Method of Statement Core Drilling Works

DOC: -300-MC-MST-000XX REV: 000 DATE: 27.12.2017 PAGE: 1 / 7

REVISION FOLLOW UP PAGE

HSE System Technical


Quality System
Approval Qualification Validity Approval
Approval
Approval

Description of
Revised Page Revision Date Prepared By
Revision

Rev. No 0 1 2 3 4 5 6 7 8
Date 28.12.17

This document contains information confidential and/or proprietary to ENKA and its affiliated companies that is not
to be used, disclosed, or reproduced in any form by any non-ENKA party without ENKA’s prior written permission.
All rights reserved.

The document becomes uncontrolled once printed, please check for the latest version in EDMS prior to use.

1
Method of Statement Core Drilling Works
DOC: -300-MC-MST-000XX REV: 000 DATE: 27.12.2017 PAGE: 2 / 7

1.0 GENERAL

1.1. Purpose
The purpose of this method statement is to ensure that the methods and procedures shall be carried
out for the core drilling on floors and walls.
1.2. Abbreviations and Definitions

1.2.1. Abbreviations

Abbreviation/
Description
Acronym
AFC Approved for Construction
PPE Personal Protective Equipment
SDS Safety Data Sheet
TBT Tool Box Talk
MEP Manager Mechanical&Electrical Works Manager, Deputy Project Manager
HSE Health&Safety&Environment

1.2.2. Definitions

Term Meaning
QC Quality Control

2.0 ROLES AND RESPONSIBILITIES

2.1 Mechanical Field Engineer

2.1.1. Mechanical Field engineering is in charge of inspection and supervision in the area of the
drilling works and ensuring implementation and adherence to project specifications, procedures
and HSE policies.

2.1.2. Shall provide technical support to the operation of drilling works.


2.1.3. Shall coordinate with construction superintendent on execution of work.

2.7 HSE Supervisor

2.1.1. Shall be responsible for the implementation of the HSE procedures before and during the
drilling works.

2.1.2.Shall be responsible for check for any unsafe conditions on the working areas and liaise with
field Supervisor ensuring that the work is carried out as per approved project safety plan and
procedure.

2
Method of Statement Core Drilling Works
DOC: -300-MC-MST-000XX REV: 000 DATE: 27.12.2017 PAGE: 3 / 7

2.1.3 Assisting in implementation of HSE requirements on site.

3.0 Core Drilling

3.1. Hole placements size to be determined as per pipe / duct type considering insulation and sleeve
sizes as per wall/floor penetration details.

3.2. Hole placements to be marked up on last revision of AFC drawings and to be ensured that no
any clash with any other system in down floor.

3.3. Hole placements to be shared with surevey team to be mark up on site.

3.4. Operators to be trained and risk assessment to be conducted.

3.5. All equipments and handtools to be instepcted and make sure that colour coded.

3.6. Working area to be barricaded at drilling floor.

3.7. Make barricading around drilling point at down floors to prevent any accident by core droping.

3.8. Set up drilling machine on ground with anchors properly.

3.9. Check drilling machine water level

3.10. Close opened hole temprorarily to prevent any objects to drop down floor and to cause any
inury.

9.0 HEALTH, SAFETY and ENVIRONMENT

9.1 General

9.1.1. HSE Lead shall ensure that the work is performed accordance to the approved Construction
Safety Manual and precautions specified in the work permit. He shall ensure that barricades,
warning tapes, warning signs, firefighting equipment and first aid kits are readily available at the
working area.

9.1.2.Tool box talk shall be conducted on a daily basis to inform the workers of the recent safety
issues and incidents and to get feedback of any unreported unsafe acts. Feedback will then be
processed and resolved.

