Interconnecting piping for hook up new wells at

Guebiba cluster
Painting Report

Date : 07/02/2015 Item No 4’’-WF-900-15005 sh 1/3


Isometric No
Report No.: 001/15 4’’-WF-900-15005
Drawing No

ENVIROMENTAL CONDITIONS:

Date 07/02/2015 09/02/2015 10/02/2015 11/02/2015


Time 8H 12 H 15H 8H 12 H 15H 8H 12 H 15 H 8H 12 H 15 H
Rel. Humidity (RH) 37 37 40.4 51 35.8 37.6 54.4 46.5 37.3 69.2 52.5 56.9
Ambient Temp (Td/Tw) 15.7 15.9 15.2 13 18.4 17.5 9.2 13.1 16.8 10.4 17.5 17.3
Surface Temp (ST) 15.4 15.9 13.5 12.6 17.3 16.6 9.5 13.4 16.6 10.2 16.8 17.8
Dew Point (DP) 1 1.2 1.8 3.1 3 4 0.5 2 2.2 5 7.7 8.7
ΔT = ST - DP 14.4 14.7 11.7 9.5 14.3 12.2 9 11.4 14.6 4.8 9.1 9.1

SURFACE PREPARATION: On 07/02/2015

Surface preparation Appraisal / Value SACNA QC RESULT


Blast-cleanliness (Sa 3) √ Acceptable
Blast-cleanliness ( Sa2 1/2)
Sweep blasting
Surface profile 64 µm

COATING ACTIVITIES:
Primer Tie-coat Intermediate Finish Coat
Conventional Spray √ √ √ √
APPLICATION METHODS Airless spray
Bruch
Carboguard Carboguard Carbothane PU
DESIGNATION Carbozinc 658
893 893 134
MANUFACTURER Carboline Carboline Carboline Carboline
COATING MATERIEL 141205002A 140428022A 140428022A 120602072A
BATCH N°
141028020A 140319015A 140319015A 120602072A
COLOR Grey White White White
Dry Film thickness required according to system N°:
60µm 75µm 75µm 50µm
PCPS-01

Total film thickness ( Dry ) Required: 260µm Measured: 285µm

Number of measured 40
Maximum 300 µm
Total film thickness measured ( Dry )
Minimum 270 µm
Average 285 µm

REMARKS:

INSPECTION RESULT: Accepted ………………………..…............................................ .............................Rejected

Accepted for Contractor Accepted for Company

Name : Bouchaala Nizar Name :


Signature:------------------------------------------------------------ Signature:-----------------------------------------------------
Date :12/02/2015 Date :–––––--------------------------------------