Vous êtes sur la page 1sur 13

CUADRO DE ALTURAS

Diferenc Altura Vol.


Cota Vol. Vol.
ia de de Acumulat
(m.s.n. Area (m2) Parcial Acumulati
cotas Dique ivo
m) (m3) vo (m3)
(m) (m) (MMC)
3,502 0.00 251.14 0.00 0.00 0.00E+00
3,503 1.00 1.00 1,398.96 825.05 825.05 8.25E-04
3,504 1.00 2.00 5,295.44 3,347.20 4,172.25 4.17E-03
3,505 1.00 3.00 ### 8,178.03 12,350.28 1.24E-02
3,506 1.00 4.00 ### 14,412.35 26,762.64 2.68E-02
3,507 1.00 5.00 ### 20,529.47 47,292.11 4.73E-02
3,508 1.00 6.00 ### 25,040.11 72,332.21 7.23E-02
3,509 1.00 7.00 ### 28,772.01 ### 1.01E-01
3,510 1.00 8.00 ### 33,954.07 ### 1.35E-01
3,511 1.00 9.00 ### 40,305.48 ### 1.75E-01
3,512 1.00 10.00 ### 49,164.57 ### 2.25E-01
3,513 1.00 11.00 ### 60,584.60 ### 2.85E-01
3,514 1.00 12.00 ### 72,958.25 ### 3.58E-01
3,515 1.00 13.00 ### 86,782.58 ### 4.45E-01
3,516 1.00 14.00 ### ### ### 5.46E-01
3,517 1.00 15.00 ### ### ### 6.64E-01
3,518 1.00 16.00 ### ### ### 7.99E-01
3,519 1.00 17.00 ### ### ### 9.68E-01
3,520 1.00 18.00 ### ### ### 1.18E+00
3,521 1.00 19.00 ### ### ### 1.42E+00
3,522 1.00 20.00 ### ### ### 1.70E+00
3,523 1.00 21.00 ### ### ### 2.01E+00
3,524 1.00 22.00 ### ### ### 2.36E+00
3,525 1.00 23.00 ### ### ### 2.75E+00
3,526 1.00 24.00 ### ### ### 3.19E+00
3,527 1.00 25.00 ### ### ### 3.66E+00
3,528 1.00 26.00 ### ### ### 4.17E+00
3,529 1.00 27.00 ### ### ### 4.71E+00
3,530 1.00 28.00 ### ### ### 5.29E+00
3,531 1.00 29.00 ### ### ### 5.91E+00
3,532 1.00 30.00 ### ### ### 6.56E+00
3,533 1.00 31.00 ### ### ### 7.25E+00
3,534 1.00 32.00
TOTAL ###
CUADRO DE ALTURAS

