CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89 1 10.00 0.62


2 5.0 0.12 12 13 1.04 2 13.00 1.04
3 5.5 0.19 13 14 1.21 3 16.00 1.58
4 5.7 0.20 14 16 1.58 4 19.00 2.23
5 6.0 0.22 15 19 2.23 5 22.00 2.98
6 6.5 0.31 16 22 2.98 6 25.00 3.85
7 8.0 0.40 17 23 3.26 7 29.00 5.19
8 9.0 0.53 18 25 3.85 8 32.00 6.31
9 10.0 0.62 19 28 4.83 9 36.00 7.99
10 11.0 0.75 20 31 5.93
21 32 6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3

1. Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 12 x 12 cm
= ( 1 : 0.12 : 0.12 ) = 69.44 m1
Besi 4 batang dia. 12 = 4 x 69,44 x 0,89 kg = 247.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 69,44 : 0,20 ) x ( 4 x 0,12 ) x 0, 40 kg = 66.67 kg ( B )

BERAT BESI BETON UNTUK UKURAN 12 x 12 CM1 DALAM 1 M3 = 313.89 kg/m3 ( A + B )

2. Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 15 x 15 c = ( 1 : 0.15 : 0.15 ) = 44.44 m1
Besi 4 batang dia. 12 = 4 x 44,44 x 0,89 kg = 158.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 44,44 : 0,20 ) x ( 4 x 0,15 ) x 0, 40 kg = 71.11 kg ( B )

BERAT BESI BETON UNTUK UKURAN 15 x 15 CM1 DALAM 1 M3 = 229.33 kg/m3 ( A + B )

3. Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 c= ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 12 = 4 x 33,33 x 0,89 kg = 118.67 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x = 155.56 kg ( B )

BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3 = 274.22 kg/m3 ( A + B )

4. Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 c = ( 1 : 0.20 : 0.30 ) = 16.67 m1
Besi 4 batang dia. 12 = 4 x 16,67 x 0,89 kg = 89.00 kg ( A)
Besi 2 batang dia. 10 = 2 x 16.67 x 0.62 kg = 0.00 kg ( B)
Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0.15 ) x (( 2 x 0.2 ) + ( 2 X 0,3 )) X = 33.33 kg ( C )

BERAT BESI BETON UNTUK UKURAN 20 x 30 CM DALAM 1 M3 = 122.33 kg/m3 ( A + B + C )

KOTA BANJAR Halaman : 1+114


Lampiran 1
DAFTAR BERAT BESI KANAL " C "

NO. UKURAN BESI KANAL " C " BERAT 6 M1 BERAT PER 1 M1

6.00
1 60 x 30 x 10 x 1.6 x 6 mm 9.80 kg 1.63 kg
2 60 x 30 x 10 x 2.3 x 6 mm 13.90 kg 2.32 kg
3 75 x 35 x 15 x 1.6 x 6 mm 12.50 kg 2.08 kg
4 75 x 35 x 15 x 2.3 x 6 mm 17.40 kg 2.90 kg
5 75 x 45 x 15 x 1.6 x 6 mm 14.00 kg 2.33 kg
6 75 x 45 x 15 x 2.3 x 6 mm 19.00 kg 3.17 kg
7 100 x 50 x 20 x 2 x 6 mm 21.40 kg 3.57 kg
8 100 x 50 x 20 x 2.3 x 6 mm 24.40 kg 4.07 kg
9 100 x 50 x 20 x 3.2 x 6 mm 33.00 kg 5.50 kg
10 125 x 50 x 20 x 2 x 6 mm 23.70 kg 3.95 kg
11 125 x 50 x 20 x 2.3 x 6 mm 27.10 kg 4.52 kg
12 125 x 50 x 20 x 3.2 x 6 mm 37.00 kg 6.17 kg
13 150 x 50 x 20 x 2 x 6 mm 26.10 kg 4.35 kg
14 150 x 50 x 20 x 2.3 x 6 mm 29.76 kg 4.96 kg
15 150 x 50 x 20 x 3.2 x 6 mm 40.56 kg 6.76 kg
16 150 x 65 x 20 x 2 x 6 mm 28.92 kg 4.82 kg
17 150 x 65 x 20 x 2.3 x 6 mm 33.00 kg 5.50 kg
18 150 x 65 x 20 x 3.2 x 6 mm 45.10 kg 7.52 kg
19 200 x 75 x 20 x 2 x 6 mm 35.52 kg 5.92 kg
20 200 x 75 x 20 x 2.3 x 6 mm 40.62 kg 6.77 kg
21 200 x 75 x 20 x 3.2 x 6 mm 55.62 kg 9.27 kg

KOTA BANJAR Halaman :2+115


Lampiran 2
DAFTAR BERAT BESI IWF

NO. UKURAN IWF BERAT 12 M1 BERAT PER 1 M1


1 100 x 50 x 5 x 7 mm 112.00 kg 9.33 kg
2 125 x 60 x 6 x 8 mm 158.40 kg 13.20 kg
3 148 x 100 x 6 x 9 mm 253.20 kg 21.10 kg
4 150 x 75 x 5 x 7 mm 168.00 kg 14.00 kg
5 175 x 90 x 5 x 8 mm 217.40 kg 18.12 kg
6 198 x 99 x 4.5 x 7 mm 218.40 kg 18.20 kg
7 200 x 100 x 5.5 x 8 mm 256.00 kg 21.33 kg
8 248 x 124 x 5 x 8 mm 308.40 kg 25.70 kg
9 250 x 125 x 6 x 9 mm 355.20 kg 29.60 kg
10 298 x 149 x 6 x 8 mm 384.00 kg 32.00 kg
11 300 x 150 x 6.5 x 9 mm 440.40 kg 36.70 kg
12 346 x 174 x 6 x 9 mm 497.00 kg 41.42 kg
13 350 x 175 x 7 x 11 mm 595.20 kg 49.60 kg
14 396 x 199 x 7 x 11 mm 679.20 kg 56.60 kg
15 400 x 200 x 8 x 13 mm 792.00 kg 66.00 kg
16 446 x 199 x 8 x 12 mm 794.40 kg 66.20 kg
17 450 x 200 x 9 x 14 mm 912.00 kg 76.00 kg
18 500 x 200 x 10 x 16 mm 1,075.00 kg 89.58 kg
19 588 x 300 x 12 x 20 mm 1,812.00 kg 151.00 kg
20 600 x 200 x 11 x 17 mm 1,272.00 kg 106.00 kg
21 700 x 300 x 13 x 24 mm 2,220.00 kg 185.00 kg
22 800 x 300 x 14 x 26 mm 2,520.00 kg 210.00 kg
23 900 x 300 x 16 x 28 mm 2,916.00 kg 243.00 kg

DAFTAR BERAT BESI SIKU " L "

NO. UKURAN BESI KANAL " L " BERAT / BATANG BERAT PER 1 M1
1 25 x 25 x 3 x 6 mm 6.72 kg 1.12 kg
2 30 x 30 x 3 x 6 mm 8.16 kg 1.36 kg
3 40 x 40 x 3 x 6 mm 11.00 kg 1.83 kg
4 40 x 40 x 4 x 6 mm 14.50 kg 2.42 kg
5 50 x 50 x 4 x 6 mm 18.50 kg 3.08 kg
6 50 x 50 x 5 x 6 mm 22.60 kg 3.77 kg
7 60 x 60 x 5 x 6 mm 27.30 kg 4.55 kg
8 60 x 60 x 6 x 6 mm 32.52 kg 5.42 kg
9 65 x 65 x 6 x 6 mm 35.46 kg 5.91 kg
10 70 x 70 x 7 x 6 mm 44.28 kg 7.38 kg
11 75 x 75 x 6 x 6 mm 41.22 kg 6.87 kg
12 75 x 75 x 8 x 6 mm 54.18 kg 9.03 kg
13 80 x 80 x 8 x 6 mm 57.96 kg 9.66 kg
14 90 x 90 x 9 x 6 mm 73.20 kg 12.20 kg
15 100 x 100 x 8 x 6 mm 73.20 kg 12.20 kg
16 100 x 100 x 10 x 6 mm 90.60 kg 15.10 kg
17 120 x 120 x 10 x 12 mm 218.40 kg 36.40 kg
18 120 x 120 x 12 x 12 mm 260.00 kg 43.33 kg
19 125 x 125 x 12 x 12 mm 280.00 kg 46.67 kg
20 130 x 130 x 9 x 12 mm 214.20 kg 35.70 kg
21 130 x 130 x 12 x 12 mm 280.00 kg 46.67 kg

KOTA BANJAR Halaman : 3+116


CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89 1 10.00 0.62


2 5.0 0.12 12 13 1.04 2 13.00 1.04
3 5.5 0.19 13 14 1.21 3 16.00 1.58
4 5.7 0.20 14 16 1.58 4 19.00 2.23
5 6.0 0.22 15 19 2.23 5 22.00 2.98
6 6.5 0.31 16 22 2.98 6 25.00 3.85
7 8.0 0.40 17 23 3.26 7 29.00 5.19
8 9.0 0.53 18 25 3.85 8 32.00 6.31
9 10.0 0.62 19 28 4.83 9 36.00 7.99
10 11.0 0.75 20 31 5.93
21 32 6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3


VRS I SLOOF
uraian Rms tul 4 Btg 12 + 2 Btag 10 Beugel 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.25 0.30 = 13.3333
Besi 4 batang dia. 12 4 13.3333 0.62 = 33.0667
Besi 2 batang dia. 10 0 13.3333333333 0.89 = -
Besi beugel dia. 8 jarak 10 - 20 cm 66.6666666667 1.1000 0.22 = 16.1333
49.2000

VRS II KOLOM TULANGAN 4 BUAH


uraian Rms tul 4 Btg 12 + 2 Btag 10 Beugel 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.15 0.20 = 33.3333
Besi 4 batang dia. 12 4 33.3333333333 0.62 = 82.6667
Besi 2 batang dia. 10 0 33.3333333333 0.00 = -
Besi beugel dia. 8 jarak 15 cm 222.2222222222 0.7000 0.22 = 34.2222
116.8889

VRS III KOLOM TULANGAN 6-8-12 BUAH


uraian Rms tul 4 Btg 12 + 2 Btag 10 Beugel 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.10 0.15 = 66.6667
Besi 4 batang dia. 12 4 66.6666666667 0.00 = -
Besi 2 batang dia. 10 0 66.6666666667 0.00 = -
Besi beugel dia. 8 jarak 15 cm 444.4444444444 0.5000 0.00 = -
-

VRS IV RING BALK


uraian Rms tul 4 Btg 12 + 2 Btag 10 Beugel 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.15 0.25 = 26.6667
Besi 4 batang dia. 12 6 26.6666666667 0.89 = 142.4000
Besi 2 batang dia. 10 0 26.6666666667 0.00 = -
Besi beugel dia. 8 jarak 15 cm 177.7777777778 0.8000 0.40 = 56.8889
199.2889

PLAT BETON
VOLUME LEBAR TEBAL PANJANG
1.00 1.00 0.12 8.33

JARAK TULANGAN jumlah tulangan(m') melint jumlah tulangan(m') memanja diameter volume tulangan (kg)
1 LAPIS 0.10 11.00 11.00 84.33 84.00 0.62 108.91
2 LAPIS 0.10 11.00 11.00 84.33 84.00 0.62 231.96

KOTA BANJAR Halaman : 4+114


BEKISTING SLOOF M2 M3 PAKU/m2 kg
0.300 0.300 0.600 8.800 0.18 0.396 0.300 8.800 2.64

KG PELUMAS BEKISTING ltr


KAWAT BETON 51.660 0.015 0.77 0.100 8.000 0.80
51.7

BEKISTING KOLOM M2 M3 PAKU/m2 kg


0.300 0.400 0.700 25.667 0.51 1.027 0.400 25.667 10.27

KG PELUMAS BEKISTING ltr


KAWAT BETON 116.889 0.015 1.75 0.200 25.667 5.13
122.7

BEKISTING KOLOM M2 M3 PAKU/m2 kg


0.200 0.300 0.500 36.667 0.73 1.467 0.400 36.667 14.67

KG PELUMAS BEKISTING ltr


KAWAT BETON - 0.015 - 0.200 36.667 7.33
-

BEKISTING RING BALK M2 M3 PAKU/m2 kg


0.150 0.500 0.650 19.067 0.38 0.763 0.400 19.067 7.63

KG PELUMAS BEKISTIN ltr


KAWAT BETON 209.253 0.015 3.14 0.200 19.067 3.81
209.3

untuk 1 lapis untuk 2 lapis


bekisting papan stootwerk jumlah total bekisting papan stootwerk
dikalikan koef 1.05 luas tebal
kaso 6/6 per m2 p = 3 m = 5 luas kaso
tebal 6/6 per m2 p = 3 m = 5
114.4 114.36 11.631 0.020 0.054 0.29 11.631 0.020 0.054
243.6 243.56
paku/m2 jumlah paku/m2
koefisien kawat untuk 100 kg 0.15 0.400 11.631 4.65 0.400 11.631
kawat beton jumlah kawat beton

KOTA BANJAR Halaman : 5+114


ANALISA SATUAN PEKERJAAN
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.01.02 1 M2 PEMBUATAN DIREKSI KEET DAN LOS GUDANG KERJA
BAHAN :
Kayu Albasiah 0.0800 m3 2,200,000.00 176,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.2500 kg 18,000.00 4,500.00
Asbes Gelombang ( 80 x 180 cm cm ) 0.6200 lbr 39,000.00 24,180.00
Triplex 3 mm 0.5000 lbr 50,000.00 25,000.00
PC (50 kg) 5.0000 kg 1,250.00 6,250.00
Pasir pasang 0.2500 m3 110,000.00 27,500.00
Bata merah 70.0000 bh 500.00 35,000.00
Jumlah Bahan 298,430.00
UPAH :
Ongkos Pasang 0.1500 ls 298,430.00 44,764.50
Jumlah Pekerja 44,764.50
Jumlah Bahan + Pekerja 343,194.50
Jumlah Total 343,194.50
Dibulatkan 343,100.00
A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN 1 METER
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.7500 Oh 65,000.00 48,750.00
Mandor 0.0250 Oh 100,000.00 2,500.00
Jumlah Pekerja 51,250.00
Jumlah Bahan + Pekerja 51,250.00
Jumlah Total 51,250.00
Dibulatkan 51,200.00
A.02.09 1 M3 URUGAN TANAH KEMBALI
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 65,000.00 16,250.00
Mandor 0.0083 Oh 100,000.00 830.00
Jumlah Pekerja 17,080.00
Jumlah Bahan + Pekerja 17,080.00
Jumlah Total 17,080.00
Dibulatkan 17,000.00

