Vous êtes sur la page 1sur 2

0.50 10.50 0.50 0.50 10.50 0.

50

0.19 0.15 0.15 0.19


230mm Thic.
Precast Concrete
Slabs

1.20 70mm 1.20


Asphalt

0.23 0.23

1.50 1.50

0.82 0.82 0.82 0.82 0.82 Precast Concrete 0.82


Beam

1.50 Engr. Abubaker Albaity 1.50

00966538459629
3.00

00967734626151
Drainage Pipe Twitter: @AlbaityAlbaity Precast Concrete
Cantilever Beam Drainage Pipe

9.91 9.91

1.20
0.25 0.15

2.00
0.65
0.40

10.50 10.50
0.30
6.70 Precast Concrete 6.70
0.30
Block (Column)

0.60
5.20 5.20

2.00 Precast Concrete


Block (Column)

8.00

2.20 2.20

0.20 0.20
2.00

Precast Concrete
Block (Column)

2.80

2.00
Precast Concrete
Block (Column)

Drainage & Sewerage Pipe Drainage & Sewerage Pipe

8.00

1.50

Cast in situ Concrete


Foundation

Engr. Abubaker Albaity


Civil Engineer & Designer
Engr. Abubaker Albaity

23.33
00966538459629
00967734626151
Twitter: @AlbaityAlbaity

0.30
0.25

0.60
5

1.00
0.35
0.30
0.40
0.40

0.75
2.00

0.75
1.50
Precast Concrete
Cantilever Beam
Precast Concrete
Block (Column)

1.80
1.80
0.25

0.60

4
0.35
0.30
0.40
0.40

2.00

Precast Concrete
Block (Column)
1.80
0.25

0.60

3
0.35
0.30
0.40
0.40

2.00

Precast Concrete
Block (Column)
1.80
0.25

0.60

2
0.35
0.30
0.40
0.40

2.00

Precast Concrete
Block (Column)
1.80

1
Engr. Abubaker Albaity Reinforcement 25mm Dia.
0.25

To be Extended Up to Cantilever Beam


00966538459629
0.60

00967734626151
Twitter: @AlbaityAlbaity
0.30
0.40
0.40

Cast in situ Concrete


8.00
8.00

Foundation
1.50

Engr. Abubaker Albaity


Civil Engineer & Designer

Vous aimerez peut-être aussi