETO F'C=175 KG/CM2 m3 0.20 320.46 64.09 0.00% 0.00%
02.06.09.05 GRAVA PARA CAJAS, MAX.1" m3 0.03 97.80 2.93 0.00% 0.00%
02.06.09.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 4.00 14.12 56.48 0.00% 0.00%
02.06.09.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 2.00 144.69 289.38 0.00% 0.00%
02.06.09.08 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 2.00 59.54 119.08 0.00% 0.00%
02.06.09.09 DADOS DE CONCRETO P/DESAGUE und 2.00 36.31 72.62 0.00% 0.00%
02.06.09.10 CURADO DE OBRAS DE CONCRETO m2 4.00 3.55 14.20 0.00% 0.00%
02.06.09.11 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 2.40 8.12 19.49 0.00% 0.00%
02.06.10 VALVULAS DE AIRE (02 UND.) 815.52 0.00% 0.00%
02.06.10.01 TRAZO Y REPLANTEO m2 2.40 5.35 12.84 0.00% 0.00%
02.06.10.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 1.44 28.51 41.05 0.00% 0.00%
02.06.10.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 4.00 39.00 156.00 0.00% 0.00%
02.06.10.04 CONCRETO F'C=175 KG/CM2 m3 0.20 320.46 64.09 0.00% 0.00%
02.06.10.05 GRAVA PARA CAJAS, MAX.1" m3 0.03 97.80 2.93 0.00% 0.00%
02.06.10.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 4.00 14.12 56.48 0.00% 0.00%
02.06.10.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 2.00 144.69 289.38 0.00% 0.00%
02.06.10.08 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 2.00 79.53 159.06 0.00% 0.00%
02.06.10.09 CURADO DE OBRAS DE CONCRETO m2 4.00 3.55 14.20 0.00% 0.00%
02.06.10.10 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 2.40 8.12 19.49 0.00% 0.00%
02.06.11 CONEXIN DOMICILIARIA DE AGUA Y LAVADERO (16 UND) 9,595.36 0.00% 0.00%
02.06.11.01 CAJA PREFABRICADA DE 0.40X0.40 e=0.10mt und 16.00 66.53 1,064.48 0.00% 0.00%
02.06.11.02 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS und 16.00 49.22 787.52 0.00% 0.00%
02.06.11.03 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% PG. m3 2.15 305.90 657.69 0.00% 0.00%
02.06.11.04 CONCRETO F'C=175 KG/CM2 m3 2.92 320.46 935.74 0.00% 0.00%
02.06.11.05 ENCOFRADO Y DESENCOFRADO m2 45.15 40.90 1,846.64 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
02.06.11.06 ACERO F'y= 4200 KG/CM2, D=1/4" kg 148.48 3.86 573.13 0.00% 0.00%
02.06.11.07 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 9.60 66.25 636.00 0.00% 0.00%
02.06.11.08 TARRAJEO MEZCLA 1:5 m2 78.16 14.12 1,103.62 0.00% 0.00%
02.06.11.09 ACCESORIOS DE SALIDA DE PILETA und 16.00 31.61 505.76 0.00% 0.00%
02.06.11.10 ACCESORIOS DE DESAGUE DE PILETA und 16.00 39.13 626.08 0.00% 0.00%
02.06.11.11 ACCESORIOS DE LLAVE DE PASO und 16.00 35.96 575.36 0.00% 0.00%
02.06.11.12 CURADO DE OBRAS DE CONCRETO m2 78.16 3.55 277.47 0.00% 0.00%
02.06.11.13 GRAVA PARA CAJAS, MAX.1" m3 0.06 97.80 5.87 0.00% 0.00%
03 LETRINA SANITARIA CON ARRASTRE HIDRAULICO C/ BIODIGESTOR (129 UND) 971,080.76 0.00% 0.00%
03.01 LETRINA SANITARIA COMPLETA 667,044.34 0.00% 0.00%
03.01.01 LIMPIEZA MANUAL DE TERRENO MODULO SANEAMIENTO m2 804.96 0.95 764.71 0.00% 0.00%