6 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.02.10 1 M3 PEMADATAN TANAH
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.1920 Oh 65,000.00 12,480.00
Mandor 0.0190 Oh 100,000.00 1,900.00
Jumlah Pekerja 14,380.00
Jumlah Bahan + Pekerja 14,380.00
Jumlah Total 14,380.00
Dibulatkan 14,300.00
A.02.11 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)
BAHAN :
Tanah Urug (didatangkan) 1.2000 m3 25,000.00 30,000.00
Jumlah Bahan 30,000.00
UPAH :
Pekerja 0.4500 Oh 65,000.00 29,250.00
Mandor 0.0450 Oh 100,000.00 4,500.00
Alat Bantu (sewa Stamper) 0.1250 Oh 200,000.00 25,000.00
Jumlah Pekerja 58,750.00
Jumlah Bahan + Pekerja 88,750.00
Jumlah Total 88,750.00
Dibulatkan 88,700.00
A.02.12 1 M3 URUGAN PASIR
BAHAN :
Pasir Urug 1.2000 m3 80,000.00 96,000.00
Jumlah Bahan 96,000.00
UPAH :
Pekerja 0.3000 Oh 65,000.00 19,500.00
Mandor 0.0100 Oh 100,000.00 1,000.00
Jumlah Pekerja 20,500.00
Jumlah Bahan + Pekerja 116,500.00
Jumlah Total 116,500.00
Dibulatkan 116,500.00

7 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.03.01 1 M3 PASANG AANSTAMPING BATU KOSONG
BAHAN :
Batu Belah 15/20 1.2000 m3 110,000.00 132,000.00
Pasir Urug 0.4320 m3 80,000.00 34,560.00
Jumlah Bahan 166,560.00
UPAH :
Pekerja 0.7800 Oh 65,000.00 50,700.00
Tukang Batu 0.3900 Oh 85,000.00 33,150.00
Kepala Tukang 0.0390 Oh 90,000.00 3,510.00
Mandor 0.0390 Oh 100,000.00 3,900.00
Jumlah Pekerja 91,260.00
Jumlah Bahan + Pekerja 257,820.00
Jumlah Total 257,820.00
Dibulatkan 257,800.00
A.03.04 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 5 Ps
BAHAN :
Batu Belah 15/20 1.2000 m3 110,000.00 132,000.00
Semen Portland 136.0000 kg 1,250.00 170,000.00
Pasir Pasang 0.5440 m3 110,000.00 59,840.00
Jumlah Bahan 361,840.00
UPAH :
Pekerja 1.5000 Oh 65,000.00 97,500.00
Tukang Batu 0.7500 Oh 85,000.00 63,750.00
Kepala Tukang 0.0750 Oh 90,000.00 6,750.00
Mandor 0.0750 Oh 100,000.00 7,500.00
Jumlah Pekerja 175,500.00
Jumlah Bahan + Pekerja 537,340.00
Jumlah Total 537,340.00
Dibulatkan 537,300.00
A.04.14 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN :
Semen Portland 218.0000 kg 1,250.00 272,500.00
Pasir Beton 0.5200 m 130,000.00 67,600.00
Batu Pecah Mesin 2/3 0.8700 m 160,000.00 139,200.00
Jumlah Bahan 479,300.00
UPAH :
Pekerja 1.6500 Oh 65,000.00 107,250.00
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Kepala Tukang 0.0250 Oh 90,000.00 2,250.00
Mandor 0.0800 Oh 100,000.00 8,000.00
Jumlah Pekerja 138,750.00
Jumlah Bahan + Pekerja 618,050.00
Jumlah Total 618,050.00
Dibulatkan 618,000.00
A.04.21 1 M3 MEMBUAT SLOOF 15/20 (117.6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekisting Albasiah 0.2700 m 2,200,000.00 594,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.0000 kg 18,000.00 72,000.00
Minyak Bekisting 1.3300 ltr 27,000.00 35,910.00
Besi Beton Polos U 24 117.6000 kg 11,000.00 1,293,600.00
Kawat Beton 1.7600 kg 21,000.00 36,960.00
Semen Portland 323.0000 kg 1,250.00 403,750.00
Pasir Beton 0.5200 m 130,000.00 67,600.00
Batu Pecah 2/3 0.7800 m 160,000.00 124,800.00

8 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
Jumlah Bahan 2,628,620.00
UPAH :
Pekerja 3.0000 Oh 65,000.00 195,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 90,000.00 22,050.00
Mandor 0.1225 Oh 100,000.00 12,250.00
Jumlah Pekerja 436,700.00
Jumlah Bahan + Pekerja 3,065,320.00
Jumlah 3,065,320.00
Dibulatkan 3,065,300.00

9 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.04.25 1 M3 MEMBUAT KOLOM 12/12 (211.2900 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3700 m 2,200,000.00 814,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.6600 kg 18,000.00 119,880.00
Minyak Bekisting 3.3200 ltr 27,000.00 89,640.00
Besi Beton Polos U 24 211.2900 kg 11,000.00 2,324,190.00
Kawat Beton 3.1700 kg 21,000.00 66,570.00
Semen Portland 323.0000 kg 1,250.00 403,750.00
Pasir Beton 0.5200 m 130,000.00 67,600.00
Batu Pecah 2/3 0.7800 m 160,000.00 124,800.00
Jumlah Bahan 4,010,430.00
UPAH :
Pekerja 3.0000 Oh 65,000.00 195,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 90,000.00 22,050.00
Mandor 0.1225 Oh 100,000.00 12,250.00
Jumlah Pekerja 436,700.00
Jumlah Bahan + Pekerja 4,447,130.00
Jumlah 4,447,130.00
Dibulatkan 4,447,100.00
A.04.29 1 M3 MEMBUAT KOLOM 15/20 (117.5900 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4600 m 2,200,000.00 1,012,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6600 ltr 27,000.00 125,820.00
Besi Beton Polos U 24 117.5900 kg 11,000.00 1,293,490.00
Kawat Beton 1.6800 kg 21,000.00 35,280.00
Semen Portland 323.0000 kg 1,250.00 403,750.00
Pasir Beton 0.5200 m 130,000.00 67,600.00
Batu Pecah 2/3 0.7800 m 160,000.00 124,800.00
Jumlah Bahan 3,230,680.00
UPAH :
Pekerja 3.0000 Oh 65,000.00 195,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 90,000.00 22,050.00
Mandor 0.1225 Oh 100,000.00 12,250.00
Jumlah Pekerja 436,700.00
Jumlah Bahan + Pekerja 3,667,380.00
Jumlah 3,667,380.00
Dibulatkan 3,667,300.00

10 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.04.32 1 M3 MEMBUAT KOLOM 20/20 (92.0500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m 2,200,000.00 880,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 27,000.00 108,000.00
Besi Beton Polos U 24 92.0500 kg 11,000.00 1,012,550.00
Kawat Beton 1.3800 kg 21,000.00 28,980.00
Semen Portland 323.0000 kg 1,250.00 403,750.00
Pasir Beton 0.5200 m 130,000.00 67,600.00
Batu Pecah 2/3 0.7800 m 160,000.00 124,800.00
Jumlah Bahan 2,769,680.00
UPAH :
Pekerja 3.0000 Oh 65,000.00 195,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 90,000.00 22,050.00
Mandor 0.1225 Oh 100,000.00 12,250.00
Jumlah Pekerja 436,700.00
Jumlah Bahan + Pekerja 3,206,380.00
Jumlah 3,206,380.00
Dibulatkan 3,206,300.00
A.04.39 1 M3 MEMBUAT RING BALK 12/15 (172.9000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.4700 m 2,200,000.00 1,034,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6700 ltr 27,000.00 126,090.00
Besi Beton Polos U 24 172.9000 kg 11,000.00 1,901,900.00
Kawat Beton 2.5900 kg 21,000.00 54,390.00
Semen Portland 323.0000 kg 1,250.00 403,750.00
Pasir Beton 0.5200 m 130,000.00 67,600.00
Batu Pecah 2/3 0.7800 m 160,000.00 124,800.00
Jumlah Bahan 3,880,470.00
UPAH :
Pekerja 3.0000 Oh 65,000.00 195,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 90,000.00 22,050.00
Mandor 0.1225 Oh 100,000.00 12,250.00
Jumlah Pekerja 436,700.00
Jumlah Bahan + Pekerja 4,317,170.00
Jumlah 4,317,170.00
Dibulatkan 4,317,100.00

11 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.04.42 1 M3 MEMBUAT RING BALK 15/20 (117,6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3700 m 2,200,000.00 814,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 7.3300 kg 18,000.00 131,940.00
Minyak Bekisting 3.6700 ltr 27,000.00 99,090.00
Besi Beton Polos U 24 117.6000 kg 11,000.00 1,293,600.00
Kawat Beton 1.7600 kg 21,000.00 36,960.00
Semen Portland 323.0000 kg 1,250.00 403,750.00
Pasir Beton 0.5200 m 130,000.00 67,600.00
Batu Pecah 2/3 0.7800 m 160,000.00 124,800.00
Jumlah Bahan 2,971,740.00
UPAH :
Pekerja 3.0000 Oh 65,000.00 195,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 90,000.00 22,050.00
Mandor 0.1225 Oh 100,000.00 12,250.00
Jumlah Pekerja 436,700.00
Jumlah Bahan + Pekerja 3,408,440.00
Jumlah 3,408,440.00
Dibulatkan 3,408,400.00
A.04.45 1 M3 MEMBUAT RING BALK 15/25 (151,9500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3500 m 2,200,000.00 770,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 18,000.00 124,740.00
Minyak Bekisting 3.4700 ltr 27,000.00 93,690.00
Besi Beton Polos U 24 151.9500 kg 11,000.00 1,671,450.00
Kawat Beton 2.2800 kg 21,000.00 47,880.00
Semen Portland 323.0000 kg 1,250.00 403,750.00
Pasir Beton 0.5200 m 130,000.00 67,600.00
Batu Pecah 2/3 0.7800 m 160,000.00 124,800.00
Jumlah Bahan 3,303,910.00
UPAH :
Pekerja 3.0000 Oh 65,000.00 195,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 90,000.00 22,050.00
Mandor 0.1225 Oh 100,000.00 12,250.00
Jumlah Pekerja 436,700.00
Jumlah Bahan + Pekerja 3,740,610.00
Jumlah 3,740,610.00
Dibulatkan 3,740,600.00

12 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.04.48 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 10 cm TEBAL 8 cm
BAHAN :
Semen Portland 323.0000 kg 1,250.00 403,750.00
Pasir Beton 0.5200 m 130,000.00 67,600.00
Batu Pecah Mesin 2/3 0.7800 m 160,000.00 124,800.00
Besi Beton (Polos / ulir) 108.3700 kg 11,000.00 1,192,070.00
Kawat Beton 1.6300 kg 21,000.00 34,230.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.8600 kg 18,000.00 105,480.00
Minyak Bekisting 2.9300 ltr 27,000.00 79,110.00
Bekisting Albasiah 0.3200 m 2,200,000.00 704,000.00
Jumlah Bahan 2,711,040.00
UPAH :
Pekerja 6.4697 Oh 65,000.00 420,533.10
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Tukang Kayu 4.0260 Oh 85,000.00 342,210.00
Tukang Besi 1.0073 Oh 85,000.00 85,621.69
Kepala Tukang 0.5192 Oh 90,000.00 46,725.66
Mandor 0.1924 Oh 100,000.00 19,244.60
Jumlah Pekerja 935,585.05
Jumlah Bahan + Pekerja 3,646,625.05
Jumlah Total 3,646,625.05
Dibulatkan 3,646,600.00
A.04.50 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm
BAHAN :
Semen Portland 323.0000 kg 1,250.00 403,750.00
Pasir Beton 0.5200 m 130,000.00 67,600.00
Batu Pecah Mesin 2/3 0.7800 m 160,000.00 124,800.00
Besi Beton (Polos / ulir) 192.9900 kg 11,000.00 2,122,890.00
Kawat Beton 2.8900 kg 21,000.00 60,690.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.8800 kg 18,000.00 87,840.00
Minyak Bekisting 2.4400 ltr 27,000.00 65,880.00
Bekisting Albasiah 0.2700 m 2,200,000.00 594,000.00
Jumlah Bahan 3,527,450.00
UPAH :
Pekerja 6.4697 Oh 65,000.00 420,533.10
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Tukang Kayu 4.0260 Oh 85,000.00 342,210.00
Tukang Besi 1.0073 Oh 85,000.00 85,621.69
Kepala Tukang 0.5192 Oh 90,000.00 46,725.66
Mandor 0.1924 Oh 100,000.00 19,244.60
Jumlah Pekerja 935,585.05
Jumlah Bahan + Pekerja 4,463,035.05
Jumlah Total 4,463,035.05
Dibulatkan 4,463,000.00

