HERVE Training objectives & scope
BARON

To get familiar with both BASIC and DETAILED Engineering

To know the work of the various Engineering disciplines and get


familiar with all common engineering deliverables

To understand the challenges faced by Engineering

To provide you with practical tips on how to control engineering


execution by a sub-contractor

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 1

Engineering in the Project: Role, Organization, Documents,


Generalities

General documents, Design basis and design criteria

The engineering disciplines


• PROCESS
• MECHANICAL
• SAFETY & ENVIRONMENT
• CIVIL
• PLANT LAYOUT & PIPING
• INSTRUMENTATION

© 2013 – Hervé Baron


• ELECTRICAL
HERVE Training Agenda
BARON
Day 2

Hands-on – mini EPC Project

Key aspects of Engineering


• The Technical baseline: the Contractual requirements
• Engineering organization, split of Work and resources
• Interfaces between disciplines
• BASIC vs DETAIL design
• Document control
• Engineering Interface with Procurement, Construction, Third Parties
• IT
• Management of changes

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 3

The main challenge: meeting the Project schedule


• FEED
• EPC

How to control a Contractor


• The plan
• Progress measurement
• Factors that could Impact progress
• Engineering Controls and KPIs
• Engineering Quality
• Critical Points to watch

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 1

Engineering in the Project: Role, Organization, Documents,


Generalities

General documents, Design basis and design criteria

The engineering disciplines


• PROCESS
• MECHANICAL
• SAFETY & ENVIRONMENT
• CIVIL
• PLANT LAYOUT & PIPING
• INSTRUMENTATION

© 2013 – Hervé Baron


• ELECTRICAL
HERVE Basic Engineering/FEED
BARON

Client
Vendors / Sub-
Documents Approval/ Contractors
submitted to Comments
client Inquiries Quotations

Cost Estimate Department


Documents for Inquiry:
Bill of Materials / specifications
Process Design
Package (PDP) Engineering
Client
Engineering basis for EPC call for
tender
Material Requisitions for LLI

© 2013 – Hervé Baron


HERVE The Engineering Work process synoptic
BARON

Process design

PFDs P&IDs

H&M balance
Piping
Instrumentation

Equipment specification
Process
data sheet Vendor
Rotating drawings Layout
Pressure vessels
Fired equipment Civil

© 2013 – Hervé Baron


Heat exchangers
Electrical
Packages etc.
HERVE Training Agenda
BARON
Day 1

Engineering in the Project: Role, Organization, Documents,


Generalities

General documents, Design basis and design criteria

The engineering disciplines


• PROCESS
• MECHANICAL
• SAFETY & ENVIRONMENT
• CIVIL
• PLANT LAYOUT & PIPING
• INSTRUMENTATION

© 2013 – Hervé Baron


• ELECTRICAL
HERVE List of common Engineering Deliverables
BARON

© 2013 – Hervé Baron


HERVE Specifications
BARON

What difference can you see between the 2 sets of specifications?


Design criteria for civil, structural and building Technical specification – structural steel materials and
engineering fabrication
Design specification for roads Specification for asphalt paving

Design specification for sewage and drainage Specification for hot dip galvanized anchor bolts

Specification for plant outdoor lighting Technical specification Low Voltage Motors
Telecommunication and information system philosophy Technical specification for Machine Monitoring system

Instrumentation and control system design basis Technical specification for control valves

Fire Protection Design Technical specification for fire detection devices in


buildings
Safety concept
Technical specification for wheeled fire extinguishers
Design philosophy for cathodic protection
Technical specification for isolating joint
Specification for pipe supports design
Technical specification for cathodic protection materials

© 2013 – Hervé Baron


Job specification for supply for piping sliding plates

Technical specification for centrifugal pumps


Technical specification for tail gas incinerator
HERVE The (Basic) Engineering Design Data
BARON

Draw the
Table of
Contents

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 1

Engineering in the Project: Role, Organization, Documents,


Generalities

General documents, Design basis and design criteria

The engineering disciplines


• PROCESS
• MECHANICAL
• SAFETY & ENVIRONMENT
• CIVIL
• PLANT LAYOUT & PIPING
• INSTRUMENTATION

© 2013 – Hervé Baron


• ELECTRICAL
HERVE Engineering disciplines: activities and deliverables
BARON

PROCESS
• Design basis and criteria
• Process Simulations, Process Flow Diagrams, HMB, equipment list
• Process description
• Equipment sizing
• P&IDs
• Piping specification and sizing
• Instrument process specification
• Process and Emergency shutdown
• Flare study
• Operating manual

