Académique Documents
Professionnel Documents
Culture Documents
JOB NO :A747
DOC NO : L&T/RFCL/A747/ELE/TF 14
Location :
Panel Ref :
Relay Make & Model :
Serial No :
VT & CT Ratio :
Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N
Y-N
B-N
2. Phase Over Current DMT – [ 51P ] Non Directional Current (I) – A : Time Delay- s
Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N
Y-N
B-N
3. Phase Over Current DMT – [ 51P ] Directional Current (I) – A : Time Delay- s
Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N
Y-N
B-N
4. Phase Over Current DMT – [ 51P ] Directional Current (I) – A : Time Delay- s
Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N
Y-N
B-N
Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(s)
R-N
Y-N
B-N
Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(s)
R-N
Y-N
B-N
7. Earth Over Current DMT – [ 51N ]Directional Current (I) – A : Time Delay- s
Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(ms)
R-N
Y-N
B-N
8.Earth Over Current DMT – [ 51N ]Directional Current (I) – A : Time Delay- s
Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(ms)
R-N
Y-N
B-N
1. Ground Over Current DMT – [ 51G ] Current (I) – 0.20A : Time Delay- 0.10 s
Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(s)
R-N
Y-N
B-N
2. Ground Over Current DMT – [ 51G] Current (I) – 0.20A : Time Delay- 0.10 s
Test Performed by: Witnessed by: Witnessed by:
Name: Name: Name:
Signature: Signature: Signature:
TEST REPORT FOR OC/EF PROTECTION RELAY
Doc. No. L&T/RFCL/A747/ ELE/TF 14 Date-
Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(s)
R-N
Y-N
B-N
Check List:
1. All Binary Inputs and Binary Outputs has configured as per the approved drawings
2. LED Functions has been checked and found ok.
3. Relay operations has been found satisfied and fit for service.