INSPECTION REPORT

For Top Coat Painting


Report No 0362-EKL-PI-PAINTING- Date / /201

Location PAINTING SHOP System PAINT SYSTEM 4

Description Piping Steel Structure Mech Others

Weather Condition Surface Prep. Accept Reject

Time 08:00 12:00 16:00 Material Applied

Amb Temp C° C° C° Material Alumiunum Silicone

Sur. Temp C° C° C° Thinner Thinner for Silicone

R. Humidity % % % Mixing Ratio A : 60 B: 40 Thinner

Dew Point C° Batch No

DFT
No Drawing # Rev# Size Remarks
Min Max Avg.

Remarks:

EKL (Cons) EKL (QA/QC) HEP (Cons) HEP (QA/QC) ARL

Khalid
Name Pervaiz David M.Salman Khalid Muhammad Ahmad
Mahmood

Signature

Date
PAGE: /
INSPECTION REPORT
For Top Coat Painting
Report No 0362-EKL-PI-PAINTING- Date / /201

Location PAINTING SHOP System PAINT SYSTEM 3

Description Piping Steel Structure Mech Others

Weather Condition Surface Prep. Accept Reject

Time 08:00 12:00 16:00 Material Applied

Amb Temp C° C° C° Material Polyurethene Finish

Sur. Temp C° C° C° Thinner Thinner for PU

R. Humidity % % % Mixing Ratio A : 1 B: 4 Thinner

Dew Point C° Batch No

DFT
No Drawing # Rev# Size Remarks
Min Max Avg.

Remarks:

EKL (Cons) EKL (QA/QC) HEP (Cons) HEP (QA/QC) ARL

Name Pervaiz David M.Salman Khalid Khalid Mahmood Muhammad Ahmad

Signature

Date
PAGE: /
INSPECTION REPORT
For Final Painting
Report No 0362-EKL-PI-PAINTING- Date / /2015

Location System PAINT SYSTEM 3

Description Piping Steel Structure Mech Others

Weather Condition Surface Prep. Accept Reject

Time 08:00 12:00 16:00 Material Applied

Amb Temp C° C° C° Material Polyurethene Finish

Sur. Temp C° C° C° Thinner Thinner for PU

R. Humidity % % % Mixing Ratio A:1 B:4 Thinner

Dew Point C° C° C° Batch No

DFT
No Drawing # Size Remarks
Min Max Avg.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Remarks:

EKL (Cons) EKL (QA/QC) HEP (Cons) HEP (QA/QC) ARL

Name M.Irfan M.Salman Khalid Khalid Mehmood Muhammad Ahmad

Signature

Date / /2015 / /2015 / /2015 / /2015


PAGE: /
INSPECTION REPORT
For Primer Painting
Report No 0362-EKL-PI-PAINTING- Date / /201

Location PAINTING SHOP System PAINT SYSTEM 3

Description Piping Steel Structure Mech Others

Weather Condition Surface Prep. Accept Reject

Time 08:00 12:00 16:00 Material Applied

Amb Temp C° C° C° Material Hi/B Epoxy Zinc Phos.

Sur. Temp C° C° C° Thinner Thinner for Permobel

R. Humidity % % % Mixing Ratio A : 1 B: 4 Thinner

Dew Point C° Batch No

DFT
No Item Material Spec Size Profile Remarks
Min Max Avg.

Remarks:

EKL (Cons) EKL (QA/QC) HEP (Cons) HEP (QA/QC) ARL

Name Pervaiz David M.Salman Khalid Khalid Mahmood Muhammad Ahmad

Signature

Date
PAGE: /
INSPECTION REPORT
For Primer Painting

Report No 0362-ICOM-PI-PAINTING- Date / /2016

Location PAINTING SHOP System Tank Guard Storage

Description Piping Steel Structure Mech Others

Weather Condition Surface Prep. Accept Reject

Time 08:00 12:00 16:00 Material Applied

Amb Temp C° C° C° Material Tank Guard Storage

Sur. Temp C° C° C° Thinner Jotun Thinner 23

R. Humidity % % % Mixing Ratio A : 6.5 B: 1 & Thinner

Dew Point C° C° C° Nozzle TIP 517

DFT
No Material Spec Profile Remarks
Min Max Avg.

1 A.PLATE (1200mm X1800mmX12mm)


2 A.INLET FLANGE
3 A.8”FLANGED PIPE X 1300mm long
4 A.REDUCING SPOOL WITH 2 SIDED FLANGE
5 A.PIPE WITH FLANGES
6 TRAY
7 B.PLATE (1200mm X1800mmX12mm)
8 B.INLET FLANGE
9 B.8”FLANGED PIPE X 1300mm long
10 B.REDUCING SPOOL WITH 2 SIDED FLANGE
11 B.PIPE WITH FLANGES

Remarks:

ICOM QAQC JANA Chemicals QAQC Received

Name M.Salman Khalid

Signature

Date
PAGE: /