© 2013 – Hervé Baron


HERVE Process design criteria
BARON

• Design margins
• Design Pressure and Temperature criteria
• Equipment sizing criteria
• Line sizing criteria
• Control valve sizing criteria

© 2013 – Hervé Baron


HERVE Engineering disciplines: activities and deliverables
BARON

PROCESS
• Design basis and criteria
• Process Simulations, Process Flow Diagrams, HMB, equipment list
• Process description
• Equipment sizing
• P&IDs
• Piping specification and sizing
• Instrument process specification
• Process and Emergency shutdown
• Flare study
• Operating manual

© 2013 – Hervé Baron


HERVE Process simulations
BARON

Simulator settings
Output
Input
- Flow scheme
- Stream flows and
- Feed composition and - Thermodynamic model
composition
conditions - Equipment performance
- Equipment duty

© 2013 – Hervé Baron


HERVE Block Flow Diagrams & Process Flow Diagrams
BARON

© 2013 – Hervé Baron


HERVE The Process Flow Diagram (PFD)
BARON

Results from process simulations

Depicts the various Equipment within a Process (or Utility) Unit and their sequence

© 2013 – Hervé Baron


Shows the process controls

The individual drawing item of the PFD is the Equipment Item


HERVE Process eqiupment sizing
BARON
Case study: Production separator

Sets the gas


cross section
Vessel size

Sets the liquid volume

© 2013 – Hervé Baron


HERVE Process Data Sheet
BARON
Contents of the Process Data Sheet:
• Design conditions
• Overdesign
• Fluid properties
• Equipment duty
• Skeleton drawing & dimensions
• Material (generic type) and
corrosion allowance
• Specification of internals:
demister, distributor, baffle etc.
• Nozzles list
• Allowable pressure drop, fouling

© 2013 – Hervé Baron


factor, Cp, Cv, enthalpy curve (for
HX, heaters)
•Available NPSH (for pumps)
HERVE Piping & Instrumentation Diagram (P&ID)
BARON

What purpose does a


P&ID serve?

At design stage:
• Defines the design basis for Piping & Instrumentation disciplines
• Serves to show and agree the operating and maintenance features between
Engineer and Owner or between Engineer and Vendor
• Serves to show the interface with equipment/package vendors

© 2013 – Hervé Baron


• Perform HAZOP review

During operation:
• Reference drawing for operator, work permit, plant modifications etc.
HERVE Piping & Instrumentation Diagrams (P&IDs)
BARON

Important features (1/3)


Normal operation
• Redundancy for critical instruments / safety switches
Shutdown
• Check valves
Start-up
• Pressurization
• warm-up / purge lines
Maintenance
• Equipment isolation & bypass: valves, spectacle/blind
• Nitrogen injection, vent
• Drains

© 2013 – Hervé Baron


• Control and ON/OFF valves isolation
• Instrument isolation
HERVE Piping & Instrumentation Diagrams (P&IDs)
BARON

Various types of P&IDs


P&ID
• Legend and Symbols representation
• Identification & Numbering
• Details and Typicals
• Process or Utility P&ID
• Distribution P&ID
• Interconnection P&ID
• Pumps auxiliary P&ID Details

• Package P&ID

© 2013 – Hervé Baron


HERVE P&ID work sequence
BARON

P&ID
HAZOP
Review

IFR IFD IFC


Piping MTO

© 2013 – Hervé Baron


& PO
HERVE Quiz
BARON
Which revision of P&IDs has the following purpose/contents?
Purpose IFR IFD IFC
Collect Client comments
Perform PID review
Perform HAZOP
Perform Piping MTO for 1st Piping purchase
Freeze Control system I/O list
Issue Piping ISOs
Contents IFR IFD IFC
Comments from all disciplines
Comments from Piping, I&C disciplines
Finalized interfaces with eqt/package
Exercised Contract Option(s)
Size, number of PSVs and CVs

© 2013 – Hervé Baron


Diameter of process lines
Diameter of utility lines
HAZOP comments incorporated
Client comments incorporated
HERVE Process Engineering / schedule
BARON
Hands-on exercise