13 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.05.05 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm 70.0000 bh 500.00 35,000.00
Semen Portland 9.6800 kg 1,250.00 12,100.00
Pasir Pasang 0.0450 m 110,000.00 4,950.00
Jumlah Bahan 52,050.00
UPAH :
Pekerja 0.3000 Oh 65,000.00 19,500.00
Tukang Batu 0.1000 Oh 85,000.00 8,500.00
Kepala Tukang 0.0100 Oh 90,000.00 900.00
Mandor 0.0150 Oh 100,000.00 1,500.00
Jumlah Pekerja 30,400.00
Jumlah Bahan + Pekerja 82,450.00
Jumlah Total 82,450.00
Dibulatkan 82,400.00
A.06.04 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN
BAHAN :
Semen Portland 5.1840 kg 1,250.00 6,480.00
Pasir Pasang 0.0260 m 110,000.00 2,860.00
Jumlah Bahan 9,340.00
UPAH :
Pekerja 0.3000 Oh 65,000.00 19,500.00
Tukang Batu 0.1500 Oh 85,000.00 12,750.00
Kepala Tukang 0.0150 Oh 90,000.00 1,350.00
Mandor 0.0150 Oh 100,000.00 1,500.00
Jumlah Pekerja 35,100.00
Jumlah Bahan + Pekerja 44,440.00
Jumlah Total 44,440.00
Dibulatkan 44,400.00
A.07.09 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAYU LOKAL KLS II
BAHAN :
Kayu KAYU LOKAL KLS II , Balok 1.2000 m 2,750,000.00 3,300,000.00
Paku 8 cm s/d 12 cm 1.2500 kg 18,000.00 22,500.00
Lem Kayu 1.0000 kg 16,000.00 16,000.00
Jumlah Bahan 3,338,500.00
UPAH :
Pekerja 6.0000 Oh 65,000.00 390,000.00
Tukang Kayu 18.0000 Oh 85,000.00 1,530,000.00
Kepala Tukang 1.8000 Oh 90,000.00 162,000.00
Mandor 0.3000 Oh 100,000.00 30,000.00
Jumlah Pekerja 2,112,000.00
Jumlah Bahan + Pekerja 5,450,500.00
Jumlah Total 5,450,500.00
Dibulatkan 5,450,500.00

14 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.07.14 1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II
BAHAN :
Kayu Lokal Kls II , Papan 0.0400 m 3,000,000.00 120,000.00
Lem Kayu 0.5000 kg 16,000.00 8,000.00
Jumlah Bahan 128,000.00
UPAH :
Pekerja 1.0000 Oh 65,000.00 65,000.00
Tukang Kayu 3.0000 Oh 85,000.00 255,000.00
Kepala Tukang 0.3000 Oh 90,000.00 27,000.00
Mandor 0.0500 Oh 100,000.00 5,000.00
Jumlah Pekerja 352,000.00
Jumlah Bahan + Pekerja 480,000.00
Jumlah Total 480,000.00
Dibulatkan 480,000.00
A.07.18 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAYU LOKAL KLS II
BAHAN :
Kayu KAYU LOKAL KLS II , Papan 0.0240 m 3,000,000.00 72,000.00
Lem Kayu 0.3000 kg 16,000.00 4,800.00
Jumlah Bahan 76,800.00
UPAH :
Pekerja 0.8000 Oh 65,000.00 52,000.00
Tukang Kayu 2.4000 Oh 85,000.00 204,000.00
Kepala Tukang 0.2400 Oh 90,000.00 21,600.00
Mandor 0.0400 Oh 100,000.00 4,000.00
Jumlah Pekerja 281,600.00
Jumlah Bahan + Pekerja 358,400.00
Jumlah Total 358,400.00
Dibulatkan 358,400.00
A.08.15 1 M2 PASANG ATAP GENTENG PALENTONG
BAHAN :
Genteng Palentong 25.0000 buah 1,500.00 37,500.00
Jumlah Bahan 37,500.00
UPAH :
Pekerja 0.1500 Oh 65,000.00 9,750.00
Tukang Kayu 0.0750 Oh 85,000.00 6,375.00
Kepala Tukang 0.0080 Oh 90,000.00 720.00
Mandor 0.0080 Oh 100,000.00 800.00
Jumlah Pekerja 17,645.00
Jumlah Bahan + Pekerja 55,145.00
Jumlah Total 55,145.00
Dibulatkan 55,100.00

15 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.08.18 1 M1 PASANG BUBUNG GENTENG PALENTONG
BAHAN :
Genteng Bubung Palentong 5.0000 buah 3,000.00 15,000.00
Semen Portland 8.0000 kg 1,250.00 10,000.00
Pasir Pasang 0.0320 m3 110,000.00 3,520.00
Jumlah Bahan 28,520.00
UPAH :
Pekerja 0.4000 Oh 65,000.00 26,000.00
Tukang Kayu 0.2000 Oh 85,000.00 17,000.00
Kepala Tukang 0.0200 Oh 90,000.00 1,800.00
Mandor 0.0020 Oh 100,000.00 200.00
Jumlah Pekerja 45,000.00
Jumlah Bahan + Pekerja 73,520.00
Jumlah Total 73,520.00
Dibulatkan 73,500.00
A.08.26 1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU LOKAL KLS II
BAHAN :
Kayu Lokal Kls II, Papan 0.0108 m 3,000,000.00 32,400.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.1000 kg 18,000.00 1,800.00
Jumlah Bahan 34,200.00
UPAH :
Pekerja 0.1000 Oh 65,000.00 6,500.00
Tukang Kayu 0.2000 Oh 85,000.00 17,000.00
Kepala Tukang 0.0200 Oh 90,000.00 1,800.00
Mandor 0.0050 Oh 100,000.00 500.00
Jumlah Pekerja 25,800.00
Jumlah Bahan + Pekerja 60,000.00
Jumlah Total 60,000.00
Dibulatkan 60,000.00
A.08.34 1 M1 PASANG TALANG DATAR/JURAI SENG BJLS
BAHAN :
Seng Plat BJLS, L = 90 cm 1.0500 m1 35,000.00 36,750.00
Paku 3 cm 0.0150 kg 18,000.00 270.00
Kayu KAYU LOKAL KLS II, papan 0.0190 m 3,000,000.00 57,000.00
Jumlah Bahan 94,020.00
UPAH :
Pekerja 0.2000 Oh 65,000.00 13,000.00
Tukang Kayu 0.4000 Oh 85,000.00 34,000.00
Kepala Tukang 0.0250 Oh 90,000.00 2,250.00
Mandor 0.01000 Oh 100,000.00 1,000.00
Jumlah Pekerja 50,250.00
Jumlah Bahan + Pekerja 144,270.00
Jumlah Total 144,270.00
Dibulatkan 144,200.00

16 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.09.03 1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU LOKAL KLS II
BAHAN :
Kayu Lokal Klas II, Balok 0.0154 m 2,750,000.00 42,350.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.2000 kg 18,000.00 3,600.00
Jumlah Bahan 45,950.00
UPAH :
Pekerja 0.1500 Oh 65,000.00 9,750.00
Tukang Kayu 0.3000 Oh 85,000.00 25,500.00
Kepala Tukang 0.0300 Oh 90,000.00 2,700.00
Mandor 0.0750 Oh 100,000.00 7,500.00
Jumlah Pekerja 45,450.00
Jumlah Bahan + Pekerja 91,400.00
Jumlah Total 91,400.00
Dibulatkan 91,400.00
A.09.06 1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm
BAHAN :
Eternit 1.1000 m2 10,000.00 11,000.00
Paku 3 cm 0.0100 kg 18,000.00 180.00
Jumlah Bahan 11,180.00
UPAH :
Pekerja 0.0300 Oh 65,000.00 1,950.00
Tukang Kayu 0.0700 Oh 85,000.00 5,950.00
Kepala Tukang 0.0070 Oh 90,000.00 630.00
Mandor 0.0040 Oh 100,000.00 400.00
Jumlah Pekerja 8,930.00
Jumlah Bahan + Pekerja 20,110.00
Jumlah Total 20,110.00
Dibulatkan 20,100.00
A.09.09 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4
BAHAN :
Kayu Profil 1.0500 m' 3,000.00 3,150.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.0100 kg 18,000.00 180.00
Jumlah Bahan 3,330.00
UPAH :
Pekerja 0.0500 Oh 65,000.00 3,250.00
Tukang Kayu 0.0500 Oh 85,000.00 4,250.00
Kepala Tukang 0.0050 Oh 90,000.00 450.00
Mandor 0.0030 Oh 100,000.00 300.00
Jumlah Pekerja 8,250.00
Jumlah Bahan + Pekerja 11,580.00
Jumlah Total 11,580.00
Dibulatkan 11,500.00

17 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.10.03 1 M2 PASANG LANTAI KERAMIK WARNA 20 X 20 CM
BAHAN :
Ubin Keramik 20 x 20 cm 1.1000 m2 50,000.00 55,000.00
Semen Portland 10.4000 kg 1,250.00 13,000.00
Pasir Pasang 0.0450 m3 110,000.00 4,950.00
Semen Warna 1.6200 kg 7,000.00 11,340.00
Jumlah Bahan 84,290.00
UPAH :
Pekerja 0.7000 Oh 65,000.00 45,500.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Kepala Tukang 0.0350 Oh 90,000.00 3,150.00
Mandor 0.0350 Oh 100,000.00 3,500.00
Jumlah Pekerja 81,900.00
Jumlah Bahan + Pekerja 166,190.00
Jumlah Total 166,190.00
Dibulatkan 166,100.00
A.10.09 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
BAHAN :
Ubin Keramik 40 x 40 cm 1.1000 m2 65,000.00 71,500.00
Semen Portland 9.8000 kg 1,250.00 12,250.00
Pasir Pasang 0.0450 m3 110,000.00 4,950.00
Semen Warna 1.3000 kg 7,000.00 9,100.00
Jumlah Bahan 97,800.00
UPAH :
Pekerja 0.2500 Oh 65,000.00 16,250.00
Tukang Batu 0.1250 Oh 85,000.00 10,625.00
Kepala Tukang 0.0130 Oh 90,000.00 1,170.00
Mandor 0.0130 Oh 100,000.00 1,300.00
Jumlah Pekerja 29,345.00
Jumlah Bahan + Pekerja 127,145.00
Jumlah Total 127,145.00
Dibulatkan 127,100.00
A.10.19 1 M2 PASANG DINDING KERAMIK 20 X 25 CM
BAHAN :
Keramik 20 x 25 cm 1.1000 m2 50,000.00 55,000.00
Semen Abu-abu 9.3000 kg 1,250.00 11,625.00
Pasir Pasang 0.0180 m3 110,000.00 1,980.00
Semen Warna 1.9400 kg 7,000.00 13,580.00
Jumlah Bahan 82,185.00
UPAH :
Pekerja 0.9000 Oh 65,000.00 58,500.00
Tukang Batu 0.4500 Oh 85,000.00 38,250.00
Kepala Tukang 0.0450 Oh 90,000.00 4,050.00
Mandor 0.0450 Oh 100,000.00 4,500.00
Jumlah Pekerja 105,300.00
Jumlah Bahan + Pekerja 187,485.00
Jumlah Total 187,485.00
Dibulatkan 187,400.00

18 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.11.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN
BAHAN :
Kloset Jongkok porselen 1.0000 bh 160,000.00 160,000.00
Semen Portland 6.0000 kg 1,250.00 7,500.00
Pasir Pasang 0.0100 m 110,000.00 1,100.00
Jumlah Bahan 168,600.00
UPAH :
Pekerja 1.0000 Oh 65,000.00 65,000.00
Tukang Batu 1.5000 Oh 85,000.00 127,500.00
Kepala Tukang 1.5000 Oh 90,000.00 135,000.00
Mandor 0.1600 Oh 100,000.00 16,000.00
Jumlah Pekerja 343,500.00
Jumlah Bahan + Pekerja 512,100.00
Jumlah Total 512,100.00
Dibulatkan 512,100.00
A.11.06 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3
BAHAN :
Bak Fibreglass 1.0000 bh 200,000.00 200,000.00
Perlengkapan 0.1800 hrg bak 200,000.00 36,000.00
Jumlah Bahan 236,000.00
UPAH :
Pekerja 1.8000 Oh 65,000.00 117,000.00
Tukang Batu 2.7000 Oh 85,000.00 229,500.00
Kepala Tukang 0.5400 Oh 90,000.00 48,600.00
Mandor 0.1100 Oh 100,000.00 11,000.00
Jumlah Pekerja 406,100.00
Jumlah Bahan + Pekerja 642,100.00
Jumlah Total 642,100.00
Dibulatkan 642,100.00
A.12.08 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75"
BAHAN :
Pipa PVC 1.2000 m' 9,500.00 11,400.00
Perlengkapan 0.3500 hrg pipa 9,500.00 3,325.00
Jumlah Bahan 14,725.00
UPAH :
Pekerja 0.0360 Oh 65,000.00 2,340.00
Tukang Batu 0.0600 Oh 85,000.00 5,100.00
Kepala Tukang 0.0060 Oh 90,000.00 540.00
Mandor 0.0018 Oh 100,000.00 180.00
Jumlah Pekerja 8,160.00
Jumlah Bahan + Pekerja 22,885.00
Jumlah Total 22,885.00
Dibulatkan 22,800.00

19 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.12.13 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"
BAHAN :
Pipa PVC 1.2000 m' 62,500.00 75,000.00
Perlengkapan 0.3500 hrg pipa 62,500.00 21,875.00
Jumlah Bahan 96,875.00
UPAH :
Pekerja 0.0810 Oh 65,000.00 5,265.00
Tukang Batu 0.1350 Oh 85,000.00 11,475.00
Kepala Tukang 0.0135 Oh 90,000.00 1,215.00
Mandor 0.0041 Oh 100,000.00 410.00
Jumlah Pekerja 18,365.00
Jumlah Bahan + Pekerja 115,240.00
Jumlah Total 115,240.00
Dibulatkan 115,200.00
A.12.14 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"
BAHAN :
Pipa PVC 1.2000 m' 87,500.00 105,000.00
Perlengkapan 0.3500 hrg pipa 87,500.00 30,625.00
Jumlah Bahan 135,625.00
UPAH :
Pekerja 0.0810 Oh 65,000.00 5,265.00
Tukang Batu 0.1350 Oh 85,000.00 11,475.00
Kepala Tukang 0.0135 Oh 90,000.00 1,215.00
Mandor 0.0041 Oh 100,000.00 410.00
Jumlah Pekerja 18,365.00
Jumlah Bahan + Pekerja 153,990.00
Jumlah Total 153,990.00
Dibulatkan 153,900.00
A.12.16 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"
BAHAN :
Kran Air 1.0000 bh 30,000.00 30,000.00
Seal tape 0.0250 bh 3,000.00 75.00
Jumlah Bahan 30,075.00
UPAH :
Pekerja 0.0100 Oh 65,000.00 650.00
Tukang Batu 0.1000 Oh 85,000.00 8,500.00
Kepala Tukang 0.0100 Oh 90,000.00 900.00
Mandor 0.0005 Oh 100,000.00 50.00
Jumlah Pekerja 10,100.00
Jumlah Bahan + Pekerja 40,175.00
Jumlah Total 40,175.00
Dibulatkan 40,100.00

