Formwork cost
No. of House Total board required
Pipe Dia (mm) shutter area (m2) depth (m) nos of board (pcs) Total Cost (sar)
connection (pcs)
200.00 997.01 1.21 0.28 2.38 20.94 3,560.50
250.00 48.13 1.46 0.33 1.97 1.22 207.76
250.00 12.03 1.46 0.33 1.97 0.31 51.94
300.00 55.01 1.76 0.38 1.63 1.68 286.14
400.00 37.82 2.33 0.48 1.24 1.53 259.78
Short Pcs
Pipe Dia (mm) Y-TEE (sar/pcs) Percentages (%) trench width (m) Total Concrete (sar/HC) Bitumen (SAR/HC)
(sar/pcs)
200.00 255.00 48.00 0.87 0.70 75.10 19.59
250.00 350.00 80.00 0.04 0.75 4.59 1.08
250.00 450.00 112.00 0.01 0.75 1.15 0.27
300.00 513.00 210.00 0.05 0.85 6.86 1.45
400.00 798.00 348.00 0.03 0.95 6.68 1.23
Total HC (nos)
Total pipes Length (lm)
Total VCP Material Cost
/House Connection