HVOLUMEN MUERTO
47,292.11 60,541.45 72,332.21 NAMIN = 3,507.53
3,507.00 3,507.53 3,508.00
1.8899 1.0000 VOLUMEN MUERTO
3,507.00 3,507.60 3,508.00 PREVIO 62,316.17
47,292.11 62,316.17 72,332.21
1.6667 25,040.1060 VOLUMEN TOTAL
5,288,826.66 5,862,316.17 5,906,268.35 PREVIO 3,530.93
3,530.00 3,530.93 3,531.00
1.0766 1.0000 NAMO
5,906,268.35 6,169,254.05 6,559,396.82 PREVIO 3,531.40
3,531.00 3,531.40 3,532.00
2.4835 1.0000 ENERO
799,318.00 3,122,420.44 967,593.66 PREVIO 3,531.81
3,518 3,531.81 3,519
0.0724 1.00 FEBRERO
664,107.71 -429,511.13 799,318.00 PREVIO 3,508.91
3,517 3,508.91 3,518
-0.1236 1.00 MARZO
664,107.71 -4,335,624.05 799,318.00 PREVIO 3,988.00
3,517 3,988 3,518
-0.0270 1.00 ABRIL
664,107.71 -5,228,929.28 799,318.00 PREVIO 3,988.00
3,517 3,988 3,518
-0.0229 1.00 MAYO
664,107.71 -5,462,001.78 799,318.00 PREVIO 3,988.00
3,517 3,988 3,518
-0.0221 1.00 JUNIO
546,395.41 -5,570,465.75 664,107.71 PREVIO 3,988.00
3,516 3,988 3,517
-0.0192 1.00 JULIO
546,395.41 -5,653,779.53 664,107.71 PREVIO 3,463.33
3,516 3,463.33 3,517
-0.0190 1.00 AGOSTO
546,395.41 -5,755,077.65 664,107.71 PREVIO 3,462.47
3,516 3,462.47 3,517
-0.0187 1.00 SETIEMBRE
444,853.77 -5,895,378.79 546,395.41 PREVIO 3,452.56
3,515 3,452.56 3,516
-0.0160 1.00 OCTUBRE
358,071.19 -6,056,656.76 444,853.77 PREVIO 3,366.17
3,514 3,366.17 3,516 3,984.95
-0.0135 2.00 NOVIEMBRE
285,112.94 -6,234,587.26 358,071.19 PREVIO 3,423.64
3,513 3,423.64 3,514
-0.0112 1.00 DICIEMBRE
135,058.285 -6,722,550.419 175,363.765 PREVIO 3,339.86
3,510 3,339.86 3,511
-0.0059 1.00
6,800,000.00
COTA ALTURA AREA VOLUMEN
AREA VOLUME
ACUMULAD ACUMULAD
m2 N m3
m. m. A m2 O m3 6,600,000.00
3,502 0 251.14 251.14 0.00 0.00
3,503 1 1,398.96 1,650.10 825.05 825.05 f(x) = 326564.238249999x + 5557933.15753336
R² = 0.9868421053
3,504 2 5,295.44 6,945.54 ### 4,172.25 6,400,000.00
3,505 3 11,060.63 18,006.16 ### 12,350.28
3,506 4 17,764.08 35,770.25 ### 26,762.64
6,200,000.00
3,507 5 23,294.86 59,065.10 ### 47,292.11
3,508 6 26,785.36 85,850.46 ### 72,332.21
3,509 7 30,758.66 ### ### ### 6,000,000.00
3,510 8 37,149.48 ### ### ###
3,511 9 43,461.48 ### ### ###
5,800,000.00
3,512 10 54,867.66 ### ### ###
3,513 11 66,301.55 ### ### ###
3,514 12 79,614.96 ### ### ### 5,600,000.00 ALTURA VOLUMEN
3,515 13 93,950.20 ### ### ### 3,531.00 ###
3,516 14 ### ### ### ### 3,531.40 ### 653128.5
5,400,000.00
3,517 15 ### ### ### ### 3,531.00
3,532.00 ###3,531.40 3,532.00
3,518 16 ### ### ### ### -2306457902 -2,300,290,382.18
3,519 17 ### ### ### ###
3,520 18 ### ### ### ### CUADRO NAME
3,521 19 ### ### ### ### 3,531.40 ###
3,522 20 ### ### ### ### 3,531.50 ###
3,523 21 ### ### ### ### 3,531.60 ###
3,524 22 ### ### ### ### 3,531.70 ###
3,525 23 ### ### ### ### 3,531.80 ###
3,526 24 ### ### ### ### 3,531.90 ###
3,527 25 ### ### ### ### 3,532.00 ###
3,528 26 ### ### ### ### 3,532.10 ###
3,529 27 ### ### ### ### 3,532.20 ###
3,530 28 ### ### ### ### 3,532.30 ###
3,531 29 ### ### ### ### 3,532.40
NAMO VERTEDERO PRINCIPAL ###
3,532 30 ### ### ### ### 3,532.50 ###
3,533 31 ### ### ### ### 3,532.60 ###
3,532.70 ###
3,532.80 ###
3,532.90 ###
3,533.00 ###
3,533.10 ###
3,533.20 ###
3,533.30 ###
3,533.40 ###
AREA (m2)

8,000,000.00 7,000,000.00 6,000,000.00 5,000,000.00 4,000,000.00 3,000,000.00 2,000,000.00 1,000,000.00 0.00