20 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.12.17 MEMASANG 1 BH FLOOR DRAIN
BAHAN :
Floordrain 1.0000 bh 28,000.00 28,000.00

Jumlah Bahan 28,000.00


UPAH :
Pekerja 0.0100 Oh 65,000.00 650.00
Tukang Batu 0.1000 Oh 85,000.00 8,500.00
Kepala Tukang 0.0100 Oh 90,000.00 900.00
Mandor 0.0005 Oh 100,000.00 50.00
Jumlah Pekerja 10,100.00
Jumlah Bahan + Pekerja 38,100.00
Jumlah Total 38,100.00
Dibulatkan 38,100.00
A.13.03 1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)
Galian tanah 2.2500 m 63,000.00 141,750.00
Pasir urug 0.1071 m 116,500.00 12,477.15
Lantai kerja 1.1250 m 618,050.00 695,306.25
Pas. bata 1 PC : 2 PS + Plesteran 7.5000 m 143,347.50 1,075,106.25
Plat beton penutup & balok 0.1500 m 3,800,825.05 570,123.76
Pipa PVC 4" jenis AW + sambungan 9.0000 m1 50,000.00 450,000.00
Pipa GIP1/2" 0.6000 btg 15,000.00 9,000.00
Galian tanah untuk rembesan 1.6875 m 63,000.00 106,312.50
Pas. injuk 2.7000 kg 17,500.00 47,250.00
Urugan kerikil 3,5 cm 0.5250 m 150,000.00 78,750.00
Pipa PVC 4" berlobang jenis AW 9.0000 m1 50,000.00 450,000.00
Urugan kembali perataan tanah 0.5625 m 17,080.00 9,607.50
Jumlah 3,645,683.41
Jumlah 3,645,683.41
Dibulatkan 3,645,600.00
A.14.01 1 BUAH PASANG KUNCI TANAM BIASA
BAHAN :
Kunci Tanam biasa 1.0000 bh 90,000.00 90,000.00
Jumlah Bahan 90,000.00
UPAH :
Pekerja 0.0100 Oh 65,000.00 650.00
Tukang Kayu 0.5000 Oh 85,000.00 42,500.00
Kepala Tukang 0.0100 Oh 90,000.00 900.00
Mandor 0.0050 Oh 100,000.00 500.00
Jumlah Pekerja 44,550.00
Jumlah Bahan + Pekerja 134,550.00
Jumlah Total 134,550.00
Dibulatkan 134,500.00

21 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.14.04 1 BUAH PASANG ENGSEL PINTU
BAHAN :
Engsel pIntu 1.0000 bh 18,000.00 18,000.00
Jumlah Bahan 18,000.00
UPAH :
Pekerja 0.0150 Oh 65,000.00 975.00
Tukang Kayu 0.1500 Oh 85,000.00 12,750.00
Kepala Tukang 0.0150 Oh 90,000.00 1,350.00
Mandor 0.00075 Oh 100,000.00 75.00
Jumlah Pekerja 15,150.00
Jumlah Bahan + Pekerja 33,150.00
Jumlah Total 33,150.00
Dibulatkan 33,100.00
A.14.05 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU
BAHAN :
Engsel Jendela 1.0000 bh 11,000.00 11,000.00
Jumlah Bahan 11,000.00
UPAH :
Pekerja 0.0100 Oh 65,000.00 650.00
Tukang Kayu 0.1000 Oh 85,000.00 8,500.00
Kepala Tukang 0.0100 Oh 90,000.00 900.00
Mandor 0.00050 Oh 100,000.00 50.00
Jumlah Pekerja 10,100.00
Jumlah Bahan + Pekerja 21,100.00
Jumlah Total 21,100.00
Dibulatkan 21,100.00
A.14.06 1 BUAH PASANG KAIT ANGIN
BAHAN :
Kait Angin 1.0000 ps 10,000.00 10,000.00
Jumlah Bahan 10,000.00
UPAH :
Pekerja 0.0200 Oh 65,000.00 1,300.00
Tukang Kayu 0.2000 Oh 85,000.00 17,000.00
Kepala Tukang 0.0200 Oh 90,000.00 1,800.00
Mandor 0.01000 Oh 100,000.00 1,000.00
Jumlah Pekerja 21,100.00
Jumlah Bahan + Pekerja 31,100.00
Jumlah Total 31,100.00
Dibulatkan 31,100.00
A.14.08 1 BUAH PASANG KUNCI SELOT
BAHAN :
Kunci Selot 1.0000 bh 15,000.00 15,000.00
Jumlah Bahan 15,000.00
UPAH :
Pekerja 0.0200 Oh 65,000.00 1,300.00
Tukang Kayu 0.2000 Oh 85,000.00 17,000.00
Kepala Tukang 0.0200 Oh 90,000.00 1,800.00
Mandor 0.00100 Oh 100,000.00 100.00
Jumlah Pekerja 20,200.00
Jumlah Bahan + Pekerja 35,200.00
Jumlah Total 35,200.00
Dibulatkan 35,200.00

22 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.14.09 1 BUAH PASANG TARIKAN PINTU
BAHAN :
Tarikan Pintu 1.0000 bh 30,000.00 30,000.00
Jumlah Bahan 30,000.00
UPAH :
Pekerja 0.0500 Oh 65,000.00 3,250.00
Tukang Kayu 0.5000 Oh 85,000.00 42,500.00
Kepala Tukang 0.0500 Oh 90,000.00 4,500.00
Mandor 0.00250 Oh 100,000.00 250.00
Jumlah Pekerja 50,500.00
Jumlah Bahan + Pekerja 80,500.00
Jumlah Total 80,500.00
Dibulatkan 80,500.00
A.15.02 1 M2 PASANG KACA, TEBAL 5 MM
BAHAN :
Kaca 1.1000 m2 60,000.00 66,000.00
Jumlah Bahan 66,000.00
UPAH :
Pekerja 0.0150 Oh 65,000.00 975.00
Tukang Kayu 0.1500 Oh 85,000.00 12,750.00
Kepala Tukang 0.0150 Oh 90,000.00 1,350.00
Mandor 0.00075 Oh 100,000.00 75.00
Jumlah Pekerja 15,150.00
Jumlah Bahan + Pekerja 81,150.00
Jumlah Total 81,150.00
Dibulatkan 81,100.00
A.16.05 1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x)
BAHAN :
Cat tembok Sanlex / Sekelas Sanlex 0.1750 kg 11,000.00 1,925.00
Plamir tembok 0.1600 kg 14,000.00 2,240.00
Rol cat 0.0100 bh 22,000.00 220.00
Ampelas 0.5000 lbr 2,500.00 1,250.00
Jumlah Bahan 5,635.00
UPAH :
Pekerja 0.1040 org 65,000.00 6,760.00
Tk. cat 0.0182 org 85,000.00 1,547.00
Kep. tukang cat 0.0090 org 90,000.00 810.00
Mandor 0.0045 org 100,000.00 450.00
Jumlah Pekerja 9,567.00
Jumlah Bahan + Pekerja 15,202.00
Jumlah 15,202.00
Dibulatkan 15,200.00

23 dari 50
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
A.16.07 1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x)
BAHAN :
Cat tembok Sanlex / Sekelas Sanlex 0.2000 kg 11,000.00 2,200.00
Plamir tembok 0.1600 kg 14,000.00 2,240.00
Rol cat 0.0100 bh 22,000.00 220.00
Ampelas 0.5000 lbr 2,500.00 1,250.00
Jumlah Bahan 5,910.00
UPAH :
Pekerja 0.2000 org 65,000.00 13,000.00
Tk. cat 0.0280 org 85,000.00 2,380.00
Kep. tukang cat 0.0150 org 90,000.00 1,350.00
Mandor 0.0090 org 100,000.00 900.00
Jumlah Pekerja 17,630.00
Jumlah Bahan + Pekerja 23,540.00
Jumlah 23,540.00
Dibulatkan 23,500.00
A.16.08 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI
BAHAN :
Meni kayu 0.1670 kg 22,000.00 3,674.00
Plamir kayu 0.0830 kg 15,000.00 1,245.00
Cat kayu sekelas SEIV 0.2000 kg 65,000.00 13,000.00
Amplas kayu 0.4000 lbr 2,500.00 1,000.00
Minyak cat terpentin 0.1500 ltr 9,000.00 1,350.00
Kwas 3" 0.0500 bh 10,000.00 500.00
Jumlah Bahan 20,769.00
UPAH :
Pekerja 0.2000 org 65,000.00 13,000.00
Tk. Cat 0.0600 org 85,000.00 5,100.00
Kep. tukang cat 0.0300 org 90,000.00 2,700.00
Mandor 0.0100 org 100,000.00 1,000.00
Jumlah Pekerja 21,800.00
Jumlah Bahan + Pekerja 42,569.00
Jumlah 42,569.00
Dibulatkan 42,500.00

24 dari 50
DAFTAR SATUAN HARGA BAHAN

Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.

A AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug m 80,000.00
2 Sirtu m 90,000.00
3 Pasir Pasang Kali m 110,000.00
4 Pasir Beton m 130,000.00
5 Abu Batu / Screen m 105,000.00
6 Batu Gosok ( Apung ) kg 14,000.00
8 Screen m 130,000.00
9 Batu belah 15-20 m 110,000.00
14 Kerikil Sungai Ayak Tanpa Pasir m 100,000.00
15 Batu Pecah Mesin 1/2 m 170,000.00
16 Batu Pecah Mesin 2/3 m 160,000.00
17 Batu Pecah Mesin 3/5 m 150,000.00
18 Batu Pecah Mesin 5/7 m 140,000.00
19 Batu Belah 10 - 15 cm m 115,000.00
20 Batu Belah 7 - 10 cm m 125,000.00
21 Batu Bronjol ( Untuk Bronjong ) m 110,000.00
22 Batu Tempel Hitam m 160,000.00
23 Batu Pinggir Beton 10 x 20 x 35 bh 17,000.00
24 Batu Pinggir Beton 15 x 35 x 50 ( K -225 ) bh 42,000.00
25 Batu Telor m 140,000.00
26 Batako kecil 8 x 10 x 20 bh 1,300.00
27 Batako Besar 8 x 20 x 30 bh 4,000.00
28 Con Blok 8 x 20 x 40 (Holowblock) bh 3,000.00
29 Bata Merah Bakar Kelas I bh 750.00
30 Bata Merah Bakar Kelas II bh 500.00
31 Bata Merah Oven bh 2,500.00
32 Roster Beton 20 x 20 bh 4,000.00
33 Roster Beton 30 x 30 bh 7,000.00
34 Grass Blok 20 x 20 bh 20,000.00
35 Grass Blok 30 x 30 bh 25,000.00
36 Paving Blok Natural bh 1,300.00
37 Paving Blok Warna bh 1,500.00
38 Paving Blok Natural 6 cm m 38,000.00
39 Paving Blok Warna 6 cm m 42,500.00
40 Paving Blok Natural 8 cm m 45,000.00
41 Paving Blok Warna 8 cm m 50,000.00
42 a. Bentuk Hexagonal (1m2 = 27 bh) bh 1,300.00
43 b. Bentuk Tiga Berlian (1m2 = 50 bh) bh 1,200.00
44 c. Bentuk Segi Panjang (1m2 = 50 bh) bh 1,200.00

25 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
45 Paving Blok Biasa bh 1,200.00
46 Kanstin Paving Blok bh 45,000.00
47 Semen PC / 50 kg *M080 zak 62,500.00
48 Semen PC Kg 1,250.00
49 Semen Putih zak 90,000.00
50 Kanstin Jalan ukuran Besar ( bina Marga ) 1 bh = 50 cm bh 37,000.00
51 Kanstin Jalan ukuran 1 bh = 50 cm, tinggi 20 cm bh 22,500.00
52 Kanstin Jalan ukuran Besar ( bina Marga K - 300 ) 1 bh = 50 cm bh 50,000.00
53 Readymix Beton K 350, tanpa pompa ( selang ) 1,000,000.00
54 Readymix Beton K 300, tanpa pompa ( selang ) m 975,000.00
55 Readymix Beton K 225, tanpa pompa ( selang ) m 950,000.00
56 Readymix Beton K 175, tanpa pompa ( selang ) m 900,000.00
57 Kapur Pasang/ kapur tembok m 60,000.00
58 Kapur Sirih kg 1,500.00
59 Semen Warna kg 7,000.00
60 Tanah Liat m 37,000.00
61 Tanah Urug (dilokasi) m 25,000.00
62 Rumput m 45,000.00
63 Rumput Gajah Kerdil m 23,500.00
64 Rumput Jepang m 23,500.00
65 Pohon Cemara Udang T= 2 m' btg 325,000.00
66 Pohon Cemara Lilin btg 175,000.00
67 Bunga Teh-tehan bulat daun hujau plbk 30,000.00
68 Bunga Kriminil plbk 10,000.00
69 Bunga Hiris plbk 7,500.00
70 Pohon Palm Raja btg 500,000.00
71 Pohon Palm Botol Besar btg 750,000.00
72 Teh-tehan daun kuning plbk 30,000.00
73 Bunga Coleus Hibrida ( beragam jenis ) plbk 50,000.00
74 Pupuk Kompos kg 1,500.00
75 Hollow Block 20 bh 3,000.00
76 Hollow Block 15 bh 2,400.00
77 Hollow Block 10 bh 1,900.00
78 Roster Terawang Keramik bh 30,000.00
79 Batu Candi m2 95,000.00
80 Batu Sikat 0,5 / 2 cm m2 100,000.00

