RESUMEN DE METAS FISICAS

OBRA DE ARTE

SARDINEL
DESCRIPCION PAVIMENTO VEREDA CUNETA BOCACALLE BADEN PONTON
PERALTADO
M2 M2 ML ML M2 M2 M2
PSJE ANCALA 655.78 422.80 - 142.46 72.65 35.83 -
JR PUMACAHUA 3,157.49 1,338.99 375.68 2,217.06 96.32 54.48 -
JR. GARCILAZO DE LA VEGA 4,483.87 1,831.29 553.49 - 226.98 114.05 -
JR. SANTA ROSA 2,326.10 786.12 383.90 679.15 217.04 109.06 100.83
JR. LA MAR 2,018.45 298.31 217.82 570.60 28.24 14.24 -
PSJE TORRES 356.40 147.05 - 99.05 - - -
PSJE SAN ANTONIO 331.81 139.69 - 91.44 - - -
PSJE DIEGO FERRER 589.36 11.37 - 173.24 - - -
PSJE ELIAS AGUIRRE 472.01 - 150.79 174.81 - - -
PSJE GUIDO 353.38 - - 170.17 - - -

TOTAL A EJECUTAR 14,744.65 4,975.62 1,681.68 4,317.98 641.23 327.66 100.83


OTROS

AREA VERDE

M2
-
308.66
501.73
354.02
227.47
-
-
41.38
56.02

1,489.28