© 2013 – Hervé Baron


HERVE Typical PROCESS Licensor / Engineering split
BARON

Item Process Licensor Engineer


PFD, H&MB X
Equipment data sheet Equipment process data sheet: Equipment Mechanical data sheet
- Operating conditions,
- Duty
- Diameters of vessels
- Size of Nozzles
- Pump head
+ specific info for internals etc.
P&IDs Generic customized (piping class, line and
valves size, HAZOP comments,
vendor info)

© 2013 – Hervé Baron


Line sizing Line sizing criteria Sizing (takes into account eqt loc,
elevation etc.)
Plot Plan recommendations X
Material selection Basic requirement MSD
HERVE Training Agenda
BARON
Day 1

Engineering in the Project: Role, Organization, Documents,


Generalities

General documents, Design basis and design criteria

The engineering disciplines


• PROCESS
• MECHANICAL
• SAFETY & ENVIRONMENT
• CIVIL
• PLANT LAYOUT & PIPING
• INSTRUMENTATION

© 2013 – Hervé Baron


• ELECTRICAL
HERVE From Process to Mechanical
BARON

Process design

PFDs
H&M balance

Equipment specification
Process
data sheet
Rotating
Pressure vessels
Fired equipment

© 2013 – Hervé Baron


Heat exchangers
Packages etc.
HERVE Process Data Sheet vs Mechanical Data Sheet
BARON

© 2013 – Hervé Baron


Look at the PDS and MDS in your exercise book. What additional
information is contained in the MDS? What does Mechanical
design entail?
HERVE Process Data Sheet vs Mechanical Data Sheet
BARON

Process Data Sheet: Mechanical Data Sheet:


• design conditions • design conditions & code
• skeleton drawings • scaled drawing
• material (generic type) and • material grades and thickness of
corrosion allowance all parts
• equipment dimensions • all dimensions
• definition of type of internals • drawings of internals
• nozzles list • nozzzles position and elevation
• height from ground • designed support
• weight
• loads on foundation

© 2013 – Hervé Baron


• limits of supply
HERVE Mechanical Design
BARON

The vessel wall thickness is calculated so that with all


loadings, i.e.,
• Internal pressure
• External pressure
• Weight
• Seismic
• Wind
• Other external loads

© 2013 – Hervé Baron


HERVE Equipment / Mechanical
BARON

What is a package ?

What is, for Engineering, the purpose


to order as a package ?

What is usually ordered as a package ?

Which is the responsible discipline ?

Which document is produced to specify


a package ? By whom ?

What are the key things to consider


when specifying a package?

© 2013 – Hervé Baron


HERVE Instrumentation Specification for packaged units
BARON
Local control Centralized control

© 2013 – Hervé Baron


HERVE Test
BARON

Identify the documents issued by Engineering to order each type of


equipment…

Equipment Process discipline Equipment/Mechanical discipline


PDS Duty MDS Particular General MR
spec Specification Specification
Pressure Vessel
Rotating equipment
Reactor
Heat Exchanger – Shell &
Tube
Heat Exchanger – Other type
Fired heater

© 2013 – Hervé Baron


Package
HERVE Training Agenda
BARON
Day 1

Engineering in the Project: Role, Organization, Documents,


Generalities

General documents, Design basis and design criteria

The engineering disciplines


• PROCESS
• MECHANICAL
• SAFETY & ENVIRONMENT
• CIVIL
• PLANT LAYOUT & PIPING
• INSTRUMENTATION

© 2013 – Hervé Baron


• ELECTRICAL
HERVE HAZOP
BARON
hands-on exercise

Fill the table

© 2013 – Hervé Baron


HERVE Quantitative Risk Analysis (QRA)
BARON
case study: gas leak in Turbo-compressor building

Step 2: Event tree analysis


Release Frequency Immediate ESD & Fire Delayed Explosion/ Consequence Event Frequency (ev/y)
ignition Fighting Ignition Flash-fire

Probability of immediate ignition Gas detectors are provided inside the building, that
for 1-50 kg/s release rate is 7% 0,998 activate isolation and depressurization.
Jet fire ESD It& is
FFassumed 7,779E-03
(from statistical data) 0,070 that they operate 95% of the time.
0,002 Jet fire no ESD & FF 1,520E-05
Probability of explosion vs flash fire (12%) depends
1,11E-01
Release/yr
on mass of gas and degree of confinement
0,949 Dispersion 9,827E-02
0,930

0,051
0,028
0,120

0,880
Explosion

Flash fire
?
1,774E-05

1,301E-04

0,972 Dispersion 5,133E-03

Yes Frequency (event/year)


Jet fire ESD & FF 7,779E-03
Probability of delayed ignition (2.8%)Jet
takes into account
fire no ESD & FF 1,520E-05
equipment explosion protection (Ex) Explosion 1,774E-05

© 2013 – Hervé Baron


No Flash Fire 1,301E-04
Dispersion 1,034E-01
B04a/b/c/d 5%

What is the frequency of an explosion?


