Report on Load Crash in Northern Grid and complete station outage at 400kV
Bawana (DTL from 16:00hrs of 21st May17 onwards
The Northern Region (NR) experienced demand crash on account of rain with thunderstorm. A
Flash report for the same was issued by NRLDC on 21-May-17. The event based upon data
received and available is summarized below:

The demand in Delhi and Haryana started decreasing from 16:00hrs followed by
demand reduction in Uttar Pradesh (UP) and Uttarakhand from 17:00hrs and 17:30hrs
respectively (Details attached at Annexure-1
9 no. of 400kV & above transmission elements tripped during 16:18hrs to 17:43hrs. (List
of tripped lines is attached at Annexure 2).
A demand crash of around 10GW was observed in the northern region. (Details attached
at Annexure-3).
Overall, NR energy consumption reduced from 1078 MUs on 20th to 1010 MUs on 21st
May17.
At 16:47hrs, All lines emanating from 400 kV Bawana substation tripped ,incurring load
loss of 700MW .This event is categorized as GD-1.

The antecedent conditions are as follows:

o Grid Frequency : 50.15Hz


o NR Demand met : 42008 MW
o Net Inter Regional Import : 5490 MW
o HVDC Rihand-Dadri Flow : 1000 MW (Rihand to Dadri)
o HVDC Balia-Bhiwadi Flow : 250 MW (Bhiwadi to Balia)
o Vindhyachal BtB Flow : 500 MW (North-west)
o HVDC Mundra-Mahendergarh : 1600 MW (WR to NR)
o 765kV Agra-Gwalior D/C : 1200 MW (towards NR)

1|Page
Preliminary Observations:-

From PMU:-
1.Multiple transient dip in all three phases observed over the period of thunderstorm.

From SOE:-
Majority of lines connected to Bawana tripped at 16:47hrs to16:48hrs.

( plots attached in Annexure-iv)

Mitigation measures taken:

The warning regarding likely thunderstorm/dust storm in NR as per IMD report was sent
earlier in the day. (The warning issued by IMD is given at Annexure-V.).
Alerts were issued to all concerned to reduce under-drawl and for backing down of
generation in order to control high frequency operation besides containing over-
voltages.
Immediate actions were taken to surrender power from ISGS generating stations &
ancillary down (RRAS down) were imposed (up to 55% technical minimum). Hydro
generation in the region was also reduced base on the grid requirement.

States may provide the detailed report for the above load crash event, Delhi/Haryana may send the
DR/EL of the lines tripped at their end along with detailed report.

2|Page
Annexure-1

3|Page
Annexure-1

4|Page
Annexure-2

S. No. Name of the tripped element Tripping Time Revival Time

16:18 17:29
1 765kV Bhiwani -Meerut

16:45 9:56(22nd may)


2 400kV Bassi(PG)-Sikar(PG) 1

400KV Bawana(DTL)-Dipalpur(HVPNL) 16:47 17:59


1
400KV Bawana(DTL)-Mandola(PG) 1 16:47 18:36
2
400KV Bawana-Bawana(GT) 2 16:47 20:57
3
400KV Ballabgarh-Mainpuri 2 16:48 18:48
4
400KV Abdullapur(PG)-Bawana(DTL) 1 16:48 22:00
5
400kV Panchkula(PG)-Panipat (BBMB) 17:23 18:26
6
400kV Bhiwadi-Gurgaon 17:29 20:10
7
400kV Ballabgarh-Kanpur 3 17:43 18:43
8
400kV Ballabgarh-Kanpur 2 17:43 18:43
9

5|Page
Annexure-3

6|Page
Annexure-4

7|Page
Annexure-4

SOE
Time Voltage level
Station Element Device Status
(in ms) (in kV)
16:47:19:921 Abdullapur 400kV LIBWANA1 CB open
16:47:21:139 Abdullapur 400kV 18BWANA1 CB open
16:47:32:916 Mandaula 400KV 9BWANA1 CB open
16:47:42:098 Bahadurgarh 400KV 1CCGTB CB open
16:47:57:556 Mandaula 400KV 4BWANA1 CB open
16:47:57:558 Mandaula 400KV 6BWANA1 CB open
16:47:57:564 Bahadurgarh 400KV 2T1BWA CB open
16:47:57:572 Bahadurgarh 400KV 2T1BWA CB open
16:47:59 Bhiwani 400KV 11T2 CB open
16:47:59 Bhiwani 400KV 12JIND1 CB open

8|Page
Annexure-5

Radar Images

9|Page
Annexure-5

10 | P a g e