3,538

3,535

3,533

3,530

3,528

ALTURA (msnm)
3,525
ALTURA (msnm)

3,523

3,520

3,518

3,515

3,513

3,510

3,508

3,505

3,503

3,500

3,498

3,495

3,493

3,490

3,488

3,485
-1,000,000.00 0.00 1,000,000.00 2,000,000.00 3,000,000.00 4,000,000.00 5,000,000.00 6,000,000.00 7,000,000.00 8,000,000.00 9,000,000.00

VOLUMEN (MMC)
CALCULO DE LAS CARACTERISTICAS DE LA PRESA

VOLUMEN REQUERIDO : 5.800E+06 m3 5.80 MMC


ALTURA DE LA BASE DEL EJE 3502.0 msnm
CALCULO DEL VOLUMEN MUERTO (VM):

VM = ### m3 0.0605 MMC

CALCULO DEL NAMIN:


Con el VM se ingresa la la curva Area Volumen y se determina la altura correspondi
Reemplazando del (grafico N°03)
h= 3507.53 msnm = 5.53 m
Altura de presa requerida
NAMIN = 3507.53 m

NAMIN = 3507.60 m
H= 5.60 m VM (Diseño) 62,316.17 m3
0.062 MMC
VOLUMEN REQUERIDO (VR):
VR = ### m3

CALCULO DEL VOLUMEN TOTAL(VT)


VT = VM+VR
VT = ### m3 5.862 MMC
El valor de VT se reemplaza en grafico N°03 y se obtiene:
HR = 3530.93 msnm, Nivel de aguas necesario para satisfacer
HR = 28.93 el requerimiento hidrico del proyecto

VOLUMEN ALMACENADO VALM = 5.862E+06 m3

V
Volumen de Evaporación
EV = 10 AEV C
Vev = 9.59E+04 m3 0.096 MMC
Infiltración Vinf = C*%VA
Regular Permeabilidad : 3*1 2.110E+05 m3 0.211 MMC

VOLUMEN TOTAL ALMACENADO


VTA= ### m3 6.169 MMC
HR = 29.40 m
NAMO= 3531.40 msnm
VOL ALMACENADOVALM = 6.1675E+06 m3 6.168 MMC
CALCULO DEL NIVEL DE AGUAS MAXIMAS EXTRAORDINARIA (NAME)
NAME = NAMO +Y
Y : Tirante del vertedero, se obtuvo por el método de Piscina nivelada
Y= 0.22 m
De donde :
HE = 29.62 m
NAME = 3531.62 msnm
CALCULO DEL BORDO LIBRE NORMAL
DEBIDO AL VIENTO:
Se utilizó la fórmula de Stevenson Molitor
Fuente: seminario de presas enrocado Anexo V-6

4
ho = 0.76  0.323 VF  0.272 F

donde
F : Fetch en Kilometros
F= 1.05 Km
V= 12.0 Km/h
ho = 1.63 m
luego: ht = 1.3xho h= 2.1 m

Se utilizó la fórmula de Diakon


0.71 .0.24 0.54
h
o
= 0.0186 * V * F * P

donde
F : Fetch en metros
F= 1050.00 m
V= 3.33 m/s
P= 29.62 m
ho = 1.45 m
luego: ht = 1.3xho 2.35 5.31 6.23244346

h= 1.9 m
Consideramos los criterios dados por BUREAU OF RECLAMATION

B.L (m) B.L (m)


F (km)
normaL minimo
1.50 1.20 0.90
1.60 1.50 1.20
4.00 1.80 1.50
8.00 2.40 1.80
16.00 3.00 2.10
El FETCH para la presa en e 1.05 km

F = 1.5 km < 4 km

Por lo tanto el BORDE LIBRE para la presa sera:

B.L 1.2 m pues el FETCH es < 4.5 km

Altura de trepada de Ola : 30%


ht = 1.3xho

ht = 1.60 m

Asumimos ht = 1.60 m

CALCULO DEL BORDO LIBRE MINIMO (BMIN)