03.01.02 TRAZO Y REPLANTEO MODULO SANEAMIENTO m2 804.96 1.05 845.21 0.00% 0.00%
03.01.03 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 215.69 28.51 6,149.32 0.00% 0.00%
03.01.04 NIVELACION Y COMPACTACION DE BASE MANUAL m2 804.96 2.23 1,795.06 0.00% 0.00%
03.01.05 ELIMINACION MATERIAL EXCEDENTE m3 215.69 19.00 4,098.11 0.00% 0.00%
03.01.06 AFIRMADO DE 4" PARA PISOS m2 945.25 19.56 18,489.09 0.00% 0.00%
03.01.07 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% PG. m3 164.86 305.90 50,430.67 0.00% 0.00%
03.01.08 SOBRECIMIENTO MEZCLA C:H=1:8 + 25% P.M. m3 70.82 252.21 17,861.51 0.00% 0.00%
03.01.09 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO m2 530.19 40.90 21,684.77 0.00% 0.00%
03.01.10 CONCRETO F'C =140 KG/CM2 EN PISOS PULIDO Y COLOREADO H=0.10 m2 356.04 25.16 8,957.97 0.00% 0.00%
03.01.11 CONCRETO F'C =140 KG/CM2 EN VEREDA PULIDO H=0.10 m2 301.86 24.67 7,446.89 0.00% 0.00%
03.01.12 ENCOFRADO Y DESENCOFRADO PARA VERREDAS m2 85.14 40.90 3,482.23 0.00% 0.00%
03.01.13 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 26.47 379.34 10,041.13 0.00% 0.00%
03.01.14 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 352.94 40.90 14,435.25 0.00% 0.00%
03.01.15 ACERO F'y= 4200 KG/CM2, D=1/4" - COLUMNAS kg 1,664.10 3.86 6,423.43 0.00% 0.00%
03.01.16 ACERO F'y= 4200 KG/CM2, D=3/8" - COLUMNAS kg 3,547.86 3.64 12,914.21 0.00% 0.00%
03.01.17 CONCRETO F'C= 210 KG/CM2 EN VIGAS m3 24.21 379.34 9,183.82 0.00% 0.00%
03.01.18 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS m2 161.38 40.90 6,600.44 0.00% 0.00%
03.01.19 ACERO F'y= 4200 KG/CM2, D=1/4" - VIGAS kg 1,199.70 3.86 4,630.84 0.00% 0.00%
03.01.20 ACERO F'y= 4200 KG/CM2, D=3/8" - VIGAS kg 2,653.68 3.64 9,659.40 0.00% 0.00%
03.01.21 CORREAS DE MADERA 1"X1.5"X11 und 903.00 12.00 10,836.00 0.00% 0.00%
03.01.22 VIGUETAS DE MADERA DE 2"X3"X11" und 387.00 32.32 12,507.84 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
03.01.23 COLOCADO TEJA ANDINA ETERNIT m2 1,100.11 61.56 67,722.77 0.00% 0.00%
03.01.24 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 1,593.15 66.25 105,546.19 0.00% 0.00%
03.01.25 TARRAJEO DE MUROS INTERIORES m2 786.90 14.12 11,111.03 0.00% 0.00%
03.01.26 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 176.47 14.12 2,491.76 0.00% 0.00%
03.01.27 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 161.38 14.12 2,278.69 0.00% 0.00%
03.01.28 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m 1,012.65 21.73 22,004.88 0.00% 0.00%
PUERTA CONTRAPLACADA DE 2.00X0.75 (INCLUYE MARCO, CERRAJERA PINTURA und
03.01.29 129.00 197.50 25,477.50
E INSTALACIN). 0.00% 0.00%
VENTANAS DE MADERA DE 0.40X0.75M (INCLUYE MARCO, CERRAJERA PINTURA und
03.01.30 129.00 109.76 14,159.04
E INSTALACIN). 0.00% 0.00%
03.01.31 VIDRIO SEMIDOBLE. PROVISION Y COLOCACION p2 499.88 7.06 3,529.15 0.00% 0.00%
03.01.32 PINTURA EN MUROS EXTERIORES - LADRILLO CARAVISTA m2 1,593.15 6.39 10,180.23 0.00% 0.00%