9.2 Accident Prevention Safety Procedures

9.2.1. All Equipment shall be checked for good conditions before commencing the work.

3
Method of Statement Core Drilling Works
DOC: -300-MC-MST-000XX REV: 000 DATE: 27.12.2017 PAGE: 4 / 7

9.2.2. Unauthorized persons shall be excluded from the area.

9.2.3. Adequate caution boards and warning signs shall be provided.

8.2.4. Only trained and authorized personnel shall perform the job.

9.2.5. On completion of job, the area shall be cleared of any materials and keep clean and tidy.

9.2.6. TBT shall be conducted to all team members prior to commencing job.

9.2.8. Risk Assessment shall be conducted and and signed by all team members.

4
Method of Statement Core Drilling Works
DOC: -300-MC-MST-000XX REV: 000 DATE: 27.12.2017 PAGE: 5 / 7

10.0 Risk Assessment

RISK ASSESSMENT FORM

Project: TAIF BUSINESS CENTER Prepared Date: 28/12/2017


Work Description: Core Drilling Works Last Revision Date: 28/12/2017

Risk (Before Precautions) Risk (After Precautions)


N Exposed
Work / Hazards Impact of Hazard Preacutions
o on
Human Environment Equipment Human Environment Equipmen
Material Transportation -Back injury due to
manual handling
-Human -Toolbox talk to be conducted prior to work.
1 -Load Fall Down -Serious Injury E2 B3 E1 E1
-Asset -Trained personnel
-Amputation
-Property Damage
-Toolbox talk to be conducted prior to work.
Equipment Set-up
-Trained personnel
-Hand injury
-Serious Injury -Poper ppe to be used, proper gloves, ear plug
2 -Noise Human E3 E1
-Amputation face shield etc.
-Electrocution
-All electrical powertools to be inspected and color coded.
-Pinch Points
-Cable Management to be followed.

5
Method of Statement Core Drilling Works
DOC: -300-MC-MST-000XX REV: 000 DATE: 27.12.2017 PAGE: 6 / 7

-Toolbox talk to be conducted prior to work.


Core Drilling -Trained personnel
-Fall from height -Fatality -Poper ppe to be used proper gloves, ear plug
3 -Hand injury -Serious Injury Human E3 face shield etc. E1
-Fire -Amputation -All electrical powertools to be inspected and color coded.
-Droping Objects -Inspected scaffolds
-Cable Management to be followed.

SEVERITY / POSSIBILITY
Medium Possibility High Possibility Very High
INCIDENT/ACCIDENT IMPACT and RISK ASSESSMENT MATRIX Remote Possibility Remote Possibility
Similar Incident Has been occurred Possibility
Has not been Has not been
has been occurred several times on Oftenly Occurred
recorded yet occurred on Sites
on sites sites on sites
Human Environment Property 1 2 3 4 5
No Injury-Near Miss No Impact-Near Miss No Damage-Near Miss
Hazardous Condition Hazardous Condition Hazardous Condition A A1 A2 A3 A4 A5
Low Impact Minor Damage
-Spill -Equipment parts
First Aid
-Medical Treatment
-Local pollution replacement B B1 B2 B3 B4 B5
-No public concern -Short term quickly
-Short term cleaning repair
Medium Damage
Medium Impact
-Equipment parts
-Spill
replacement
-Local pollution
Restircted Work Case
-No public concern
-Medium term C C1 C2 C3 C4 C5
interruption of
-Medium term
equipment usage
cleaning
-Medium term repair
Major Damage
Very high impact -Equipment parts
-Massive Spill replacement
Lost time incident
-Non compliance with -Long term interruption D D1 D2 D3 D4 D5
regulations of equipment usage
-Long term repair

6
Method of Statement Core Drilling Works
DOC: -300-MC-MST-000XX REV: 000 DATE: 27.12.2017 PAGE: 7 / 7

Environmental
Disaster
Extensive Damage
-Serious public
-Substantial loss of
concern
Equipment
Fatality / Permanent Diability -Massive Spill
-Substantial loss of E E1 E2 E3 E4 E5
-Non compliance with
plant/facility
regulations
-Proect shutdown
-Major Penalties
-Project Shutdown