BMIN = 0.98 m

ALTURA TOTAL DE LA PRESA (H)

H = HR + h
H= 31.22

Factor de Acentamiento de la Presa:


De acuerdo al material: Presa de Enrocado Se estima un acentamiento de 1.15% de la altura máxima
de la presa en toda la vida util de embalse

Fap = 1.15H
Fap = 0.36 m
Fap = 0.48 m
H= 31.70

Altura del Dique que se encuentra dentro de l 0.00 m

H= 31.70 m

COTA CORONACION
3533.70 m

ANCHO DE CRESTA DE PRESA (W)

W = 0.24H+3

W= 10.056 m
W= 9.00 m Asumimos
CALCULO DEL TRANSITO DE AVENIDAS AL 100% DE LA MAXIMA AVENIDA PROBABLE

1. HIDROGRAMA ADIMENCIONAL SCS

Tp = 1.030 qp = 31.640 (Para 1000 años)

t/tp t q/qp q Q
(hr) . m3/s-mm m3/s
0.00 0.0 0.00 0.000 0.000
0.10 0.1 0.02 0.475 0.475
0.20 0.2 0.08 2.373 2.373
0.30 0.3 0.16 5.062 5.062
0.40 0.4 0.28 8.859 8.859
0.50 0.5 0.43 13.605 13.605
0.60 0.6 0.60 18.984 18.984
0.70 0.7 0.77 24.363 24.363
0.80 0.8 0.89 28.160 28.160
0.90 0.9 0.97 30.691 30.691
1.00 1.0 1.00 31.640 31.640
1.10 1.1 0.98 31.007 31.007
1.20 1.2 0.92 29.109 29.109
1.30 1.3 0.84 26.578 26.578
1.40 1.4 0.75 23.730 23.730
1.50 1.5 0.65 20.566 20.566
1.60 1.6 0.57 18.035 18.035
1.80 1.9 0.43 13.605 13.605
2.00 2.1 0.32 10.125 10.125
2.20 2.3 0.24 7.594 7.594
2.40 2.5 0.18 5.695 5.695
2.60 2.7 0.13 4.113 4.113
2.80 2.9 0.10 3.101 3.101
3.00 3.1 0.08 2.373 2.373
3.50 3.6 0.04 1.139 1.139
4.00 4.1 0.02 0.570 0.570
4.50 4.6 0.01 0.285 0.285
5.00 5.2 0.00 0.127 0.127

ALTURA - DESCARGA - VOLUMEN

Qs = 1.8* L * ( ∆H )^(3/2)

Considerando :
L= 10.00 m

∆t = 0.114 hrs = 412 seg

H S Qs 2S/Delta t + Q
m m3 m3/s m3/s
NAMO 3,531.40 ### 0.0000 29,939.42
3,531.50 ### 0.5692 30,257.04
3,531.60 ### 1.6100 30,575.13
3,531.70 ### 2.9577 30,893.53
3,531.80 ### 4.5537 31,212.18
3,531.90 ### 6.3640 31,531.04
3,532.00 ### 8.3656 31,850.10
3,532.10 ### 10.5419 32,169.33
3,532.20 ### 12.8798 32,488.72
3,532.30 ### 15.3687 32,808.26
3,532.40 ### 18.0000 33,127.94
3,532.50 ### 20.7664 33,447.76
3,532.60 ### 23.6616 33,767.71
3,532.70 ### 26.6801 34,087.78
3,532.80 ### 29.8170 34,407.97
3,532.90 ### 33.0681 34,728.27
3,533.00 ### 36.4294 35,048.69
3,533.10 ### 39.8975 35,369.21
3,533.20 ### 43.4692 35,689.83
3,533.30 ### 47.1414 36,010.56
3,533.40 ### 50.9117 36,331.38
3. TRANSITO DE AVENIDAS: STORAGE INDICATION METHOD