03.01.33 PINTURA LATEX EN MUROS INTERIORES m2 786.90 6.49 5,106.98 0.00% 0.00%
03.01.34 PINTURA LATEX EN COLUMNAS m2 176.47 6.39 1,127.64 0.00% 0.00%
03.01.35 PINTURA LATEX EN VIGAS m2 161.38 6.39 1,031.22 0.00% 0.00%
03.01.36 SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR SIMPLE pto 129.00 81.03 10,452.87 0.00% 0.00%
03.01.37 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 387.00 31.80 12,306.60 0.00% 0.00%
03.01.38 INODORO TANQUE BAJO BLANCO pza 129.00 130.87 16,882.23 0.00% 0.00%
03.01.39 LAVATORIO DE PARED BLANCO 1 LLAVE pza 129.00 113.92 14,695.68 0.00% 0.00%
03.01.40 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS und 129.00 87.32 11,264.28 0.00% 0.00%
03.01.41 SALIDA DE PVC SAL PARA DESAGUE DE 2" pto 387.00 45.36 17,554.32 0.00% 0.00%
03.01.42 SALIDA DE PVC SAL PARA DESAGUE DE 4" pto 129.00 60.10 7,752.90 0.00% 0.00%
03.01.43 SUMIDERO DE BRONCE 2" P/DUCHA und 129.00 35.01 4,516.29 0.00% 0.00%
03.01.44 SALIDAS DE PVC SAL PARA VENTILACION DE 2" pto 129.00 85.93 11,084.97 0.00% 0.00%
03.01.45 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC SAL DE 2" A 4" und 129.00 26.15 3,373.35 0.00% 0.00%
03.01.46 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, 1/2" m 1,935.00 4.24 8,204.40 0.00% 0.00%
03.01.47 SUM. Y COLOC. DE TUBERIA PVC SAL 2" m 1,806.00 4.12 7,440.72 0.00% 0.00%
03.01.48 SUM. Y COLOC. DE TUBERIA PVC SAL 4" m 645.00 17.27 11,139.15 0.00% 0.00%
03.01.49 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 129.00 99.98 12,897.42 0.00% 0.00%
03.01.50 REGISTROS DE BRONCE DE 4" pza 129.00 40.89 5,274.81 0.00% 0.00%
03.01.51 CURADO DE OBRAS DE CONCRETO m2 337.85 3.55 1,199.37 0.00% 0.00%
03.02 BIODIGESTOR AUTOLIMPIABLE PARA SANEAMIENTO 304,036.42 0.00% 0.00%
03.02.01 LIMPIEZA MANUAL DE TERRENO BIODIGESTOR m2 171.23 0.95 162.67 0.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
03.02.02 TRAZO Y REPLANTEO BIODIGESTOR m2 171.23 1.05 179.79 0.00% 0.00%
03.02.03 EXCAVACION MANUAL EN TERRENO NATURAL m3 627.53 28.51 17,890.88 0.00% 0.00%
03.02.04 CAMA DE APOYO PARA TUBERIA m 3,375.00 3.22 10,867.50 0.00% 0.00%
03.02.05 RELLENO CON MATERIAL PROPIO m3 253.59 15.23 3,862.18 0.00% 0.00%
03.02.06 RELLENO DE ZANJAS DE INFILTRACIN CON GRAVA DE 1/2" A 2" m3 619.20 86.35 53,467.92 0.00% 0.00%
03.02.07 CAPA PROTECTORA DE PLASTICO m2 1,238.40 3.21 3,975.26 0.00% 0.00%
03.02.08 ELIMINACION MATERIAL EXCEDENTE A 50M m3 373.95 19.00 7,105.05 0.00% 0.00%
03.02.09 NIVELACION Y COMPACTACION DE FONDO m2 788.19 2.23 1,757.66 0.00% 0.00%
03.02.10 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 16.64 245.17 4,079.63 0.00% 0.00%
03.02.11 SUMINISTRO Y COLOCACIN DE BIODIGESTOR 600 LT + ACCESORIOS pza 129.00 1,016.35 131,109.15 0.00% 0.00%
03.02.12 CAJA DE REGISTRO DE LODOS und 129.00 127.37 16,430.73 0.00% 0.00%
03.02.13 CAJA DE DISTRIBUCION 12" X 24" pza 129.00 105.68 13,632.72 0.00% 0.00%