HERVE Training Agenda
BARON
Day 1

Engineering in the Project: Role, Organization, Documents,


Generalities

General documents, Design basis and design criteria

The engineering disciplines


• PROCESS
• MECHANICAL
• SAFETY & ENVIRONMENT
• CIVIL
• PLANT LAYOUT & PIPING
• INSTRUMENTATION

© 2013 – Hervé Baron


• ELECTRICAL
HERVE Foundation guide drawing
BARON

© 2013 – Hervé Baron


HERVE Pipe-rack design
BARON

What is usually the governing load?


What is the governing design criteria?

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 1

Engineering in the Project: Role, Organization, Documents,


Generalities

General documents, Design basis and design criteria

The engineering disciplines


• PROCESS
• MECHANICAL
• SAFETY & ENVIRONMENT
• CIVIL
• PLANT LAYOUT & PIPING
• INSTRUMENTATION

© 2013 – Hervé Baron


• ELECTRICAL
HERVE Layout/principles
BARON
Define the respective position of the 6
items as per good plant layout practice

PREVAILING WIND

… … … … …
3 6
1

© 2013 – Hervé Baron


2
5
HERVE On-shore plant: Equipment spacing recommendations
BARON
as per GE GAP Guidelines 2.5.2

© 2013 – Hervé Baron


HERVE Layout principles: typical Unit Layout
BARON

© 2013 – Hervé Baron


HERVE Piping installation
BARON

© 2013 – Hervé Baron


Unit Plot Plan Line diagram
HERVE Piping routing
BARON

© 2013 – Hervé Baron


HERVE Piping design iso vs Shop iso
BARON

© 2013 – Hervé Baron


HERVE Piping Installation work process
BARON

PFD

Piping Piping Piping Stress


Plot Piping 3D
line studies & isometric OK?
Plan modelling
diagram layout drawing
Process
eqt list

Piping
1st Piping MTO: 2nd Piping MTO, isometric
for Inquiry for Order drawing
IFC

IFC
IFR IFD Final Piping
P&IDs
P&IDs P&IDs MTO

© 2013 – Hervé Baron


HERVE Quiz
BARON

Put the following tasks in order

Perform piping Material-Take-Off for first purchase

HAZOP

P&ID review between COMPANY and CONTRACTOR

Issue of IFR P&ID

P&ID IFC issue

Issue of IFD P&ID

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 1

Engineering in the Project: Role, Organization, Documents,


Generalities

General documents, Design basis and design criteria

The engineering disciplines


• PROCESS
• MECHANICAL
• SAFETY & ENVIRONMENT
• CIVIL
• PLANT LAYOUT & PIPING
• INSTRUMENTATION

© 2013 – Hervé Baron


• ELECTRICAL
HERVE Process Control System
BARON

Case of Package
controlled by Central
Process Control
System

What documents from


the package Vendor are

© 2013 – Hervé Baron


needed by the DCS
Vendor in this case?
HERVE Training Agenda
BARON
Day 1

Engineering in the Project: Role, Organization, Documents,


Generalities

General documents, Design basis and design criteria

The engineering disciplines


• PROCESS
• MECHANICAL
• SAFETY & ENVIRONMENT
• CIVIL
• PLANT LAYOUT & PIPING
• INSTRUMENTATION

© 2013 – Hervé Baron


• ELECTRICAL
HERVE Electrical consumer list
BARON

© 2013 – Hervé Baron


© 2013 – Hervé Baron

BARON
HERVE
© 2013 – Hervé Baron

BARON
HERVE
HERVE Quiz: Electrical Engineering input data
BARON
Guess the title of the documents

Process Piping &


Layout
Document?
Document?
Electrical Electrical

Vendor Document? Equipment


Electrical specs
Document?
Document?

