DESIGN BRIEF: # DATE


HEAT DISSIPATION DATA
00 4-Oct-17

Client: : Lusail City District Cooling Company (L.L.C.)

Project: : DCP West Phase 1, Lusail Development - PLANT I

EPC Contractor : Qatar Kentz W.L.L (Member of the SNC-Lavalin Group)

Doc. No: 648830-0000-40EB-0101

Client Reference # : LCDCC-CP13B3-QK-REP-GEN-12003

SINGLE COMPRESSOR CHILLER

PRESENT PHASE - 30,000 TR

REVISION REGISTER
REV. DATE DESCRIPTION PREPARED REVIEWED APPROVED

00 4-Oct-2017 Design intent KK / PS YM/SS JF

file:///conversion/tmp/scratch/375283658.xls Page 1 of 4
DESIGN BRIEF - EQUIPMENT HEAT REVISION
DISSIPATION
648830-0000-40EB-0101 # DATE
West Phase 1- LUSAIL DEVELOPMENT
DCP PLANT I - Present Phase 00 4-Oct-17

Name
Losses
Plate Losses Safety Total Losses
REV Equipment Description Qty Breakdown
Power (kW) factor (kW)
(kW)
(kW)

Chillers/Pumps Room : Ground Floor


Chillers 10 2.0 20.0 10.0% 22.0
12-P-01-07 CHW Primary Pumps 5 210 10.5 52.5 10.0% 58.0
21-P-01-04 CHW Supply pumps 3 750 37.5 112.5 10.0% 124.0
53-P-01-07 CW Pumps Pumps 5 250 12.5 62.5 10.0% 69.0
Total (kW) = 273.0
Basement
21-P-11-14 CHW Return pumps 3 750 37.5 112.5 10.0% 124.0
92-P-21-22 Make-up CW pumps 2 37 1.9 3.7 10.0% 5.0
92-P-28 Make-up CHW pump 1 7.5 0.4 0.4 10.0% 1.0
92-P-31, 33, 35, 37
4 7.5 0.4 1.5 10.0% 2.0
Agitation pumps for Permeate Water Tanks
92-P-39
1 2.2 0.1 0.1 10.0% 1.0
Agitation pump CT Blowdown Tank
92-P-41
1 7.5 0.4 0.4 10.0% 1.0
CT Blowdown Pump pump
92-P-43
1 4.0 0.2 0.2 10.0% 1.0
Agitation pumpTSE Raw water Tank
92-P-45 RO Reject pump 1 15 0.8 0.8 10.0% 1.0
RO pumps & MCC 3 175 8.8 26.3 10.0% 29.0
15-P-01-02 (TES) pumps 0 132 6.6 0.0 10.0% 0.0
Total (kW) = 165.0
LV-MCC Room & VFD Room - Mezannine floor
LVMCC140,141,440,441,640,940 6 6 36.0 10.0% 40.0
Capacitor Banks- PFCC for above 6 2.4 14.4 10.0% 16.0
PLC and control accessories 1 1.5 1.5 10.0% 2.0
185 kW VFD for Cooling Tower- 51-CT-01
5 200 7 35.0 10.0% 39.0
to 07
250 kW VFD for Cooling water pumps -
5 250 8.75 43.8 10.0% 49.0
53-P-01 to 07
210 kW VFD for Primary pumps- 12-P-01
5 210 7.35 37 10.0% 41.0
to 07
Total (kW) = 187.0
Battery Room (Building Services) - Mezzanine Floor
Batteries 3 1 3 10% 4.0
UPS + Isolation Transformer 1 4 4 10% 5.0
Total (kW) = 9.0
Electrical Room- Ground floor
DB's , Sub DB's 1 5 5 10% 6.0
Total (kW) = 6.0
Fire Pump Room- Basement

file:///conversion/tmp/scratch/375283658.xls 2 of 5
DESIGN BRIEF - EQUIPMENT HEAT REVISION
DISSIPATION
648830-0000-40EB-0101 # DATE
West Phase 1- LUSAIL DEVELOPMENT
DCP PLANT I - Present Phase 00 4-Oct-17