26 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
B BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
1 Plamir Tembok kg 14,000.00
2 Cat Tembok ICI Eksterior ( BETON ) kg 40,000.00
3 Cat Tembok Kelas II kg 10,000.00
4 Cat Tembok ICI Interior ( PLAFOND DAN DINDING ) lt 30,000.00
5 Cat Tembok Vinilex kg 15,000.00
6 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt 95,000.00
7 Cat Tembok Sanlex kg 11,000.00
8 Cat Genteng kg 25,000.00
9 Cat Tahan Asam kg 50,000.00
10 Cat Berkilat/Cat kayu kg 55,000.00
11 Plamir Kayu kg 15,000.00
12 Rool Cat Tembok bh 22,000.00
13 Kape Tembok bh 9,000.00
14 Kape Kayu bh 7,000.00
15 Soligneum 1 blek 5 lt 63,000.00
16 Plincote kg 30,000.00
17 Pengawetan Kayu m 45,000.00
18 Pengopenan Kayu m 650,000.00
19 Kwas 3" bh 10,000.00
20 Kwas 2' bh 7,000.00
21 Oker kg 40,000.00
22 Oyan bks 4,500.00
23 Oten (Pewarna Plitur ) bks 4,500.00
24 Spirtus lt 11,000.00
25 Bahan Plitur Kripik ( Sirlak India ) kg 24,000.00
26 Dempul Lilin kg 23,000.00
27 Dempul Plitur kg 3,500.00
28 Dempul Halus / Imfra ( Wood Filler ) kg 45,000.00
29 Terpentin lt 9,000.00
30 Tiner A lt 16,000.00
31 Tiner B lt 25,000.00
32 Kumpon kg 24,000.00
33 Melamik kg 45,000.00
34 Impra kg 40,000.00
35 Dempul Plastik kg 35,000.00
36 Dempul Duco kg 36,000.00
37 Ampelas lbr 2,500.00
38 Dempul Kayu Cap Kucing kg 28,000.00
39 Meni Kayu / Besi kg 22,000.00
40 Meni Sincromat kg 25,000.00
41 Cat Kayu Sieve kg 65,000.00
42 Cat Besi Sieve kg 65,000.00
43 Cat Besi Duco Danaglos/ICI kg 75,000.00
44 Cat Bron kg 65,000.00

27 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
45 Sirlak kg 70,000.00
46 Lem Fox bh 16,000.00
C BAHAN KAYU BERIKUT BAHAN JADINYA
1 Bambu Biasa bt 7,000.00
2 Bambu 5 s.d 7 bt 9,000.00
3 Bambu 7 s.d 10 bt 10,000.00
4 Bambu Gombong bt 33,000.00
5 Rucuk Bambu bt 3,500.00
6 Kayu untuk Perancah m 1,750,000.00
7 Kayu untuk Kontruksi Jembatan m
8 Kayu Kamper Singkil / Kapur (K. Samarinda Klas II) m 8,000,000.00
9 Kayu Balok Lokal Kelas II m 2,750,000.00
10 Kayu Papan Lokal Kelas II m 3,000,000.00
11 Kayu Balok Kamper m 7,500,000.00
12 Kayu Papan Kamper m 8,000,000.00
13 Kayu Balok Borneo Super m 4,500,000.00
14 Kayu Papan Borneo Super m 5,000,000.00
15 Kayu Balok Kruing m 4,000,000.00
16 Kayu Balok Kamper Medan m 6,000,000.00
17 Kayu Papan Kamper Medan m 6,500,000.00
18 Kayu Balok Kamper Banjar m 6,500,000.00
19 Kayu Papan Kamper Banjar m 7,000,000.00
20 Kayu Balok Kamper Samarinda m 7,500,000.00
21 Kayu Papan Kamper Samarinda m 8,000,000.00
22 Kayu Balok Rasamala m 4,800,000.00
23 Kayu Hutan Kelas I ( Segeng, Mahoni, Laban ) m 3,000,000.00
24 Kayu Balok Albasiah m 2,200,000.00
25 Kayu Papan Albasia m 2,200,000.00
26 Kayu Kruing m 3,500,000.00
27 Kayu Papan Borneo m 4,500,000.00
28 Dolken 8 s/d 10 uk.4m' bt 75,000.00
29 Dolken 7 s/d 10 bt 75,000.00
30 List profil kamper 1 cm m1 3,000.00
31 List profil kamper 2 cm m1 3,500.00
32 List profil kamper 4 cm m1 4,000.00
33 List profil kamper 5 cm m1 6,000.00
34 List profil kamper 10 cm m1 36,000.00
35 Pegangan Tangga profil Jati m1 300,000.00
36 Pegangan Tangga profil Kamper m1 130,000.00
37 Kayu Reng 2/3 Borneo m1 1,800.00
38 Kayu Reng 2/3 Kamper Banjar m1 3,000.00
39 Kayu Reng 3/4 Kamper Banjar m1 4,800.00
40 Reng Kayu Kls II m1 1,400.00
41 List profil Kayu Lokal KLs II 4 cm m1 3,000.00

28 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
D BAHAN PENUTUP RANGKA PLAFOND
1 Bahan plafond Enternit 4 mm m 10,000.00
2 Bahan plafond hardpleks 5 mm 120 x 240 lbr 120,000.00
3 Bahan plafond Asbes Semen 5 mm m 9,000.00
4 Gypsum 120 x 240 t = 9 mm ex DN lbr 70,000.00
5 Gypsum 120 x 240 t = 9 mm ex Luar lbr 85,000.00
6 Acustik Amstrong 60 x 120 lbr 130,000.00
7 GRC 120 x 240 lbr 55,000.00

E BAHAN KAYU LAPIS


1 Triplek 3 mm 120 x 240 lbr 50,000.00
2 Triplek 4 mm 120 x 240 lbr 60,000.00
3 Triplek 4 mm Ukuran Pintu lbr 40,000.00
4 Triplek 6 mm 120 x 240 lbr 90,000.00
5 Jabar Wood 4 mm lbr 75,000.00
6 Plywood 18 mm 120 x 240 lbr 290,000.00
7 Plywood 4 mm 120 x 240 lbr 120,000.00
8 Plywood 3 mm 120 x 240 lbr 72,000.00
9 Plywood 3 mm ukuran Pintu lbr 65,000.00
10 Plywood 4 mm ukuran Pintu lbr 80,000.00
11 Bilik Bambu ( tanpa kulit ) m 6,000.00
12 Bilik Bambu ( dengan kulit ) m 14,000.00
13 Bilik Bambu Hitam Variasi m 20,000.00
14 Wall Paper ( kls menengah ) m 50,000.00
15 Multiplek 9 mm 120 x 240 lbr 120,000.00
16 Multiplek 12 mm 120 x 240 lbr 160,000.00
17 Multiplek 18 mm 120 x 240 lbr 230,000.00
18 Teak Wood 3 mm 120 x 240 lbr 120,000.00
19 Teak Wood 4 mm 120 x 240 lbr 135,000.00
20 Teak Wood 3 mm 120 x 240 Ukuran Pintu lbr 80,000.00
21 Teak Wood ukuran Pintu 4 mm lbr 100,000.00
22 Tacon ( tahan bakar ) m 125,000.00
23 Supercon m 65,000.00
24 Melamin 4 mm 120 x 240 lbr 150,000.00
25 Melamin TIK 4 mm lbr 220,000.00
26 Formika 120 x 240 lbr 200,000.00
27 Formika Ukuran Pintu lbr 130,000.00

29 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
F BAHAN LANTAI DAN PELAPIS DINDING
1 Poslin 11 x 11 Warna Standar DN m 50,000.00
2 Poslin 11 x 11 Warna Khusus DN m 55,000.00
3 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos m 45,000.00
4 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip m 50,000.00
5 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip m 50,000.00
6 Keramik 20 x 20 (KM) KWI DN Putih Polos m 45,000.00
7 Keramik 20 x 25 Dinding KM KWI DN Corak m 50,000.00
8 Keramik 30 x 30 KW I DN putih polos m 45,000.00
9 Keramik 30 x 30 KW I DN Warna/Corak / Anti Slip m 55,000.00
14 Keramik 40 x 40 cm dus 65,000.00
15 Keramik 60 x 60 cm dus 80,000.00
16 Keramik Mozaik 30 x 30 cm dus 75,000.00
17 Vinyl Lantai standar m 30,000.00
18 Stairnosing keramik 10/20 bh 10,000.00
19 Stairnosing fiber m' 24,000.00
20 Taraso Kerang 30 x 30 m 35,000.00
21 Plin Taraso 10 x 30 bh 7,000.00
31 Bata Karawang bh 6,500.00
32 Campuran untuk Kedap Air (AM) ltr 35,000.00
33 Lantai Parket m 450,000.00
34 Stepnozing m' 17,000.00
35 Plint Keramik 5/20 bh 6,000.00
36 Keramik Lantai Antislip sekualitas Romance KW I Warna 33x33 cm m2 75,000.00
37 Keramik Lantai sekualitas Romance KW I Warna 33x33 cm m2 70,000.00

G BAHAN SALURAN AIR KOTOR / BERSIH


1 Grafel 1/2 d.20 cm m1 21,000.00
2 Grafel 1/2 d.30 cm m1 28,000.00
3 Grafel 1/2 d.40 cm m1 50,000.00
4 Buis Beton 20 cm ( 1 m' ) m1 40,000.00
5 Buis Beton 30 cm ( 1 m' ) bh 55,000.00
6 Buis Beton 40 cm ( 1 m' ) bh 75,000.00
7 Buis Beton 50 cm ( 1 m' ) bh 115,000.00
8 Buis Beton 60 cm ( 1 m' ) *M031 bh 150,000.00
9 Buis Beton 100 cm ( 0.50 m ) *M035 bh 200,000.00
10 Buis Beton 80 cm ( 0.50 m ) *M033 bh 135,000.00
11 Buis Tanah 10 cm ( 0.50 m ) bh 12,000.00
12 Buis Tanah 15 cm ( 0.50 m ) bh 14,000.00
13 Buis Tanah 20 cm ( 0.50 m ) bh 20,000.00
14 Buis Tanah 25 cm ( 0.50 m ) bh 22,000.00
15 Injuk kg 17,500.00

30 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
H BAHAN LOGAM DAN BAHAN JADINYA
1 Besi Beton U-24 Rata - Rata *M167' < 22 mm kg 11,000.00
2 Besi Beton U-24 Rata - Rata *M167' > 22 mm kg 11,000.00
3 Besi Beton U-39 / U-32 Rata - Rata *M167 kg 12,000.00
6 Pagar BRC m 135,000.00
7 Pintu Pagar BRC Swing Tunggal/Ganda EP m 275,000.00
8 Tiang Pagar Dia. 2" ( Tanpa Pondasi ) + Tutup bh 115,000.00
9 Mur-Baut bh 1,500.00
10 U-Clip/Klem bh 750.00
11 Bondek m 150,000.00
12 Ongkos Galfanis Besi kg 7,000.00
13 Kawat Duri m1 2,400.00
14 Kawat Pengikat m1 21,000.00
15 Kawat Tembaga kg 6,000.00
16 Baja Siku / Profil DN kg 13,000.00
17 Baja IWF DN SII kg 14,000.00
18 Baja IWF Jepang kg 15,000.00
19 Kawat Beton *M168 kg 21,000.00
20 Kawat Bronjong 4 mm *M162 kg 13,000.00
21 Besi Galvanisir * M164 kg 38,000.00
22 Baja Tralis *M161 kg 17,000.00
23 Ram Nyamuk Hijau m 12,000.00
24 Ram Kawat 1 x 1 cm m 12,000.00
25 Ram Ayam m 15,000.00
26 Kawat Kasa 1 x 1 cm ( Putih ) m 13,500.00
27 Kawat Harmonika 4 cm m 25,000.00
28 Kawat Harmonika 2 cm m 30,000.00
29 Kawat Las Listrik kg 30,000.00
30 Wiremesh M8 m 50,000.00
31 Wiremesh M6 m 40,000.00
32 Plat Srip 2 x 30 mm ( 6 m1) bt 40,000.00
33 Plat Srip 3 x 30 mm ( 6 m1) bt 75,000.00
34 Plat Alumunium 0.1 mm m 50,000.00
35 Plat Alumunium 0.2 mm m 85,000.00
36 Plat Alumunium 0.3 mm m 120,000.00
37 Plat Alumunium 0.4 mm m 135,000.00
38 Plat Alumunium 0.5 mm m 160,000.00
39 Plat Alumunium 0.6 mm m 180,000.00
40 Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " ) m1 150,000.00
41 Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " ) m1 190,000.00
42 Kusen Alumunium 4" CA m1 85,000.00
43 Handle Alumunium ( Tarikan Pintu Alumunium ) bh 95,000.00
44 Kait Angin alumunium ps 95,000.00
45 Karet Asisoris Kusen / Pintu Alumunium m1 4,000.00

31 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
46 Seng Plat BJLS dia. 60 cm ( 100 m1 ) m1 28,000.00
47 Seng Plat BJLS dia. 90 cm ( 100 m1 ) m1 35,000.00
48 Plat Besi Tipis 1 mm kg 13,000.00
49 Plat Besi Tipis 0.5 mm kg 13,000.00
50 Plat Besi 2 mm s/d 5 mm kg 13,000.00
51 Plat Besi 6 mm s/d 10 mm kg 13,000.00
52 Plat Besi 10 mm Ke atas kg 13,000.00
53 Lem Kuning (aibond) kg 50,000.00
54 Lem Fox kg 15,000.00
55 Rolling door Besi m2 550,000.00
56 Pintu Aluminium m2 210,000.00
57 Pintu Swing 5 mm unt 1,100,000.00
58 Pintu Swing 8 mm unt 1,800,000.00
59 Teralis Besi strip m2 125,000.00
60 Besi Teralis m2 550,000.00