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 2

Hands-on – mini EPC Project

Key aspects of Engineering


• The Technical baseline: the Contractual requirements
• Engineering organization, split of Work and resources
• Interfaces between disciplines
• BASIC vs DETAIL design
• Document control
• Engineering Interface with Procurement, Construction, Third Parties
• IT
• Management of changes

© 2013 – Hervé Baron


HERVE Define the Engineering schedule
BARON

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 2

Hands-on – mini EPC Project

Key aspects of Engineering


• The Technical baseline: the Contractual requirements
• Engineering organization, split of Work and resources
• Interfaces between disciplines
• BASIC vs DETAIL design
• Document control
• Engineering Interface with Procurement, Construction, Third Parties
• IT
• Management of changes

© 2013 – Hervé Baron


HERVE ENDORSEMENT: case study
BARON

1. CONTRACTOR identifies, in the course of the design, that the capacity of one
utility unit foreseen in the DESIGN PACKAGE is not enough. A unit with
increased capacity is required.
2. A document part of the exclusions listed in the Endorsement Certificate
specifies that Sea Water used for cooling should be discharged no more with no

© 2013 – Hervé Baron


more than 10°C temperature increase. COMPANY now asks for 3°C. This
required CTR to put additional cooling facilities.
Discuss CTR’s entitlement to a CHANGE ORDER in each case?
62
HERVE Training Agenda
BARON
Day 2

Hands-on – mini EPC Project

Key aspects of Engineering


• The Technical baseline: the Contractual requirements
• Engineering organization, split of Work and resources
• Interfaces between disciplines
• BASIC vs DETAIL design
• Document control
• Engineering Interface with Procurement, Construction, Third Parties
• IT
• Management of changes

© 2013 – Hervé Baron


HERVE Engineering Split of work
BARON

What is the typical


share of manhours
done in home office
versus low cost
center?

Discipline Paris (%) India (%)


Process/HSE Design
Equipment
Electrical
Instrumentation

© 2013 – Hervé Baron


Civil
Piping
HERVE Engineering Split of work/Piping
BARON
Horizontal split

© 2013 – Hervé Baron


HERVE Engineering resources
BARON

Civil Designer
Job scope & purpose Preparation of design deliverables based on
Engineer’s plans
Key responsibilities • Organization and co-ordination of design
and drafting studies resulting in the
production of
• Detailed drawings
• Bill of quantities
• Etc.
• Development of drawings, models using
CAD systems
Education Diploma in Civil Engineering / Drafting
Work experience 5 years of related worked experience
Management responsibilities Organizes the work of draftsmen

© 2013 – Hervé Baron


Computer skills Drafting (CAD) softwares
HERVE Training Agenda
BARON
Day 2

Hands-on – mini EPC Project

Key aspects of Engineering


• The Technical baseline: the Contractual requirements
• Engineering organization, split of Work and resources
• Interfaces between disciplines
• BASIC vs DETAIL design
• Document control
• Engineering Interface with Procurement, Construction, Third Parties
• IT
• Management of changes

© 2013 – Hervé Baron


HERVE The Engineering work sequence
BARON
Fill the missing captions

© 2013 – Hervé Baron


HERVE Piping & Instrumentation Diagram (P&ID)
BARON

Which disciplines provide input to P&IDs?

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 2

Hands-on – mini EPC Project

Key aspects of Engineering


• The Technical baseline: the Contractual requirements
• Engineering organization, split of Work and resources
• Interfaces between disciplines
• BASIC vs DETAIL design
• Document control
• Engineering Interface with Procurement, Construction, Third Parties
• IT
• Management of changes

© 2013 – Hervé Baron


HERVE BASIC vs DETAIL design
BARON

© 2013 – Hervé Baron


HERVE Conventional scheme vs CCFT scheme
BARON

FEED CFT PROPOSAL BID APPRAISAL FID EPC

CTR commitment on LS Equipment Requisition IFP

CCFT

CCFT SELECTION OF ENGINEERING


FID EPC
CONTRACTOR CONTRACT

CCFT
Equipment Requisition IFP

© 2013 – Hervé Baron


In your opinion, what are the advantages of the CCFT
scheme
CTR commitment on LS
• For the contractor
• For the Company
HERVE Training Agenda
BARON
Day 2

Hands-on – mini EPC Project

Key aspects of Engineering


• The Technical baseline: the Contractual requirements
• Engineering organization, split of Work and resources
• Interfaces between disciplines
• BASIC vs DETAIL design
• Document control
• Engineering Interface with Procurement, Construction, Third Parties
• IT
• Management of changes