Name
Losses
Plate Losses Safety Total Losses
REV Equipment Description Qty Breakdown
Power (kW) factor (kW)
(kW)
(kW)

- 1 150 7.5 7.5 10% 9.0


Total (kW) = 9.0

file:///conversion/tmp/scratch/375283658.xls 3 of 5
DESIGN BRIEF - EQUIPMENT HEAT REVISION
DISSIPATION
648830-0000-40EB-0101 # DATE
West Phase 1- LUSAIL DEVELOPMENT
DCP PLANT I - Present Phase 00 4-Oct-17

Name
Losses
Plate Losses Safety Total Losses
REV Equipment Description Qty Breakdown
Power (kW) factor (kW)
(kW)
(kW)

Workshop- Ground floor


Tools 1 2 2 10% 3.0
Total (kW) = 3.0
Control Room - Ground Floor
Computers and panels 1 8 8 10% 9.0
Total (kW) = 9.0
3.3 kV Switchgear Room- Ground Floor

3.3 kV Switchgear MV MCC 130/330/430 1 9 9.0 10% 10.0


3.3 kV Switchgear MV MCC 630/830 1 6 6.0 10% 7.0
Battery charger for 3.3kV Swgr 2 1 2.0 10% 3.0
Total (kW) = 10.0
3.3 kV VFD Room- Ground Floor

3.3 kV VFD - 21-P-01 to 03, 21-P-11 to13


(Note: Heat load of 2 nos standby VFD not 6 800 28 168.0 10% 185.0
considered in calculation)

Total (kW) = 185.0


Transformers room - Ground Floor (To be Ventilated only)
LV Transformers - TRF LV (1.6 MVVA)
6 12.5 75.0 10% 83.0
(TRF140/141/440/441/640/940)
MV Transformer - TRF-MV (3.0 MVA)
3 18 54.0 10% 60.0
(TRF-130/330/430)
MV Transformer - TRF-MV (2.0 MVA)
2 14 28.0 10% 31.0
(TRF-630/830)
2500A Bus duct for LV MCC in
120 0.5 60.0 10% 66.0
Transformer room (120 m)
Total (kW) = 240.0
11 kV Chiller Soft Starter Room
11 kV Chiller soft starter - Ground Floor
10 2 20.0 10% 22.0
CH - 01-10
Total (kW) = 22.0
11 kV Switchgear Rooms Switchgear Room #1, #2 and #3
11KV switchgear Room # 1 - HVS 1/2, 3,
1 17 17.0 10% 19.0
4/5 + Battery charger
11KV switchgear Room # 2 - HVS 6/7, 8,
1 17 17.0 10% 19.0
9/10 + Battery charger
11KV switchgear Room # 3 - HVS 11/12,
0 14 0.0 10% 0.0
13, 14/15 + Battery charger

Total (kW) = 38.0

file:///conversion/tmp/scratch/375283658.xls 4 of 5
DESIGN BRIEF - EQUIPMENT HEAT REVISION
DISSIPATION
648830-0000-40EB-0101 # DATE
West Phase 1- LUSAIL DEVELOPMENT
DCP PLANT I - Present Phase 00 4-Oct-17

Name
Losses
Plate Losses Safety Total Losses
REV Equipment Description Qty Breakdown
Power (kW) factor (kW)
(kW)
(kW)

Grand Total kW Losses = kW 1156.0

Grand Equivalent RT = RT 328.7

Notes :
1-) The heat loss are calculated based on the quantity of operational equipment of each type.
2-) Heat loss from each motor is estimated based on 5% of theMotor name plate power
3-) Heat loss from each VFD is estimated based on 3.5% of the VFD Rating
Heat dissipation from chiller is considered only from control panel. Heat dissipation from chiller motor into the
4-)
room is not to be considered because of hermetic motors.