2S2 2S
 Q2 = I1  I 2  1  Q1
t t

Qe Tiempo I1 + I2 2S/ ∆ t - Q1 2S/ ∆t + Q2 Qs


m3/s hr m3/s m3/s m3/s m3/s
0.000 0.0 29,939.42 0.00
0.475 0.1 0.48 29,939.89 29,939.89 0.0009
2.373 0.2 2.85 29,942.73 29,942.74 0.0060
5.062 0.3 7.44 29,950.15 29,950.17 0.0193
8.859 0.4 13.92 29,964.02 29,964.07 0.0442
13.605 0.5 22.46 29,986.40 29,986.49 0.0844
18.984 0.6 32.59 30,018.85 30,018.99 0.1426
24.363 0.7 43.35 30,061.98 30,062.20 0.2200
28.160 0.8 52.52 30,114.19 30,114.50 0.3138
30.691 0.9 58.85 30,172.74 30,173.04 0.2944
31.640 1.0 62.33 30,234.58 30,235.07 0.4973
31.007 1.1 62.65 30,296.52 30,297.22 0.7007
29.109 1.2 60.12 30,355.74 30,356.64 0.8951
26.578 1.3 55.69 30,410.51 30,411.43 0.9171
23.730 1.4 50.31 30,459.70 30,460.82 1.1261
20.566 1.5 44.30 30,502.68 30,503.99 1.3089
18.035 1.6 38.60 30,539.82 30,541.28 1.4667
13.605 1.9 31.64 30,569.86 30,571.46 1.5944
10.125 2.1 23.73 30,591.91 30,593.59 1.6881
7.594 2.3 17.72 30,607.87 30,609.62 1.7560
5.695 2.5 13.29 30,619.35 30,621.16 1.8048
4.113 2.7 9.81 30,627.32 30,629.16 1.8387
3.101 2.9 7.21 30,632.67 30,634.54 1.8614
2.373 3.1 5.47 30,636.27 30,638.15 1.8767
1.139 3.6 3.51 30,637.90 30,639.78 1.8836
0.570 4.1 1.71 30,637.73 30,639.61 1.8829
0.285 4.6 0.86 30,636.70 30,638.58 1.8785
0.127 5.2 0.41 30,635.24 30,637.11 1.8723

CALCULO DEL NAME


CARACTERISTICAS DEL VERTEDERO DE DEMASIAS:

L= 10.00 m
h= 22.03 cm

1.6100 3531.600
1.8836 3531.62 NAME
2.9577 3531.700

CALCULO DEL NAME Y NAMO


Por tanto:
El aliviadero de una longitud de 6 metros, de acuerdo a la topografía del
vaso, al hidrograma de avenidas máximas y al tránsito de avenidas, tendrá
las siguientes características:

Nivel del NAME será : 3531.62 msnm


Evacuará un caudal igu 1.884 m3/s
Nivel del NAMO : 3531.40 msnm
Altura de sobre carga 0.22 m

En conclusión el NAME será igual a 3531.62 msnm


HIDROGRAMA DE ENTRADA Y SALIDA

35.00

30.00
Q (m3/s)

25.00

20.00

15.00

10.00

5.00

0.00
0.0 1.0 2.0 3.0 4.0 5.0 6.0

Tiempo (hr)

Hid. Entrada Hid. Salida


º

SEPTIEMB NOVIEMB DICIEMBR


CULTIVOS ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO OCTUBRE
RE RE E
31 28 31 30 31 30 31 31 30 31 30 31
PAPA
QUINUA
HABA GRANO SECO
AVENA FORRAJERA
CEBADA
ALFALFA
TOTAL (Lts/s) 220.43 296.25 -80.99 262.86 65.80 111.97 128.13 149.23 151.47 230.56 535.67 495.40
TOTAL (m3/s) 0.2204 0.2963 -0.0810 0.2629 0.0658 0.1120 0.1281 0.1492 0.1515 0.2306 0.5357 0.4954
Volumen (m3) 590,403.11 ### ### ### ### ### ### ### ### ### ### ###
Volumen en tiempo
5,616,139.85
de Estiaje (m3)

