Académique Documents
Professionnel Documents
Culture Documents
4. Final requirement:
Based on the above mentioned steps, the requirements for the project should
be finalized.
SITE ANALYSIS
Facilities like:
Education Health care
Recreational
Religious
Infrastructure:
Water
Energy
Drainage,
sanitation and refuse and solid waste disposal
Communication
Police protection,
fire protection
Cremation and graveyards