GOVERNMENT OF ANDHRA PRADESH

ROADS AND BUILDINGS DEPARTMENT

From To
Sri K.S.Raghava Rao M.Tech., MIE., The Executive Engineer (R&B),
Dy. Executive Engineer (R&B), R&B Division,
East Sub-division., Kakinada. Kakinada.

Letter No. ROB / L.C-7 / HC / 2013, dt.20.06.2017.

Sub: - Works (R&B) Division, Kakinada-ROB Works – “Construction of ROB in lieu


of L.C.No.7 at Railway km.12/2-4 of Samalkota - Kakinada Section on the
road from Kakinada-Rajahmundry road at Z.P. Junction to NH-214 at
Bhanugudi Junction in Kakinada City limits in E.G.Dist." – Omission/missing
of certain structures/part of structures while preparing the valuation estimates –
Representations by the land owners – Revised Structural valuation – Submitted
– Regarding.

Ref: - 1) Award No.s. 9/2015 dt.25.04.2015, 10/2015 dt.25.04.2015 & .11/2015


dt.25.08.2015 of the Land Acquisition officer and Revenue Divisional
Officer, Kakinada.
2. T.O. Letter No. LC-7/HC/2013, dated 26.12.2014 with enclosure of
Structural valuation estimates.
3) Ref. B/927/2010, dt.30.05.2016 of the Revenue Divisional Officer, Kakinada
with enclosure of Representations of certain land owners communicated vide
Endt. No.ROB / LC-7 / 2013, dt.31.05.2016 of the Executive Engineer
(R&B), Kakinada. (miss sent to RCPM sub divison).
4) Representations of certain other land owners.
5) Ref. B/927/2010, dt.25.05.2017 of the Revenue Divisional Officer, Kakinada
with enclosure of Representation of Smt Therli Venkatalakshmi
communicated vide Endt. No.ROB / LC-7 / 2013, dt.27.05.2016 of the
Executive Engineer (R&B), Kakinada.

*****

I submit that, in the reference 1st cited, the Land Acquisition Officer and Revenue
Divisional Officer, Kakinada passed the awards for acquiring the lands for construction of
R.O.B. in lieu of L.C. No.7 (Kondayyapalem Railway gate). In the reference 2nd cited
necessary structural valuation estimates for about 78 structures which are fallen in the ROB
alignment were submitted for an amount of Rs. 7,19,82,123/-.

In this connection, 7 No.s land owners on Ramaraopet side have submitted their
representations to the L.A.O. & R.D.O., Kakinada and also to the R&B Department with a
request to re-evaluate the structural compensation duly incorporating the missing items and
one namely Sri Ch SVVS Sesharao on Kondayyapalem side for inclusion of compound wall
for their vacant site vide reference 3rd to 5th cited above as follows

Sl. Name of the owner Door No. T.S. No. Remarks


No. (Sarvasri)

Ramarao peta side


1 Smt. Md. Haffizunnisa, (D.No.7-2- T.S. No.179 Rep. Dated 02.05.2016
W/o Md.Najiruddin
38/2), / 1E addressed to DEE
(R&B) East Kakinada

2 Sri I.Varadaraju, (Sri IVR (D.No.7-2-3), T.S. No.179 Rep. Dated 18.05.2016
Prathap Naidu)
/ 3A4 addressed to AEE
(R&B) RCPM with
copy to DEE
(R&B)East Kakinada

3 Ananda Saraswati (D.No.7-2-4), T.S. No.179 Rep. Dated 22.06.2016


Apartment
/ 3A6 addressed to EE (R&B)
Kakinada

4 Smt. Pokala Radhika (D.No.7-2- T.S. No.252 Rep. Dated 22.11.2015


Subhashini, W/o Subbarao 10/2),
/2 addressed to RDO &
EE (R&B) Kakinada

5 Sri Macharapu --- T.S. No.257 Rep. Dated 01.03.2016


Viswanadhamurthi
/2 addressed to RDO
Kakinada

6 Sri Terli Ravi Kishore, S/o (D.No.7-2-25), T.S. No.286 Rep. Dated 23.05.2017
Balakrishnadas, Smt.
/2 addressed to RDO &
Chappa Padmaja, W/o
Seshagiri EE (R&B) Kakinada

7 Smt. Medarapu Seshamma, (D.No.7-2-24), T.S. No.287 Rep. Dated 29.04.2016


W/o Suryanarayana
/2 addressed to RDO
Kakinada

Kondayyapalem side

1 Vacant land T.S.No.81/5 Rep. Dated 22.04.2016

Sri Chikkala SVVSN Sesha with compound C, 81/6F, addressed to RDO


Rao, wall 81/12E & Kakinada
81/13A

Accordingly, the Land Acquisition Officer and Revenue Divisional Officer,


Kakinada/Executive Engineer (R&B), Kakinada have forwarded the copies of the
representations and requested to re-compute the structure valuation so as to pay the
compensation.