I BAHAN KACA
1 Kaca Polos 2 mm m 45,000.00
2 Kaca Polos 3 mm m 50,000.00
3 Kaca Polos 5 mm m 60,000.00
4 Kaca Polos Tebal 8 mm m 180,000.00
5 Kaca Polos Tebal 12 mm m 250,000.00
6 Kaca Rayband 5 mm ( ASAHI ) m 65,000.00
7 Kaca Rayband 8 mm ( ASAHI ) m 600,000.00
8 Kaca Rayband 12 mm ( ASAHI ) m 900,000.00
9 Kaca Patri Lokal Terpasang ( ASAHI ) m 365,000.00
10 Kaca Patri EX Luar negeri terpasang m 1,500,000.00
11 Glass Block DN 20 x 20 bh 25,000.00
12 Glass Block 20 x 20 Ex LN bh 80,000.00

J BAHAN PAKU DAN MUR BAUT


1 Paku 3 cm kg 18,000.00
2 Paku 5 cm s/d 7 cm / Paku Reng - Usuk kg 18,000.00
3 Paku 8 cm s/d 12 cm kg 18,000.00
4 Paku 2 cm s/d 4 cm /Paku Tripleks - Bilik kg 18,000.00
5 Paku 1/2 cm s/d 1 cm /Paku seng-Plat Poil kg 18,000.00
6 Paku Beton 2 cm s/d 5 cm kg 24,000.00
7 Paku Kait Lengkap bh 1,000.00
8 Paku Cacing kg 18,000.00
9 Paku Seng Glb. / Paku Asbes Glb. kg 20,000.00
10 Paku Skrup kg 9,000.00
11 Besi Beugel kuda - kuda kg 14,000.00
12 Duk Angker kg 14,000.00
13 Angker Mur Baut dia.19 / panjang 60 cm bh 18,000.00
14 Mur Baut HTB dia. 19 s/d 16 (5 cm) bh 6,000.00
15 Mur Baut Biasa dia.19 s/d 16 (5 cm) bh 4,000.00

32 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
16 Piser dia. 12 s/d 20 cm bh 3,000.00

K BAHAN PERPIPAAN
1 Besi Pipa untuk Hydrant BSP 1" bt 100,000.00
2 Besi Pipa untuk Hydrant BSP 1,25" bt 115,000.00
3 Besi Pipa untuk Hydrant BSP 1,5" bt 130,000.00
4 Besi Pipa untuk Hydrant BSP 2" bt 150,000.00
5 Besi Pipa untuk Hydrant BSP 2,5" bt 440,000.00
6 Besi Pipa untuk Hydrant BSP 3" bt 600,000.00
7 Besi Pipa untuk Hydrant BSP 4" bt 850,000.00
8 Besi Pipa untuk Hydrant BSP 6" bt 1,500,000.00
9 Hydrant bh 270,000.00
10 Besi Pipa Hitam 1" t=2 mm bt 90,000.00
11 Besi Pipa Hitam 2" t=2 mm bt 180,000.00
12 Besi Pipa Hitam 3" t=2 mm bt 320,000.00
13 Besi Pipa Hitam 4" t=2 mm bt 400,000.00
14 Besi Pipa Hitam 6" t=2 mm bt 550,000.00
15 Pipa GIP Medium A 1/2" ( 6 m1 ) bt 90,000.00
16 Pipa GIP Medium A 3/4" ( 6 m1 ) bt 105,000.00
17 Pipa GIP Medium A 1" ( 6 m1 ) bt 160,000.00
18 Pipa GIP Medium A 1 1/4" ( 6 m1 ) bt 200,000.00
19 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt 240,000.00
20 Pipa GIP Medium A 1 3/4"( 6 m1 ) bt 300,000.00
21 Pipa GIP Medium A 2" ( 6 m1 ) bt 360,000.00
22 Pipa GIP Medium A 2 1/2" ( 6 m1 ) bt 500,000.00
23 Pipa GIP Medium A 3" ( 6 m1 ) bt 600,000.00
24 Pipa GIP Medium A 4" ( 6 m1 ) bt 800,000.00
25 Macam2 Sambungan GIP 1/2" bh 4,000.00
26 Macam2 Sambungan GIP 3/4" bh 7,000.00
27 Macam2 Sambungan GIP 1" bh 10,000.00
28 Macam2 Sambungan GIP 1 1/4" bh 13,000.00
29 Macam2 Sambungan GIP 1 1/2" bh 14,000.00
30 Macam2 Sambungan GIP 1 3/4" bh 22,000.00
31 Macam2 Sambungan GIP 2" bh 30,000.00
32 Macam2 Sambungan GIP 2 1/2" bh 42,000.00
33 Macam2 Sambungan GIP 3" bh 55,000.00
34 Macam2 Sambungan GIP 4" bh 60,000.00
35 Pipa PVC RUCIKA type AW 1/2" bt 25,000.00
36 Pipa PVC RUCIKA type AW 3/4" bt 38,000.00
37 Pipa PVC RUCIKA type AW 1" bt 48,000.00
38 Pipa PVC RUCIKA type AW 1 1/4" bt 65,000.00
39 Pipa PVC RUCIKA type AW 1 1/2" bt 85,000.00
40 Pipa PVC RUCIKA type AW 2" bt 135,000.00
41 Pipa PVC RUCIKA type AW 2 1/2" bt 160,000.00
42 Pipa PVC RUCIKA type AW 3" bt 250,000.00
43 Pipa PVC RUCIKA type AW 4" bt 350,000.00

33 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
44 Pipa PVC RUCIKA type AW 6" bt 700,000.00
45 Pipa PVC RUCIKA type AW 8" bt 1,000,000.00

34 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
46 Pipa PVC MASPION ABU 1/2" (AW) bt 16,000.00
47 Pipa PVC MASPION ABU 3/4" (AW) bt 22,000.00
48 Pipa PVC MASPION ABU 1" (AW) bt 27,000.00
49 Pipa PVC MASPION ABU 1 1/4" (AW) bt 38,000.00
50 Pipa PVC MASPION ABU 1 1/2" (AW) bt 48,000.00
51 Pipa PVC MASPION ABU 2" (AW) bt 85,000.00
52 Pipa PVC MASPION ABU 2 1/2" (AW) bt 105,000.00
53 Pipa PVC MASPION ABU 3" (AW) bt 160,000.00
54 Pipa PVC MASPION ABU 4" (AW) bt 200,000.00
55 Pipa PVC MASPION ABU 6" (AW) bt 620,000.00
56 Knie PVC Diameter 0,5" bh 2,000.00
57 Knie PVC Diameter 0,75" bh 2,000.00
58 Knie PVC Diameter 1" bh 4,000.00
59 Knie PVC Diameter 2" bh 15,000.00
60 Knie PVC Diameter 3" bh 20,000.00
61 Knie PVC Diameter 4" bh 55,000.00
62 Tee PVC Diameter 0,5" bh 2,000.00
63 Tee PVC Diameter 0,75" bh 2,000.00
64 Tee PVC Diameter 1" bh 4,000.00
65 Tee PVC Diameter 2" bh 6,000.00
66 Tee PVC Diameter 3" bh 8,000.00
67 Tee PVC Diameter 4" bh 14,000.00
68 Kran Diameter 0,5" bh 30,000.00
69 Fiet Kran Diameter 0,5" bh 45,000.00
70 Fiet Kran Diameter 0,75" bh 75,000.00
71 Fiet Kran Diameter 1" bh 120,000.00
72 Fiet Kran Diameter 2" bh 430,000.00
73 Fiet Kran Diameter 3" bh 890,000.00
74 Fiet Kran Diameter 4" bh 1,890,000.00
75 Macam2 Sambungan Paralon 1/2" bh 5,000.00
76 Macam2 Sambungan Paralon 3/4" bh 5,000.00
77 Macam2 Sambungan Paralon 1" bh 18,000.00
78 Macam2 Sambungan Paralon 1 1/4" bh 20,000.00
79 Macam2 Sambungan Paralon 1 1/2" bh 20,000.00
80 Macam2 Sambungan Paralon 1 3/4" bh 20,000.00
81 Macam2 Sambungan Paralon 2" bh 20,000.00
82 Macam2 Samb. Paralon 2 1/2" bh 20,000.00
83 Macam2 Samb. Paralon 3" bh 50,000.00
84 Macam2 Samb. Paralon 4" bh 60,000.00
85 Sambungan Pipa PVC Jenis AW 4 " TY bh 35,000.00
86 Lem Paralon bh 7,000.00
87 Solatip Leideng gl 3,000.00
88 Pipa PVC 4" berlobang jenis AW m1 50,000.00

35 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
L BAHAN SANITAIR
1 Stop Kran 1/2 " KIT bh 35,000.00
2 Stop Kran 3/4 " KIT bh 40,000.00
3 Stop Kran 1 " KIT bh 240,000.00
4 Stop Kran 1 1/2 " KIT bh 320,000.00
5 Stop Kran 2 " KIT bh 800,000.00
6 Stop Kran 2 1/2" KIT bh 900,000.00
7 Stop Kran 3 " KIT bh 1,300,000.00
8 Fiet kran 3/4" bh 75,000.00
9 Fiet kran 1" bh 90,000.00
10 Fiet kran 2" bh 250,000.00
11 Fiet kran 3" bh 560,000.00
12 Fiet kran 4" bh 900,000.00
13 Saringan Air Lt KM Stainless Steel bh 48,000.00
14 Apooer Bath Tube bh 280,000.00
15 Kran stain less Lokal Kait bh 60,000.00
16 Shower Dengan Tiang bh 300,000.00
17 Shower Tanpa Tiang bh 140,000.00
18 Kran Tembok Sun Eui dia. 1/2 " bh 105,000.00
19 Kran Tembok ITAP dia. 1/2 " bh 42,000.00
20 Kran Bebek Sun Eui 1/2 " bh 180,000.00
21 Kran Bebek ITAP 1/2 " bh 65,000.00
22 Kran Panas Dingin San Eui Standard bh 240,000.00
23 Bath Cape Washteren unit 2,350,000.00
24 Tempat Sabun Poslin bh 52,000.00
25 Wastafel Lengkap TOTO LW 230 unit 1,400,000.00
26 Wastafel Lengkap INA unit 750,000.00
27 Wastafel Bulat Warna Standard Lengkap unit 1,600,000.00
28 Closet Duduk Poslin (INA) Lengkap set 1,900,000.00
29 Closet Jongkok Poslin (INA) bh 160,000.00
30 Closet Jongkok Teraso bh 95,000.00
31 Closet Jongkok Poslin warna TOTO unit 450,000.00
32 Closet Jongkok Standard Putih Poslin TOTO unit 220,000.00
33 Closet Jongkok Lengkap Sistem Jet TOTO unit 2,250,000.00
34 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 2,400,000.00
35 Closet Duduk Warna Standard lengkap INA bh 1,500,000.00
36 Urinoar Lengkap TOTO Warna Standard lengkap unit 1,750,000.00
37 Penyekat Poslin Urinoar TOTO lbr 450,000.00
38 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh 200,000.00
39 Kitchen Zink Stainless Non Standard Franke ( 1 Lobang ) bh 150,000.00
40 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang ) bh 320,000.00
41 Bak Mandi Teraso bh 280,000.00
42 Bak Mandi Fiber Glass 60 x 60 cm bh 200,000.00
43 Floordrain stainless bh 28,000.00
44 Pintu Fiber bh 425,000.00

36 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
K BAHAN PENUTUP ATAP
1 Atap Plastik Gelombang 80 x 180 lbr 26,000.00
2 Atap Fiber Glass Tipis 80 x 180 (gelombang) lbr 48,000.00
3 Atap Fiber Glass Tebal 80 x 180 (gelombang) lbr 90,000.00
4 Atap Aluminium Natural USR 26 ( JAINDO ) m 160,000.00
5 Atap Aluminium Warna USR 26 ( JAINDO ) m 195,000.00
6 Atap Seng Gelombang BJLS 80 x 180 lbr 40,000.00
7 Atap Asbes Gel. Kecil 4 mm 80 x 180 lbr 39,000.00
8 Bubung Asbes lbr 28,000.00
9 Atap Asbes Gel. 4 mm 90 x 180 lbr 50,000.00
10 Atap Asbes Gel. 5 mm 90 x 180 lbr 60,000.00
11 Atap Asbes Gel. Besar 4 mm 90 x 240 lbr 70,000.00
12 Atap Asbes Gel. Besar 5 mm 90 x 240 lbr 80,000.00
13 Atap Genteng Plentong pres Bakar KW 1 bh 1,500.00
14 Atap Genteng Plentong pres Molen Oven KW1 bh 1,800.00
15 Atap Genteng Flam pres Molen Oven Jatiwangi bh 1,300.00
16 Genting Morando bh 3,000.00
17 Bubung Genteng pres Bulat Ex Jatiwangi bh 5,500.00
18 Genteng Bubungan Ex Jatiwangi Segi Tiga bh 4,000.00
19 Genteng Bubungan Beton bh 5,000.00
20 Genteng Beton Warna 14,5/m2 bh 9,000.00
21 Genteng Beton Natural bh 6,000.00
22 Atap Genteng Beton Warna 14,5/m2 m 95,000.00
23 Genteng Beton Natural m 65,000.00
24 Sirap Kelas I ( 80 / m2 ) bh 22,000.00
25 Sirap m 105,000.00
26 Genteng Keramik bh 9,000.00
27 Genteng Keramik Natural Intan 14,5 / m2 m 84,000.00
28 Genteng Keramik Glasur Standard 14,5 / m2 m 130,000.00
29 Genteng Keramik Glasur Special 14,5 / m2 m 150,000.00
30 Genteng Keramik Glasur Premium 14,5 / m2 m 155,000.00
31 Genteng Murando Natural 1m2 = 18 bh bh 3,000.00
32 Genteng Murando Glasur 1m2 = 20 bh bh 6,000.00
33 Genting Magas bh 2,000.00
34 Bubung Murando Natural bh 5,000.00
35 Bubung Murando Glasur bh 9,000.00
36 Bubungan Genteng Keramik bh 9,000.00
37 Bubungan Genteng Palentong bh 3,000.00
38 Bubungan Genting Flam bh 3,000.00
39 Bubungan Genting Magas eks banjar bh 4,000.00