03.02.14 CAJA DE TRAMPA DE NATAS Y SOLIDOS 12"X24" pza 129.00 128.81 16,616.49 0.00% 0.00%
03.02.15 SUM. Y COLOC. DE TUBERIA PVC SAL 2" m 774.00 4.12 3,188.88 0.00% 0.00%
03.02.16 SUM. Y COLOC. DE TUBERIA PVC SAL 4" m 387.00 17.27 6,683.49 0.00% 0.00%
03.02.17 SUM. Y COLOC. DE TUBERIA PERFORADA PVC SAL 2" m 2,322.00 5.61 13,026.42 0.00% 0.00%
04 MITIGACIN DEL IMPACTO AMBIENTAL 11,941.51 8,752.72 73.30% 0.00%
04.01 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y LIQUIDOS 1,768.06 0.00% 0.00%
04.01.01 IMPLEMENTACION DE CILINDROS PROVISIONALES PARA ALMACENAR RESIDUOS und 2.00 367.50 735.00 0.00% 0.00%
04.01.02 CONSTRUCCION DE MICRORELLENO 3.00MX3.00MX1.50M und 1.00 522.45 522.45 0.00% 0.00%
04.01.03 MATERIALES PARA CHARLAS DE MANEJO DE RESIDUOS und 1.00 510.61 510.61 0.00% 0.00%
04.02 PROGRAMA DE MITIGACIN AMBIENTAL 7,675.37 7,072.72 92.15% 0.00%
04.02.01 CONSTRUCCION DE BAOS TEMPORALES (UBS DE HOYO SECO) und 1.00 609.71 609.71 609.71 100.00% 0.00%
04.02.02 TRASLADO DE RESIDUOS SOLIDOS und 1.00 2.65 2.65 0.00% 0.00%
04.02.03 HUMEDECIMIENTO DE TERRENO Y AGREGADOS PARA EVITAR GENERAR POLVO m 25,880.00 0.23 5,952.40 5,952.40 100.00% 0.00%
04.02.04 REPOSICION DE COBERTURA VEGETAL GLB 1.00 600.00 600.00 0.00% 0.00%
04.02.05 MATERIALES PARA CHARLA DE INTRODUCCION AL MEDIO AMBIENTE und 1.00 510.61 510.61 510.61 100.00% 0.00%
04.03 PROGRAMA DE MONITOREO AMBIENTAL 1,500.00 1,500.00 100.00% 0.00%
04.03.01 MONITOREO DEL AGUA und 2.00 750.00 1,500.00 1,500.00 100.00% 0.00%
04.04 PROGRAMA DE CONTINGENCIA 180.00 180.00 100.00% 0.00%
04.04.01 EQUIPO DE PRIMEROS AUXILIOS (BOTIQUIN) und 1.00 100.00 100.00 100.00 100.00% 0.00%
04.04.02 EQUIPO CONTRA INCENDIO (EXTINTORES 12 KG) und 1.00 80.00 80.00 80.00 100.00% 0.00%
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
CRONOGRAMA VALOR
MARZO ABRIL MAYO
P.UNIT. PARCIAL
ITEM DESCRIPCIN UND. CANTIDAD DEL 09 AL 31 DEL 01 AL 30 DEL 01 AL 31
S/. S/.
Parcial % Parcial % Parcial
04.05 CIERRE DE LA EJECUCION DE OBRA 818.08 0.00% 0.00%
04.05.01 ELIMINACION DE RESIDUOS EN GENERAL GLB 1.00 607.45 607.45 0.00% 0.00%
04.05.02 CLAUSURA DE LETRINA PROVISIONALES und 1.00 209.68 209.68 0.00% 0.00%
04.05.03 CLAUSURA DE MICRORELLENO und 1.00 0.95 0.95 0.00% 0.00%
05 SEGURIDAD Y SALUD 9,632.25 9,632.24 100.00% 0.00%
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y GLB
05.01 SALUD EN EL TRABAJO 1.00 632.57 632.57 632.57
100.00% 0.00%
05.02 EQUIPOS DE PROTECCION PERSONAL (EPP) GLB 1.00 2,658.20 2,658.20 2,658.20 100.00% 0.00%
05.03 SEALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 5,371.48 5,371.48 5,371.48 100.00% 0.00%
05.04 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN OBR GLB 1.00 970.00 970.00 970.00 100.00% 0.00%
06 EDUCACIN SANITARIA 25,910.00 0.00% 0.00%
06.01 EDUCACION SANITARIA GLB 1.00 25,910.00 25,910.00 0.00% 0.00%
07 CAPACITACION DE LA JASS 25,200.00 0.00% 0.00%
07.01 CAPACITACION DE LA JASS GLB 1.00 25,200.00 25,200.00 0.00% 0.00%