In view of the above, the contest of the representations are verified at site and the
revised structural valuation proposals are prepared for the eligible items for the above 8 ns.
Land owners for an additional amount of Rs.31,02,139/- (separate statement enclosed).

The Revised structural valuation reports along with the copy of their representations
belongs to the above eight (8) land owners are herewith submitted for favour of taking
further necessary action.

Encl: 1) Revised structural valuation reports 8 Nos.


along with copy of representations in Triplicate

Yours faithfully,

Deputy Exe. Engineer (R&B),


East Sub division, Kakinada.
Name of Work: “Construction of ROB in lieu of L.C.No.7 at Railway km.12/2-4 of Samalkota - Kakinada Section on the road from
Kakinada-Rajahmundry road at Z.P. Junction to NH-214 at Bhanugudi Junction in Kakinada City limits in E.G.Dist."

STATEMENT SHOWING THE LIST OF LAND OWNERS WITH PREVIOUS VALUATION AMOUNTS & REVISED VALUATION
AMOUNTS AS PER ACTUAL STRUCTURE LOSS DULY INCLUDING THE MISSING PARTS/ITEMS OF STRUCTURES

Amount as per
Revised Variation/extra
Sl. Name of the owner the previous
valuation valuation Remarks
No. (Sarvasri) valuation
Amount amount
report
1 Smt. Md. Haffizunnisa, Rs.1,95,878/- Rs.3,75,044/- Rs.1,79,166/- Missing Stair case Head room and Portico in Ground floor
W/o Md.Najiruddin with foundation are now incorporated as per actual site
(D.No.7-2-38/2), T.S. measurements.
No.179 / 1E
2 Sri I.Varadaraju, (Sri Rs.2,65,257/- Rs.3,01,277/- Rs.36,020/- Originally 9”thick compound wall is considered due to
IVR Prathap Naidu) oversight against the actual thickness of 14”Compound wall.
(D.No.7-2-3), The same is incorporated and missing Concrete
T.S. No.179 / 3A4 floorings/ramps also included as per actual site
measurements..
3 Ananda Saraswati Rs.2,25,865/- Rs.3,56,560/- Rs.1,30,695/- Missing Septic tank and Water tank are now incorporated.
Apartment
(D.No.7-2-4),
T.S. No.179 / 3A6
4 Smt. Pokala Radhika Rs.18,20,364/- Rs.21,63,413/- Rs.3,43,049/- Missing Septic tank, Water tank and North side extended
Subhashini, W/o cantilever portion of 1st & 2nd floors are now incorporated.
Subbarao
(D.No.7-2-10/2),
T.S. No.252 / 2
5 Sri Macharapu Rs.7,63,963/- Rs.23,76,374/- Rs.16,12,409/- Originally 50% of Sqm rate is considered for unfinished
Viswanadhamurthi structure. Now the acual rate arrived duly deducting the
T.S. No.257 / 2 unexecuted items of work and the rate modified accordingly.
Missing 4th floor is included. Originally valuation is
considered upto end of 1st room ie., for 4.57m depth . Where
as the same is modified to 8.69M ie., up to 2nd column line as
per actual requirement.
6 Sri Terli Ravi Kishore, Rs.7,05,678/- Rs.13,29,153/- Rs.6,23,475/- Missing 2nd floor, balcony portions, Septic tank and
S/o Balakrishnadas, Smt. Compound wall are now incorporated.
Chappa Padmaja, W/o
Seshagiri
(D.No.7-2-25),
T.S. No.286 / 2
7 Smt. Medarapu Rs.1,33,404/- Rs.1,46,829/- Rs.13,425/- Missing Well is now incorporated.
Seshamma, W/o
Suryanarayana
(D.No.7-2-24),
T.S. No.287 / 2
8 Sri Chikkala SVVSN - nil - Rs.2,53,900/- Rs.2,53,900/- As the vacant site originally with lot of bushes, no compound
Sesha Rao, wall is noticed. The same is now incorporated as per actual
T.S. No.81/5C, 81/6F, site measurement.
81/12E & 81/13A
Total Rs.31,92,139/-