Model CBLE 100-800 HP Boilers

UL FM CSD-1 NFPA-85
ITEM DESCRIPTION 125 hp - 350 hp - 125 hp - 350 hp - 125 hp - 350 hp -
300 hp 800 hp 300 hp 800 hp 300 hp 800 hp
1 Pilot Shut Off Cock X X X X X X
2 Pilot Pressure Regulator X X X X X X
3 Pilot Pressure Gauge X X X X X X
4 Gas Pilot Valve X X X X X X
5 Pilot Vent Valve X
6 Gas Pilot Valve X
7 Manual Shut Off Valve X X X X X X
8 Low Gas Pressure Switch X X X X X X
9 Main Gas Valve w/o POC X X X X
10 Main Gas Valve w/ POC X X
11 Vent Valve or Valve Proving Switch X X X
12 Regulating Gas Valve w/ POC X X X X X X
13 High Gas Pressure Switch X X X X X X
14 Manual Shut Off Valve X X X X X X
15 Butterfly Valve X X X X X X

10
8 9 11 12 13
4 5 7 14 15
2 3 6
1
S
S S Gas M M To
1
Supply Burner
PILOT GAS LINE FLOW
MAIN GAS LINE FLOW

Figure A1-14. Model CB-LE Gas Train Components

MODEL CB
RECOMMENDED OIL LINEA
SUPPLY SIZES
AND (STANDARD PIPE) (IN. - IPS)
BOILER RETURN
HP CONN A (IN.) STORAGE
SIZES TANK TO PUMP RETURN
(IN.) BOILER TO LINE TO
(NPT) OR PUMP BOILER TANK
CONTRACTOR CONNECT
BOILER CONNECTIONS 125
FRONT 150 3/4 12-1/2 1 1 1
200
250
BOILER BASE FRAME 300 3/4 34 1 1 1
350
400
A RIGHT HAND SIDE VIEW 500 3/4 11-3/4 1 1 1
600
700
750 1 11-3/4 1 1 1
800
NOTE: See No. 2 Oil Line Sizing Instruction for systems with
other conditions.
A. For suction line condition with a maximum of 10 Feet of lift
and a total of 100 feet of suction line.

Figure A1-15. No. 2 Oil Connection Size, Location, and Recommended Line Sizes

Section A1-36 Rev. 09-09


Model CBLE 100-800 HP Boilers

Figure A1-16. No. 2 Oil Piping, Single Boiler Installation, Remote Oil Pump

Figure A1-17. No. 2 Oil Piping, Multiple Boiler Installation, Remote Oil Pumps

Section A1-37 Rev. 09-09


Model CBLE 100-800 HP Boilers

Figure A1-18. No. 2 Oil Piping, Multiple Boiler Installation

Section A1-38 Rev. 09-09


Model CBLE 100-800 HP Boilers
VENT
H OIL TRANSFER TANK AT
LOCATION NEAR BOILER

OIL LEVEL TEST OIL TRANSFER PUMP NEAR


VALVE STORAGE TANK
F.O.R. CHECK VALVE STRAINER
F.O.R.
F.O.S. GATE VALVE

SUPPLY TO BOILER F.O.S.


TERMINAL BLOCK OR
TO BOILER OIL PUMP
RELIEF VALVE GATE VALVE
UNION VACUUM
(100 PSIG)
GAUGE
ITEM SIZE DESCRIPTION
Connection to oil
A 1/2" NT
level switch
S
See 3/16"
B Return line to tank G
Note
B
Oil supply
See 2"
C connection from 5"
Note
transfer pump
3"
1/2" Tank drain
D 22"
NPT connection F
See C
E FOS connection 60"
Note
1/8" Oil level test valve 4" OR 6" STD
F 33"
NPT connection E BLACK PIPE
See
G FOR connection
Note
3"
H
No.80 Oil level switch
McD S
NOTE: Connections should be sized 3/8" MTL D 3/16"
using recommended sizes in oil line
sizing instructions.

Figure A1-19. No. 2 Oil Piping

(For elevated boiler room locations sized using recommended sizes in oil line sizing instructions.)

NOTE: OBSERVE ALL LOCAL AND NATIONAL


(EG. FIRE UNDERWRITERS) CODE
REQUIREMENTS GOVERNING THE
INSTALLATION OF FUEL OIL STORAGE
TANKS AND SUPPLY SYSTEMS

Figure A1-20. Typical Arrangement