37 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
L BAHAN ELEKTRIKAL
1 Kabel Twist (2x16 mm) m' 15,000.00
2 Kabel Twist (4x16 mm) m' 20,000.00
3 Kabel Twist (2x10 mm) m' 14,000.00
4 Kabel NYA (1.5 mm) m' 3,000.00
5 Kabel NYA (2.5 mm) m' 5,000.00
6 Kabel NYM (2x1.5 mm) m' 9,000.00
7 Kabel NYM (2x2.5 mm) m' 11,000.00
8 Kabel NYM (3x1.5 mm) m' 13,000.00
9 Kabel NYM (3x2.5 mm) m' 12,000.00
10 Kabel NYM (3x4 mm) m' 16,000.00
11 Kabel NYY (1x35 mm) m' 100,000.00
12 Kabel NYY (2x16 mm) m' 65,000.00
13 Kabel NYY (2x10 mm) m' 60,000.00
14 Kabel NYFGBY (4x6 mm) m' 90,000.00
15 Kabel NYFGBY (4x16 mm) m' 185,000.00
16 Kabel NYFGBY (4x25 mm) m' 240,000.00
17 Kabel Tembaga Kg 42,000.00
18 Kabel Tik 2 10 mm m' 5,000.00
19 NSFB FUJI EA - 100 A bh 649,000.00
20 NSFB FUJI EA - 150 A bh 1,678,000.00
21 Rumah Panel 30 x 60 cm (kosong) unt 87,000.00
22 Skring Kas 2 grop Biasa unt 132,000.00
23 Skring Kas 3 grop Biasa unt 167,000.00
24 Skring Kas 5 grop Biasa unt 351,000.00
25 MCB Mercury bh 68,000.00
26 MCB 1 PAS bh 39,000.00
27 MCB 3 PAS bh 66,000.00
28 MCB (15 Ampere) bh 50,000.00
29 MCB (25 Ampere) bh 160,000.00
30 MCB (2 Ampere) bh 60,000.00
31 MCB (6 Ampere) bh 170,000.00
32 Tahanan 50 A Merk Fuji bh 395,000.00
33 Saklar Tunggal Biasa bh 4,000.00
34 Saklar Ganda Biasa bh 7,000.00
35 Saklar Magnet 25 PK bh 993,000.00
36 Saklar Broko Tunggal Standard ( 1 Phase ) bh 12,000.00
37 Saklar Broko Seri Standard ( 1 Phase ) bh 18,000.00
38 Saklar Engkel Outbow bh 16,000.00
39 Saklar Engkel Outbow (Persegi Cream) bh 33,000.00
40 Saklar Engkel Outbow (Persegi mahagony) bh 33,000.00
41 Saklar Engkel 1 B bh 28,000.00
42 Saklar Engkel Hotel New Gee Urea bh 38,000.00
43 Saklar Engkel 1 B (Radium) bh 42,000.00

38 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
44 Saklar Engkel New Gee (Urea) bh 33,000.00
45 Saklar Engkel New Gee (Urea Mahagony) bh 38,000.00
46 Saklar Engkel New Gee (Urea Brasil) bh 38,000.00
47 Saklar Engkel New Gee (Urea Grey) bh 38,000.00
48 Saklar Seri 1 B bh 33,000.00
49 Saklar Seri 1 B (Radium) bh 47,000.00
50 Saklar Seri New Gee Urea bh 45,000.00
51 Saklar Seri New Gee Urea (Urea Mahagony) bh 50,000.00
52 Saklar Seri New Gee Urea (Urea Brasil) bh 50,000.00
53 Saklar Seri New Gee Urea (Urea Grey) bh 50,000.00
54 Saklar Seri Outbow bh 22,000.00
55 Saklar Seri Outbow (Persegi Cream) bh 45,000.00
56 Saklar Seri Outbow (Persegi Mahagony) bh 50,000.00
57 Saklar Triple 1 B bh 55,000.00
58 Saklar Triple 1 B (Radium) bh 80,000.00
59 Steker Arde Baru bh 30,000.00
60 Steker Arde New Gee (Cream) bh 30,000.00
61 Steker Biasa bh 4,500.00
62 Steker T (Arde Persegi) bh 70,000.00
63 Steker T (Putih) bh 6,000.00
64 Steker T (Hitam) bh 6,000.00
65 Steker T (Arde) bh 45,000.00
66 Stop Kontak Biasa bh 7,000.00
67 Stop Kontak Putar bh 24,000.00
68 Stop Kontak Broko Standard ( 1 Phase ) bh 18,000.00
69 Stop Kontak Broko 3 Phase ( Out Bow ) bh 68,000.00
70 Stop Kontak Broko 3 Phase ( In Bow ) bh 116,000.00
71 Stop Kontak Handle 3 Phase bh 71,000.00
72 Stop Kontak AC Arde 1B bh 185,000.00
73 Stop Kontak Arde 1B bh 30,000.00
74 Stop Kontak Arde 1B Tutup bh 90,000.00
75 Stop Kontak Arde 1B New Gee (Urea) bh 34,000.00
76 Stop Kontak Arde 1B New Gee (Urea Mahagony) bh 40,000.00
77 Stop Kontak Arde 1B New Gee (Urea Brasil) bh 40,000.00
78 Stop Kontak Arde 1B New Gee (Urea Grey) bh 40,000.00
79 Stop Kontak Arde Outbow (Putih) bh 18,000.00
80 Stop Kontak Arde Outbow (Hitam) bh 15,000.00
81 Stop Kontak Arde Outbow (Persegi Cream) bh 35,000.00
82 Stop Kontak Arde Outbow (Persegi Mahagony) bh 40,000.00
83 Stop Kontak Arde Putar (NG Cream) bh 60,000.00
84 Stop Kontak Arde Putar (NG Cream Mahagony) bh 70,000.00
85 Stop Kontak Arde Putar (NG Grey) bh 70,000.00
86 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat ) ttk 93,000.00

39 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
87 Lampu pijar 25 Watt s/d 100 Watt bh 6,000.00
88 Lampu Neon TL Philip 20 W bh 14,000.00
89 Lampu Neon TL Philip 40 W bh 19,000.00
90 Lampu TL 2 x 36 w Type TKI (Lengkap) bh 350,000.00
91 Lampu Down Light E 27 PLC-E 11 W (Lengkap) bh 225.00
92 Trapo TL 20 W ( Philip ) bh 25,000.00
93 Trapo TL 40 W ( Philip ) bh 28,000.00
94 Trapo TL 20 W ( Sinar ) bh 27,000.00
95 Trapo TL 40 W ( Sinar ) bh 25,000.00
96 Trapo Ballas bh 300,000.00
97 Stater Neon Philip bh 4,000.00
98 Stater Neon Biasa bh 2,000.00
99 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan ) bh 88,000.00
100 Down Light + SL 25 W bh 231,000.00
101 Lampu SL Philip 25 W bh 83,000.00
102 Lampu Sirkel TL 20 W Lengkap bh 53,000.00
103 Lampu Mercuri 80 W bh 195,000.00
104 Lampu Mercuri 250 W bh 203,775.00
105 Lampu Son 150 W bh 198,000.00
106 Lampu Taman + Tiang + Lampu 1 Buah bh 602,000.00
107 Lampu Baret 30 cm + Neon bh 81,000.00
108 Lampu Neon Arcrilik 2 x 40 W lengkap bh 18,000.00
109 Pentanahan Penangkal Petir ttk 340,000.00
110 Pentanahan Panel ttk 148,000.00
111 Pipa Penangkal Petir bh 27,000.00
112 Box Sekering set 101,000.00
113 Box Lampu Mercury bh 920,000.00
114 Terminal Kabel bh 22,000.00
115 Box Panel KWH (1 Phase) bh 300,000.00
116 Box Panel KWH (3 Phase) bh 500,000.00
117 Box Sikring (lengkap) set 135,000.00

M BAHAN ALAT PENGANTUNG DAN KUNCI


1 Kunci Silinder ALFA untuk Pintu Alumunium bh 275,000.00
2 Tarikan Pintu bh 30,000.00
3 Kunci 2 Slaag ROYAL bh 90,000.00
4 Rel Henderson Lengkap bh 850,000.00
5 Rel Maraton I Pintu unt 90,000.00
6 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 bh 260,000.00
7 Kunci 2 Slaag Ancor Asli bh 125,000.00
8 Kunci 2 Slaag ISO bh 135,000.00
9 Kunci KM Bulat Kualitas Biasa bh 55,000.00
10 Kunci KM Bulat Sekwalitas ALFA bh 35,000.00
11 Kunci 2 Slaag Silinder Utama Standard bh 230,000.00

40 dari 50
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
12 Kunci Gembok bh 13,000.00
13 Kunci tanam Slaag Royal bh 120,000.00
14 Kunci tanam Slaag Ancor bh 90,000.00
15 Kunci 2 Slaag Kuda Terbang bh 90,000.00
16 Kunci Jendela bh 10,000.00
17 Espangolet ps 75,000.00
18 Grendel Hitam Biasa 15 cm bh 10,000.00
19 Grendel 15 cm bh 15,000.00
20 Grendel 5 cm biasa bh 4,000.00
21 Hak Angin Kait Jendela Biasa ps 10,000.00
22 Hak Angin Jendela Antik ps 25,000.00
23 Hak Angin Sendok Stainless / Kuningan bh 25,000.00
24 Sloot Pintu berikut Rantai bh 35,000.00
25 Sloot Jendela Tunggal bh 13,000.00
26 Engsel Pintu Biasa bh 18,000.00
27 Engsel Pintu Unilon Standard ps 28,000.00
28 Engsel Jendela Biasa bh 11,000.00
29 Engsel Jendela Unilon ps 13,000.00
30 Engsel Patrun ps 8,000.00
31 Engsel Harmonika m1 15,000.00
32 Engsel Floring unit 600,000.00

J STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK


TRUK, KENDARAAN RODA 4 & LAINNYA
1 Stamper 8 Jam hari 200,000.00

N BAHAN BAKAR DAN PELUMAS


1 Minyak Tanah lt 11,000.00
2 Kapur Bakar *M081 m 120,000.00
3 Kayu Bakar *M070 m 65,000.00
2 Bahan Residu lt 2,000.00
3 Minyak Solar lt 4,500.00
4 Bensin Premium lt 4,500.00
5 Minyak Pelumas lt 27,000.00

41 dari 50
HARGA SATUAN PEKERJAAN

NO. URAIAN JUMLAH

A.01.02 1 M2 PEMBUATAN DIREKSI KEET DAN LOS GUDANG KERJA 343,100.00


A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN 1 METER 51,200.00
A.02.09 1 M3 URUGAN TANAH KEMBALI 17,000.00
A.02.10 1 M3 PEMADATAN TANAH 14,300.00
A.02.11 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR) 88,700.00
A.02.12 1 M3 URUGAN PASIR 116,500.00
A.03.01 1 M3 PASANG AANSTAMPING BATU KOSONG 257,800.00
A.03.04 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 5 Ps 537,300.00
A.04.14 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr 618,000.00
A.04.21 1 M3 MEMBUAT SLOOF 15/20 (117.6000 Kg Besi + Bekesting) 3,065,300.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.25 1 M3 MEMBUAT KOLOM 12/12 (211.2900 Kg Besi + Bekesting) 4,447,100.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.29 1 M3 MEMBUAT KOLOM 15/20 (117.5900 Kg Besi + Bekesting) 3,667,300.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.32 1 M3 MEMBUAT KOLOM 20/20 (92.0500 Kg Besi + Bekesting) 3,206,300.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.39 1 M3 MEMBUAT RING BALK 12/15 (172.9000 Kg Besi + Bekesting) 4,317,100.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.42 1 M3 MEMBUAT RING BALK 15/20 (117,6000 Kg Besi + Bekesting) 3,408,400.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.45 1 M3 MEMBUAT RING BALK 15/25 (151,9500 Kg Besi + Bekesting) 3,740,600.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.48 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 10 cm TEBAL 8 cm 3,646,600.00
A.04.50 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm 4,463,000.00
A.05.05 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps 82,400.00
A.06.04 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN 44,400.00
A.07.09 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAYU LOKAL KLS II 5,450,500.00
A.07.14 1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II 480,000.00
A.07.18 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAYU LOKAL KLS II 358,400.00
A.08.15 1 M2 PASANG ATAP GENTENG PALENTONG 55,100.00
A.08.18 1 M1 PASANG BUBUNG GENTENG PALENTONG 73,500.00
A.08.26 1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU LOKAL KLS II 60,000.00
A.08.34 1 M1 PASANG TALANG DATAR/JURAI SENG BJLS 144,200.00
A.09.03 1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU LOKAL KLS II 91,400.00
A.09.06 1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm 20,100.00
A.09.09 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4 11,500.00
A.10.03 1 M2 PASANG LANTAI KERAMIK WARNA 20 X 20 CM 166,100.00
A.10.09 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM 127,100.00
A.10.19 1 M2 PASANG DINDING KERAMIK 20 X 25 CM 187,400.00

42 dari 50
NO. URAIAN JUMLAH

A.11.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN 512,100.00


A.11.06 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3 642,100.00
A.12.08 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75" 22,800.00
A.12.13 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3" 115,200.00
A.12.14 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4" 153,900.00
A.12.16 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" 40,100.00
A.12.17 MEMASANG 1 BH FLOOR DRAIN 38,100.00
A.13.03 1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL) 3,645,600.00
A.14.01 1 BUAH PASANG KUNCI TANAM BIASA 134,500.00
A.14.04 1 BUAH PASANG ENGSEL PINTU 33,100.00
A.14.05 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU 21,100.00
A.14.06 1 BUAH PASANG KAIT ANGIN 31,100.00
A.14.08 1 BUAH PASANG KUNCI SELOT 35,200.00
A.14.09 1 BUAH PASANG TARIKAN PINTU 80,500.00
A.15.02 1 M2 PASANG KACA, TEBAL 5 MM 81,100.00
A.16.05 1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x) 15,200.00
A.16.07 1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x) 23,500.00
A.16.08 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI 42,500.00

