Académique Documents
Professionnel Documents
Culture Documents
ENERGY
MONOGENERATION
ELECTRIC MONOGENERATION OF
ELECTRICITY BASED ON 2 x 1.75 MW
CUMMINS ENGINES WITH NATURAL
GAS AS FUEL
SILAO, GUANAJUATO
25 de Marzo de 2017
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 1 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
INDEX
1.0 BACKGROUND
2.0 OBJECTIVES
3.0 BLOCK DIAGRAM
4.0 FLOW DIAGRAM
5.0 PIPE AND INSTRUMENTS DIAGRAM
6.0 CONTROL DIAGRAM
7.0 SAFETY LOGIC DIAGRAM
8.0 CALCULATION LOG
9.0 SCOPE OF WORKS TO DEVELOP THE GAS PIPELINE
APPENDIX
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 2 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
1.0 BACKGROUND
1.1 Is of the highest interest of the customer to have a reliable and continuous electrical energy
supply, as their activities require such conditions.
1.2 Self-generation being constructed requires of Natural gas as fuel.
1.3 Gas supply to be contracted as a new pipeline with a new reducing, regulating and measuring
station (ERRM1), close to actual station and running directly to generation platform.
TI
PEAD VALVE
UNDERGROUND
PEAD PIPE 8 in
GAS SUPPLIER SCOPE
QUOTATION SCOPE
PI SAMPLER
STUB END FLG
TI
PEAD VALVE
1.4 This report is based on a similar pipe pressure (1 bar manometric) and running 250 meters
below natural ground on a PEAD pipe type RD-13.5, between two underground registers. All
pipelines over ground to be on carbon steel under SA-106 grB as required by code.
1.5 Desired power supply to be generating at least 4 MWe, at an efficiency of 38.3% shall mean
at least 10.4 MW in fuel.
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 3 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
2.0 OBJECTIVE
Design a GAS PIPELINE to supply natural gas from devoted supplier station to electricity
generation system of 4 MW-e, 3 phases, 480 volts and 60 Hz, at KYB México site in Silao,
Guanajuato.
Design capacity should be 4 MWe with a gas velocity inside pipe of 15 m/s (maximum) and
1 bar manometric (gage).
9 bar-g
GAS
PIPELINE
ACTUAL PROJECT
SUPPLY SUPPLY
1 bar-g 1 bar-g
ERRM-1
CS SPOOL
HDPE PIPE
CS SPOOL
PWR ROOM
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 4 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 5 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 6 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
PARAMETERS OF CONTROL: Flow rate, pressure and temperature are the parameters to control in a gas
flow
DEVICES: NO control devices are on the reach of gas pipeline, as control actions are taken by valve
trains specially built. The first train is under scope of gas supplier, so amount, pressure and temperature
of gas are set by gas supplier. Flow rate and pressure are controlled by valve gas train. No temperature
control is available as supply is always under conditions of gas supplier’s pipeline.
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 7 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
PARAMETERS FOR SAFETY: Automatic closing and opening are done by valves on gas train. Alarms are
also set by gas valve train.
DEVICES: NO control devices are on the reach of gas pipeline, as control and safety are taken by valve
trains specially built. The first train is under scope of gas supplier, so amount, pressure and temperature
of gas are set by gas supplier. Flow rate and pressure are controlled by valve gas train. No temperature
control is available as supply is always under conditions of gas supplier’s pipeline.
OPERATION CONDITIONS: Gas pipeline operation is under manual condition, meaning that operator
has to operate valves under certain conditions:
Opening valves: If engines are to be operated and all operating conditions are secure and confirmed
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 8 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
8.1.2 Inlet pressure of pipeline has to be calculated at same pressure actual gas
pipeline operates: 1 bar manometric pressure and no more than 15 C of
temperature. Maximum pressure to be 4 bar.