08 PLAN DE MONITOREO ARQUEOLGICO 48,000.00 9,150.00 19.06% 12,000.00 25.00% 12,400.00
08.01 MONITOREO ARQUEOLGICO GLB 1.00 48,000.00 48,000.00 9,150.00 19.06% 12,000.00 25.00% 12,400.00
09 FLETE 222,000.00 16,927.50 7.63% 22,200.00 10.00% 22,940.00
09.01 FLETE TERRESTRE GLB 1.00 152,000.00 152,000.00 11,590.00 7.63% 15,200.00 10.00% 15,706.67
09.02 FLETE RURAL GLB 1.00 70,000.00 70,000.00 5,337.50 7.63% 7,000.00 10.00% 7,233.33
COSTO DIRECTO (CD) S/. 2,211,861.65 190,654.07 213,159.88 214,545.42
GASTOS GENERALES (FIJOS Y VARIABLES) (GG) 10.00% S/. 221,186.16 19065.41 21315.99 21454.54
UTILIDAD (UTI) 5.00% S/. 110,593.08 9532.70 10657.99 10727.27
SUB TOTAL (ST) S/. 2,543,640.89 219,252.18 245,133.86 246,727.23
IMPUESTO GENERAL A LAS VENTAS (IGV) 18.00% S/. 457,855.36 39465.39 44124.09 44410.9
COSTO DE OBRA S/. 3,001,496.25 258,717.57 289,257.95 291,138.13
PORCENTAJE 9.00% 10.00%
Son: Tres millones un mil cuatrocientos noventa y seis con 25/100 Nuevos Soles.
AMPLIACIN
PROYECTO: Y MEJORAMIENTO DEL SERVICIO
AMPLIACIN
DE AGUA
Y MEJORAMIENTO
POTABLE Y LETRINAS
DEL SERVICIO
SANITARIAS
DE AGUA
EN ELPOTABLE
CASERIOYDE
LETRINAS
ANEXO CHILO
SANIT
Cliente: MUNICIPALIDAD DISTRITAL DE HUALGAYOC
Lugar: HUALGAYOC
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00
02 SISTEMAS DE AGUA POTABLE
02.01 SECTOR PIRATA CHILN
02.01.01 DEMOLICIONES
02.01.01.01 DEMOLICION DE ESTRUCTURAS DE CONCRETO (CAPTACIN) m3 2.46
02.01.02 CONSTRUCCION DE CAPTACION TIPO C1 (01 UND.)
02.01.02.01 LIMPIEZA MANUAL DE TERRENO m2 25.00
02.01.02.02 TRAZO Y REPLANTEO m2 5.30
02.01.02.03 EXCAVACION MANUAL m3 4.24
02.01.02.04 ELIMINACION MATERIAL EXCEDENTE m3 5.30
02.01.02.05 REFINE, NIVELACION Y COMPACTACION m2 5.30
02.01.02.06 ENCOFRADO Y DESENCOFRADO m2 18.60
02.01.02.07 CONCRETO F'C=210 KG/CM2 - MUROS Y LOSAS m3 2.46
02.01.02.08 DADOS DE CONCRETO P/DESAGUE und 1.00
02.01.02.09 ACERO F'y= 4200 KG/CM2, D=3/8" kg 20.92
02.01.02.10 COLOCACION DE GRAVA 3" EN FILTRO m3 0.51
02.01.02.11 COLOCACION DE GRAVILLA 1" EN FILTRO m3 0.99
02.01.02.12 COLOCACION DE ARENA GRUESA EN FILTRO m3 1.42
02.01.02.13 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 11.64
02.01.02.14 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES m2 7.02
02.01.02.15 PENDIENTE FONDO (MORTERO 1:5) m2 0.49
02.01.02.16 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 11.64
02.01.02.17 SUM. Y COLOC. TUB. DE REBOSE Y LIMPIA 2" + ACCES.-VENTILACION und 1.00
02.01.02.18 SUM. Y COLOC. ACCESORIOS SALIDA TUBERIA DE SALIDA, 3" und 1.00
02.01.02.19 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 1.00
02.01.02.20 SUM. Y COLOC. TAPA METALICA DE 0.60 x 0.60 und 1.00
02.01.02.21 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 0.46
02.01.02.22 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 10.30
02.01.02.23 PUERTA DE CERCO PERIMTRICO und 1.00
02.01.02.24 CURADO DE OBRAS DE CONCRETO m2 18.66
P. UNIT. PARCIA
ITEM DESCRIPCION UNIDAD METRADO S/. S/.
