Vous êtes sur la page 1sur 1

JINDAL POWER LIMITED

CHECKLISTS
Doc. No. TMD/CL/002
TITLE : CHECKLIST FOR PREVENTIVE MAINTENANCE OF EQUIPMENTS Issue No. / Date 01 / 01-09-2008
TG & BOP MAINTENANCE DEPARTMENT Rev No. / Date 00 / 01-09-2008
UNIT : EQUIPMENT : CONDENSATE EXTRACTION PUMPS
WORK ORDER NO. : DATE :

PERMIT NO. : PTW ISSUE DATE : PTW CLOSING DATE :

Sl. Design Actual


Work Instructions Frequency Remarks
No. Value Value
Work to be done/carried out when the equipment is isolated
Take PTW & ensure proper isolation of electrical , mechanical & C& I isolation have
1 Quarterly
made.
Check all joints & valve gland leakages , if leakages is observed , is same to be attended
2 Quarterly
by either by tightning or replacing the gland .

3 Check all holding down bolts for tightness and take corrective action if required. Quarterly

Check thrust bearing oil level in the thrust bearing gauge glass, if level is low top-up with
4 Quarterly
SERVO PRIME -46.
5 Check the tightness of coupling bolts. Quarterly
Check the alignment of pump with respect to motor , if required & do the necessary
6 Quarterly
correction , if required.
7 Cleaning of suction strainers to be done if required. Quarterly
Spill over oil /water / grease/ cotton waste/etc in surrounding area and floor to be cleaned
8 Quarterly
and disposed.
Return the PTW & trial run of the equipment , if any leakage persist , same is to be
9 Quarterly
rectified.

Signature of Contractor Signature of JPL Engineer Signature of JPL Engineer in charge


Page No. : 01

Prepared By : Reviewed & Approved By

Vous aimerez peut-être aussi