Location: agricultural tank between the control room building and GT Island Flowing Medium: Water
Introduction:
The technical department with the help of SBK is planning to install a rubber orifice sheet in the union coupling to increase the water supply pressure.
Job plan
1. Close the isolation valve ( See figure above)
2. Remove the union coupling 3. Replace existing gasket with proposed Rubber orifice 4. Install the union coupling back 5. Open the isolation valve 6. Monitor the pressure/improvement