P. UNIT. PARCIA
ITEM DESCRIPCION UNIDAD METRADO S/. S/.
P. UNIT. PARCIA
ITEM DESCRIPCION UNIDAD METRADO S/. S/.
P. UNIT. PARCIA
ITEM DESCRIPCION UNIDAD METRADO S/. S/.
P. UNIT. PARCIA
ITEM DESCRIPCION UNIDAD METRADO S/. S/.
02.01.08.21 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1/2" - CRP-7 und 1.00
02.01.08.22 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 3.24
02.01.08.23 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 82.80
02.01.08.24 PUERTA DE CERCO PERITRICO und 9.00
02.01.08.25 CURADO DE OBRAS DE CONCRETO m2 91.80
02.01.09 VALVULAS DE CONTROL (17 UND.)
02.01.09.01 TRAZO Y REPLANTEO m2 20.40
02.01.09.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 12.24
02.01.09.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 34.00
02.01.09.04 CONCRETO F'C=175 KG/CM2 m3 1.70
02.01.09.05 GRAVA PARA CAJAS, MAX.1" m3 0.27
02.01.09.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 34.00
02.01.09.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 17.00
02.01.09.08 SUM. Y COLOC. VALVULA 2"+ACCESORIOS und 1.00
02.01.09.09 SUM. Y COLOC. VALVULA 1 1/2"+ACCESORIOS und 4.00
02.01.09.10 SUM. Y COLOC. VALVULA 1"+ACCESORIOS und 2.00
02.01.09.11 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 9.00
02.01.09.12 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS und 1.00
02.01.09.13 CURADO DE OBRAS DE CONCRETO m2 34.00
02.01.09.14 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 20.40
02.01.10 VALVULAS DE PURGA (03 UND.)
02.01.10.01 TRAZO Y REPLANTEO m2 3.60
AMPLIACIN Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO DE ANEXO CHILON
OYECTO: DISTRITO DE HUALGAYOC - HUALGAYOC - CAJAMARCA
P. UNIT. PARCIA
ITEM DESCRIPCION UNIDAD METRADO S/. S/.
1.08.21 SUM. Y COLOC. ACCESORIOS TUBERIA DE SALIDA, 1/2" - CRP-7 und 1.00 61.24
1.08.22 COLOCACION CAPA IMPERMEABILIZANTE - PIEDRA MEDIANA m3 3.24 142.98 4
1.08.23 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 82.80 45.80 3,7
1.08.24 PUERTA DE CERCO PERITRICO und 9.00 124.47 1,1
1.08.25 CURADO DE OBRAS DE CONCRETO m2 91.80 3.55 3
1.09 VALVULAS DE CONTROL (17 UND.) 6,9
1.09.01 TRAZO Y REPLANTEO m2 20.40 5.35 1
1.09.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 12.24 28.51 3
1.09.03 ENCOFRADO Y DESENCOFRADO DE CAJA m2 34.00 39.00 1,3
1.09.04 CONCRETO F'C=175 KG/CM2 m3 1.70 320.46 5
1.09.05 GRAVA PARA CAJAS, MAX.1" m3 0.27 97.80
1.09.06 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) m2 34.00 14.12 4
1.09.07 SUM. Y COLOC. TAPA METALICA DE 0.40 x 0.40 und 17.00 144.69 2,4
1.09.08 SUM. Y COLOC. VALVULA 2"+ACCESORIOS und 1.00 147.29 1
1.09.09 SUM. Y COLOC. VALVULA 1 1/2"+ACCESORIOS und 4.00 122.11 4
1.09.10 SUM. Y COLOC. VALVULA 1"+ACCESORIOS und 2.00 114.31 2
1.09.11 SUM. Y COLOC. VALVULA 3/4"+ACCESORIOS und 9.00 52.65 4
1.09.12 SUM. Y COLOC. VALVULA 1/2"+ACCESORIOS und 1.00 49.22
1.09.13 CURADO DE OBRAS DE CONCRETO m2 34.00 3.55 1
1.09.14 PINTURA ESMALTE EN EXTERIORES (DOS MANOS) m2 20.40 8.12 1
1.10 VALVULAS DE PURGA (03 UND.) 1,3
1.10.01 TRAZO Y REPLANTEO m2 3.60 5.35