43 dari 50
DAFTAR SATUAN UPAH PEKERJA

HARGA UPAH
NO JENIS PEKERJA BANGUNAN SATUAN WAKTU
( Rp. )
1 PEKERJA 65,000 1 ORANG/ HR/ 8 JAM
2 PEKERJA TERAMPIL 85,000 1 ORANG/ HR/ 8 JAM
3 TUKANG GALI 80,000 1 ORANG/ HR/ 8 JAM
4 TUKANG BATU TERAMPIL 85,000 1 ORANG/ HR/ 8 JAM
5 KEPALA TUKANG BATU 90,000 1 ORANG/ HR/ 8 JAM
6 TUKANG KAYU TERAMPIL 85,000 1 ORANG/ HR/ 8 JAM
7 KEPALA TUKANG KAYU 90,000 1 ORANG/ HR/ 8 JAM
8 TUKANG CAT / PELITUR TERAMPIL 85,000 1 ORANG/ HR/ 8 JAM
9 KEPALA TUKANG CAT / PELITUR 90,000 1 ORANG/ HR/ 8 JAM
10 TUKANG BESI BETON TERAMPIL 85,000 1 ORANG/ HR/ 8 JAM
11 KEPALA TUKANG BESI BETON 90,000 1 ORANG/ HR/ 8 JAM
12 TUKANG BESI PROFIL TERAMPIL 85,000 1 ORANG/ HR/ 8 JAM
13 KEPALA TUKANG BESI PROFIL 90,000 1 ORANG/ HR/ 8 JAM
14 MANDOR 100,000 1 ORANG/ HR/ 8 JAM
15 OPERATOR MEKANIK 75,000 1 ORANG/ HR/ 8 JAM
16 PEMBANTU OPERATOR / MEKANIK 60,000 1 ORANG/ HR/ 8 JAM
17 OPERATOR ALAT BERAT TERLATIH 75,000 1 ORANG/ HR/ 8 JAM
18 SUPIR TRUK 75,000 1 ORANG/ HR/ 8 JAM
19 KENEK TRUK 60,000 1 ORANG/ HR/ 8 JAM
20 PENJAGA MALAM 60,000 1 ORANG/ HR/ 8 JAM
21 TUKANG ASPAL 60,000 1 ORANG/ HR/ 8 JAM
22 BURUH LAPANGAN TAK TERLATIH 50,000 1 ORANG/ HR/ 8 JAM
23 BURUH LAPANGAN KURANG TERLATIH 60,000 1 ORANG/ HR/ 8 JAM
24 BURUH LAPANGAN TERLATIH 75,000 1 ORANG/ HR/ 8 JAM
25 TUKANG LAS 70,000 1 ORANG/ HR/ 8 JAM

44 dari 50
REKAPITULASI RENCANA ANGGARA BIAYA
PEMBANGUNAN RUMAH TINGGAL SEDERHANA

JUMLAH
NO. URAIAN PEKERJAAN
(RP)
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN PENGUKURAN DAN BOUWLANK
III PEKERJAAN TANAH DAN PONDASI
PEKERJAAN BETON
PEKERJAAN DINDING DAN LANTAI
PEKERJAAN KUSEN DAN PLAFOND
PEKERJAAN P
PEKERJAAN PENGUKURAN DAN BOUWLANK
PEKERJAAN PENGUKURAN DAN BOUWLANK
PEKERJAAN PENGUKURAN DAN BOUWLANK
PEKERJAAN PENGUKURAN DAN BOUWLANK
PEKERJAAN PENGUKURAN DAN BOUWLANK
PEKERJAAN PENGUKURAN DAN BOUWLANK

JUMLAH
PPN 10%
JUMLAH TERMASUK PPN
Diperiksa : DIBULATKAN
PEJABAT PELAKSANA TEKNIS
KEGIATAN
TERBILANG :

Dibuat oleh ::
Menyetujui
KONSULTAN PERENCANA
PEJABAT PEMBUAT
SUSPENDI, SH CV. ARCHINDO
KOMITMENMEDIA KARYA
NIP. 196105161983031009

BUDI NURCAHYADI, S.T., IAI


MUJJADIDirektur Utama
ADI NUGROHO, A. Ks
NIP. 197111141994031002

Page 45 of 50
Dibuat oleh ::
Menyetujui
KONSULTAN PERENCANA
PEJABAT PEMBUAT
SUSPENDI, SH RENCANA ANGGARAN BIAYA
CV. ARCHINDO
KOMITMENMEDIA KARYA
NIP. 196105161983031009
PEMBANGUNAN RUMAH TINGGAL SEDERHANA

KODE VOLUME HARGA SAT.


NO. URAIAN PEKERJAAN BUDI NURCAHYADI,
ANALISA SATUAN ( Rp. ) S.T., IAI
MUJJADIDirektur Utama
ADI NUGROHO, A. Ks
I. PEKERJAAN PERSIAPAN NIP. 197111141994031002
1 Pengadaan Listrik dan Air Kerja ls Unit
2 Pengukuran & Pas. Bowplank ls M
3 Pek. Direksikeet/Gudang Kerja A.01.02 m 343,100.00
4 Pek. Pembersihan setelah Pembangunan ls 112.000 Unit
JUMLAH : I
II. PEKERJAAN KONTRUKSI :
A. PEKERJAAN TANAH & PASIR
1 Pek. Galian Tanah Pondasi A.02.01 64.175 m 51,200.00
2 Pek. Urugan Kembali Bekas Galian A.02.09 21.390 m 17,000.00
3 Pek. Urugan Tanah Peninggian Lantai (tanah dari A.02.11 m 88,700.00
luar)
4 Pek. Urugan Pasir Bawah Pondasi A.02.12 3.400 m 116,500.00
5 Pek. Urugan Pasir Bawah Lantai A.02.12 3.000 m 116,500.00
JUMLAH : A
B. PEK. PASANGAN, DINDING DAN PLESTERAN
1 Pas. Aanstamping Batu Kali A.03.01 10.190 m 257,800.00
2 Pas. Pondasi Batu Kali (1 Pc : 5 Ps) A.03.04 25.110 m 537,300.00
3 Pas. Dinding Bata (1 Pc : 5 Ps) A.05.05 m 82,400.00
4 Pas. Plesteran Dinding + Acian (1 Pc : 5 Ps) A.06.04 426.540 m 44,400.00
5 Pas. Ban Plesteran A.06.04 m 44,400.00
JUMLAH : B
C. PEKERJAAN STRUKTUR BETON
1 Pek. Sloof Beton Bertulang 15/20 A.04.29 2.300 m 3,667,300.00
2 Pek. Kolom Beton Bertulang 15/15 A.04.32 1.440 m 3,206,300.00
3 Pek. Ring Balok Bertulang 15/20 A.04.25 m 4,447,100.00
4 Pek. Balok Oversteak 12/15 A.04.48 m 3,646,600.00
5 Pek. Plat Oversteak t = 7 cm A.04.39 m 4,317,100.00
JUMLAH : C
D. PEK. KUSEN, PINTU DAN JENDELA
1 Pek. Kusen Kayu Lokal Kls II A.07.09 m 5,450,500.00
2 Pek. Daun Pintu Panil Kayu Lokal Kls II A.07.14 m 480,000.00
3 Pek. Daun Jendela Panil Kayu Lokal Kls II A.07.18 Bh 358,400.00
4 Pas. Kunci Pintu Tanam A.14.01 Bh 134,500.00
5 Pas. Engsel Pintu A.14.04 - Bh 33,100.00
6 Pas. Engsel Jendela A.14.05 - Bh 21,100.00
7 Pas. Slot Pintu A.14.08 - bh 35,200.00
8 Pas. Slot Jendela A.14.08 - bh 35,200.00
9 Pas. Hak Angin A.14.06 - bh 31,100.00
10 Pas. Pegangan Pintu A.14.09 - bh 80,500.00
11 Pas. Kaca Polos 5 mm A.15.02 bh 81,100.00
12 Pek. Pintu Fibre ls bh
JUMLAH : D

Page 46 of 50
CV. ARCHINDO MEDIA KARYA
KOMITMEN

KODE VOLUME HARGA SAT.


NO. URAIAN PEKERJAAN BUDI NURCAHYADI,
ANALISA SATUAN ( Rp. ) S.T., IAI
MUJJADIDirektur Utama
ADI NUGROHO, A. Ks
E. PEKERJAAN PLAFOND NIP. 197111141994031002
1 Pek. Rangka Plafond Enternit Kayu Lokal Kls II A.09.03 m 91,400.00
2 Pek. Penutup Plafond Enternit A.09.06 m 20,100.00
3 Pek. List Plafond Kayu Lokal Kls II A.09.09 m' 11,500.00
JUMLAH : E
F. PEKERJAAN ATAP
1 ls m
Pas. Kuda & Rangka Atap (Baja Ringan Lengkap)
Kualitas Galvalum (Zinc - Alumunium) Coating

2 Pas. Penutup Atap Genteng Palentong A.08.15 - m 55,100.00


3 Pas. Talang lipatan atap seng BJLS A.08.34 m' 144,200.00
4 Pas. Listplank Kayu Lokal Kls II A.08.26 m' 60,000.00
5 Pas. Bubungan Genteng Palentong A.08.18 m' 73,500.00
JUMLAH :F
G. PEKERJAAN LANTAI
1 Pas. Lantai Kramik (40x40) A.10.09 58.750 m 127,100.00
2 Pas. Keramik WC/K.MANDI (20x20) antislip A.10.03 2.700 m 166,100.00
3 Pas. Keramik Dinding WC/K.MANDI (20x25) A.10.19 55.250 m 187,400.00
4 Pas. Rabat Beton Tumbuk 1:3:5 A.04.14 m 618,000.00
JUMLAH : G
H. PEKERJAAN PENGECETAN
1 Pek. Cat Dinding Bangunan A.16.05 456.540 m 15,200.00
2 Pek. Cat Plafond A.16.07 64.600 m 23,500.00
3 Pek. Cat Permukaan Kayu A.16.08 m 42,500.00
JUMLAH : H
I. PEKERJAAN INSTALASI LISTRIK
1 Biaya Pemasangan Listrik (2200 Watt) Dihitung 1.000 unt
2 Pas. Panel (lengkap) ls 1.000 unt
3 Pas. Instalasi Titik Lampu ls 21.000 ttk
4 Pas. Instalasi Stop Kontak ls 11.000 ttk
5 Pas. Lampu TL 2 x 36 w Type TKI (Lengkap) ls 8.000 bh
6 Pas. Lampu SL Philip 12 W ls 13.000 bh
7 Pas. Saklar Tunggal sekualitas Broco ls 5.000 bh
8 Pas. Saklar Seri sekualitas Broco ls 5.000 bh
9 Pas. Stop Kontak Broco ls 9.000 bh
JUMLAH : I
J. PEKERJAAN INSTALASI AIR BERSIH
1 Pas. Pipa PVC 3/4" (air bersih) A.12.08 m' 22,800.00
2 Pas. Washtafel + Kaca Cermin ls 1.000 bh
3 Pas. Kran Air Bersih A.12.16 3.000 bh 40,100.00
JUMLAH : J
K. PEKERJAAN INSTALASI AIR KOTOR
1 Pas. Pipa PVC 4" Air Kotor A.12.14 m' 153,900.00
2 Pas. Pipa PVC 3" Air Kotor A.12.13 m' 115,200.00
3 Pas. Bak mandi Fibreglass A.11.06 2.000 bh 642,100.00
4 Pas. Kloset Jongkok Porselen A.11.02 2.000 bh 512,100.00
5 Pas. Floor Drain A.12.17 3.000 bh 38,100.00
6 Pek. Septictank & Rembesan (Type Kecil) A.13.03 1.000 unt 3,645,600.00
JUMLAH : K

Page 47 of 50
TULASI RENCANA ANGGARA BIAYA
UNAN RUMAH TINGGAL SEDERHANA

JUMLAH
(RP)
-

4,394,990.00
35,056,961.00
13,051,862.00
-
-
-
18,269,445.00
8,457,508.00
-
120,300.00
6,068,300.00

85,419,366.00
8,541,936.60
93,961,302.60
93,961,000.00

Dibuat oleh ::
Menyetujui
KONSULTAN PERENCANA
PEJABAT PEMBUAT
CV. ARCHINDO
KOMITMENMEDIA KARYA

BUDI NURCAHYADI, S.T., IAI


MUJJADIDirektur Utama
ADI NUGROHO, A. Ks
NIP. 197111141994031002

Page 48 of 50
Dibuat oleh ::
Menyetujui
KONSULTAN PERENCANA
PEJABAT PEMBUAT
RENCANA ANGGARAN BIAYA
CV. ARCHINDO
KOMITMENMEDIA KARYA
UNAN RUMAH TINGGAL SEDERHANA

JUMLAH HARGA
BUDI NURCAHYADI, S.T., IAI ( Rp. )
MUJJADIDirektur Utama
ADI NUGROHO, A. Ks
NIP. 197111141994031002
-
-
-
-
-

3,285,760.00
363,630.00
-

396,100.00
349,500.00
4,394,990.00

2,626,982.00
13,491,603.00
-
18,938,376.00
-
35,056,961.00

8,434,790.00
4,617,072.00
-
-
-
13,051,862.00

-
-
-
-
-
-
-
-
-
-
-
-
-

Page 49 of 50
CV. ARCHINDO MEDIA KARYA
KOMITMEN

JUMLAH HARGA
BUDI NURCAHYADI, S.T., IAI ( Rp. )
MUJJADIDirektur Utama
ADI NUGROHO, A. Ks
NIP. 197111141994031002
-
-
-
-

-
-
-
-
-

7,467,125.00
448,470.00
10,353,850.00
-
18,269,445.00

6,939,408.00
1,518,100.00
-
8,457,508.00

-
-
-
-
-
-
-
-
-
-

-
-
120,300.00
120,300.00

-
-
1,284,200.00
1,024,200.00
114,300.00
3,645,600.00
6,068,300.00

Page 50 of 50