© 2013 – Hervé Baron


HERVE Origin of changes
BARON

Identify the likely impact of the Engineering reviews on the design

Plot P&IDs Design Blast ESD New New New


Plan criteria resistance logic valves instruments accesses
HAZID

HAZOP

QRA

P&ID
review
3D
model
review

© 2013 – Hervé Baron


SIL
review
HERVE Training Agenda
BARON
Day 3

The main challenge: meeting the Project schedule


• FEED
• EPC

How to control a Contractor


• The plan
• Progress measurement
• Factors that could Impact progress
• Engineering Controls and KPIs
• Engineering Quality
• Critical Points to watch

© 2013 – Hervé Baron


HERVE Critical path of an Oil & Gas Project
BARON

© 2013 – Hervé Baron


HERVE Key Engineering Milestones for an EPC
BARON

At which time (Project Month) must the following be


issued/done to support the Project execution?

• P&ID 1st issue


• LLI Material Requisition Issued for Purchase
• HAZOP
• Control valves, PSVs PO
• issue of Plot Plan IFC
• issue of IFC P&Ids
• 50% ISOs issued

© 2013 – Hervé Baron


HERVE Vendor drawings necessary for design development
BARON

© 2013 – Hervé Baron


HERVE Typical level 1 EPC Project Engineering schedule
BARON

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 3

The main challenge: meeting the Project schedule


• FEED
• EPC

How to control a Contractor


• The plan
• Progress measurement
• Factors that could Impact progress
• Engineering Controls and KPIs
• Engineering Quality
• Critical Points to watch

© 2013 – Hervé Baron


HERVE Safety Engineering
BARON

© 2013 – Hervé Baron


In your opinion, how is Safety performing?
HERVE Engineering progress KPIs
BARON

© 2013 – Hervé Baron


HERVE Training Agenda
BARON
Day 3

The main challenge: meeting the Project schedule


• FEED
• EPC

How to control a Contractor


• The plan
• Progress measurement
• Factors that could Impact progress
• Engineering Controls and KPIs
• Engineering Quality
• Critical Points to watch

© 2013 – Hervé Baron


HERVE EPC Key Engineering Milestones and benchmarks
BARON

Key Engineering Milestones for an EPC


• P&ID 1st issue
• LLI PO
• HAZOP
• 1st model review
• 1st Piping PO
• Control valves, PSVs PO
• Plot Plan IFC
• IFC P&IDs
• 50% ISOs
• Primary steel MTO Additional Milestones for Off-Shore jobs
• Primary steel drawings IFC

© 2013 – Hervé Baron


Please assign to each Milestone a schedule benchmark:
Project start + X month, for a typical 36 months Project
HERVE Engineering Manhours benchmarks
BARON

FEED: number of Home Office (H.O.) manhours per equipment


item
• ??? hours

EPC: number of H.O. manhours per equipment item


• ??? hours

EPC: number of H.O. manhours per USD of CAPEX?


• ??? hour / mln USD

EPC: number of Procurement (Buyer, Expediter, Inspector,


Transit) manhours for one Purchase Order?
• ???? manhours

© 2013 – Hervé Baron


Please guess…
HERVE Engineering Management Training
BARON
Your instructor:
Hervé Baron, Project Manager

Professional experience/positions held


• Process Engineer (2 years), Production Engineer (2 years)
• Engineering Manager (4 years) for EPC On-Shore 300mln USD Project
• Field Engineering Manager (4 years) for EPC Off-shore (FPSO) 1bln USD Project
• Project Manager (2 years) for 50mln USD EPC revamping
• Project Manager (1 year) for FEED and Basic Design
• Project Control Manager (1 year) for 100,000 manhours FEED
• Contract Manager (3 years) for 700mln USD and 1bln USD EPC

Training experience Professional experience/Companies worked with

© 2013 – Hervé Baron


Developer and instructor of IFP Training’s • TOTAL, for 4 years
• Engineering Management Training (8 sessions held), • SAIPEM, for 8 years
• Project control training (6 sessions held), • TECHNIP, for 6 years
HERVE You are Welcome!
BARON

The next session of the Engineering Management Training will be held:

Oct 23rd – 25th, 2013

Yogyakarta, Indonesia

To enroll, please contact Rhenindo:


www.rhenindo.com
Farida Andriyani, farida@rhenindo.com

© 2013 – Hervé Baron


Tel: +62 21 8493 5274 / Mob: + 62 818 737 800
See you a the training!

Vous aimerez peut-être aussi