8.1.3 All underground sections to be built with high density poliethylene pipe
8.1.5 Pressure drop must be less than 10% considering all posible conditions
8.2 CAPACITY
1 GAS CONSUMPTION
1.1 ENGINES
C1750N6C Energy, kW Natural Gas
CANT CAP Fuel electr ef kg/h m3/h m3/h SCFH m3/h
100% 100% 100% Qm TPN STD STD 15c1747m
1 1,750 4,572 1,750 38.3% 346 434 459 16,204 557
2 3,500 9,144 3,500 38.3% 692 868 918 32,408 1,113
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 9 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
NOTES
1 Calculations are set under FAPPSA natural gas analysis
2 Composition supplied by ENTERGI is theoretical, as PEMEX has to supply
3 Comparison
%content CH4 C2H6 C3H8 C4H10+ S N2 CO2
ENTERGI 83 11 6 3 103
FAPPSA 88.6 8.2 0.7 0.3 NR 1.9 0.5 100.2
2.2 ERRM2
NOT REQUIRED BY PRESSURE CONDITIONS
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 10 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
2.3 ERRM3a/b
DUNGS One per engine, on each valve train
RS251/050/275 model
2 DN50 Conection, external registration
0.55/1.5 bar.g Pr.In
0.21/0.15 bar.g Pr.Out
ND spring
ND in oriffice
550/200 Sm3/h Qv max/min
2 CALCULATIONS
4.8 9.6 14.5 19.4 MWe MWe at 38.3% efficiency
44,607 88,951 134,598 179,473 s cfh Max gas flow
1,263 2,519 3,811 5,082 m3/h Max gas flow
12.8 25.6 38.7 51.6 m/s Average velocity
0.623 0.623 0.623 0.623 kg/m3 Nat gas density at inlet conditions
786 1,568 2,373 3,164 kg/h Max gas flow
10,395 20,729 31,366 41,823 kW Energy flow
1.14 2.27 3.43 4.57 Times required energy by 2xC1750
0.99 1.98 3.00 4.00 Times 4 Mwe at average efficency
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 11 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
NPS OD,in wall th ID,in SCFHmax NPS OD,in wall th ID,in SCFHmax NPS OD,in wall th ID,in SCFHmax
3 3.5 0.216 3.068 15,875 3 3.5 0.216 3.068 22,451 3 3.5 0.216 3.068 31,750
4 4.5 0.237 4.026 33,205 4 4.5 0.237 4.026 46,959 4 4.5 0.237 4.026 66,410
6 6.625 0.28 6.065 98,530 6 6.625 0.28 6.065 139,342 6 6.625 0.28 6.065 197,059
8 8.625 0.322 7.981 200,580 8 8.625 0.322 7.981 283,663 8 8.625 0.322 7.981 401,161
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 12 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
L eq 4 6 8
cod90 0.0 0.0 28.4
cod45 0.0 0.0 6.5
tee.l a t 0.0 9.1 0.0
va l v.bol a 2.0 0.0 0.0
reducc 4.1 0.0 0.0
6.1 9.1 35.0 m
L horiz 1.0 3.0 55.8 m
L total 7.1 12.1 90.8 m
23.3 39.8 297.7 ft
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 13 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
HDPE PIPE:
8 NPS
STEEL PIPE:
8 NPS FOR GENERAL FLOW,
6 NPS FOR INDIVIDUAL FLOW,
4 NPS FOR VALVE ARRANGEMENTS
Selected Pipe diameters will produce a pressure drop of 0.02 kg/cm2 at 4 MW rate, if used to feed 8
MW generation, drop pressure raises to 0.12 kg/cm2, still aceptable. But increasing flow will produce
severe pressure drop: 0.28 kg/cm2 at 6 MW generation rate and 0.49 kg/cm2 at 8 MW rate.
9.2 Register No.1. Built underground with 100 mm thick walls, 2000 mm (L) x 2000 mm (W) x
1500 mm (D), receiving metallic pipe and connecting via stub end flanges to PEAD (High
density polyethilene) type RD-13.5, with yellow strips, 8 in diameter, that will carry natural
gas to site. Sample gas valve and venting valve are required.
9.3 HDPE pipe, 8 in diameter, for approximately 250 m length underground, 1 m below actual
soil level, run at side of existing water channel up to register No.2. Includes 2 poliethilene
gas valves, one at each end of pipe.
9.4 Register No.2. Built underground with 100 mm thick walls, 2000 mm (L) x 2000 mm (W) x
1500 mm (D), exiting metallic pipe and connecting via stub end flanges to PEAD (High density
polyethilene) type RD-13.5, with yellow strips, 8 in diameter, that will carry natural gas to
site. Sample gas valve and venting valve are required.
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 14 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
9.5 Pipe spools from register No.2 to Power room under construction, with a tee and valve to
supply future Power Room, similar in capacity of actual. Built with SA-106grB Sch.40 pipe,
fittings SA-234 WPB Sch.40 and flanges SA-105. Spool climbs from register to center of Street
between Pwr room No.1 and No.2, at 1150 mm above soil, goes to a tee looking upward to
climb control room (future connections), runs to a straight tee looking horizontal with
manual shutt off valves, one to supply power room No.1, ball valves to be certified to handle
natural gas (CONBRACO 88 A-10 A-024 fire safe), as they should serve as manual shutt off
valves in case of emergency. A bourdon type manometer and a thermometer is also
required.
9.6 For better understanding please see drawings 102-0101 to 102-0112 at appendix.
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 15 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 16 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
Flange connecting to ERRM No.1 is to be specified when valve gas train of gas supplier information is
available or at arrival of equipment.
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 17 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
APPENDIX
1. Cad drawings 100% compatible with AutoCad®
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 18 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 19 de 20
MONOGENERATION OF ELECTRICITY
ENERGY NATURAL GAS AS FUEL
KYB – ENTERGI – GAS PIPELINE ENGINEERING
Índice: CUMMINS
Elaboró: Revisó: Sección:CO/TRIGENERACION Doc: HT_KYB_GAS Eng Rev: 0
KYB SILAO 2x1.75 MW Subíndice: KYB-SILAO – INGENIERIA Fecha: 25 MZO 2017
JDS GAS PIPELINE ENG r0 Rec: GAS NATURAL
G.Corona GASODUCTO INTERIOR Hoja: 20 de 20