APORTE CUENCA
1,022.960 1,468.226 1,458.375 344.639 87.019 41.846 31.106 37.820 54.129 60.214 68.646 182.185
(Lts/s)
VOLUMEN TOTAL
2,739,895.73 ### ### ### ### ### 83,313.78 ### ### ### ### ###
MMC (Cuenca)
PORCENTAJE DEL
VOLUMEN 12,584,866.59
DEMANDA (m3)

VOLUMEN ALMACENADO (MMC) 5,862,316.17


MESES
REPRESA ESCALERA
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBREOCTUBRE NOVIEMBREDICIEMBRE
DEMANDA
MENSUAL 2,739,895.7 ### ### 893,305.2 233,072.5 108,464.0 83,313.8 101,298.1 140,301.1 161,278.0 177,930.5 487,963.2
REQUERIDA
VOLUMEN(M3)
MENSUAL 3,122,420.4 ### ### ### ### ### ### ### ### ### ### ###
RESTANTE (M3)
CAUDAL MENSUAL (Lt/s)) 1,022.960 1,468.226 1,458.375 344.639 87.019 41.846 31.106 37.820 54.129 60.214 68.646 182.185
CUADRO N° 11b
HIDROGRAMA UNITARIO DE MÁXIMAS AVENIDAS (Tr=500años)

DATOS :
Ac : 33.73 Km² p : 1.03 Horas
Duración : 0.25 Hora b : 2.74 Horas
Tc : 1.5 Horas p : 6.84 m^3/s/mm

Tiempo Pp. Ef. hr. Qp TIEMPO DEL HIDROGRAMA


(horas) (mm) (m3/s) to to + tp to + tb
0-1 0.00 0.00 0.00 1.03 2.74
1-2 0.00 0.00 1.00 2.03 3.74
2-3 0.00 0.00 2.00 3.03 4.74
3-4 0.00 0.00 3.00 4.03 5.74
4-5 0.00 0.00 4.00 5.03 6.74
5-6 0.00 0.00 5.00 6.03 7.74
6-7 0.00 0.00 6.00 7.03 8.74
7-8 0.00 0.03 7.00 8.03 9.74
8-9 0.38 2.57 8.00 9.03 10.74
9-10 5.99 40.986 9.00 10.03 11.74
10-11 3.83 26.20 10.00 11.03 12.74
11-12 2.24 15.30 11.00 12.03 13.74
12-13 1.93 13.21 12.00 13.03 14.74
13-14 1.56 10.67 13.00 14.03 15.74
14-15 1.61 10.99 14.00 15.03 16.74
15-16 1.41 9.66 15.00 16.03 17.74
16-17 1.44 9.87 16.00 17.03 18.74
17-18 1.47 10.06 17.00 18.03 19.74
18-19 1.00 6.81 18.00 19.03 20.74
19-20 1.01 6.89 19.00 20.03 21.74
20-21 1.02 6.97 20.00 21.03 22.74
21-22 0.77 5.28 21.00 22.03 23.74
22-23 0.78 5.32 22.00 23.03 24.74
23-24 1.04 7.15 23.00 24.03 25.74

NOTA :
Tb = 2.67*Tp donde :
Tp = 0.5*D + 0.6*Tc Ac: Área de la cuenca en Km2
qp = 0.208*A/Tp D: Duración de la lluvia en horas
Qp = qp*Pp.efec. Tc: Tiempo de concentración
Tb: Tiempo base del Hidrograma Unitario en horas
Tp: Tiempo pico al Qmáx. en horas
qp: Caudal pico al Tp. en m^3/s/mm
Qp: Caudal en m^3/s
EVAPORACION MENSUAL PROMEDIO ANUAL
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
AÑO
31 28 31 30 31 30 31 31 30 31 30 31
2003 73.3 42 45.2 79.3 99.3 116.1 124.3 90.2 91.2 2.8 63.4 66.5
2004 79.6 54 56.9 84.9 146.4 145.7 125.2 135.5 113.3 118.8 131.8 S/D
2005 66.2 58 63.5 98.4 141.9 145.8 171.7 176.6 101.7 171.2 140 S/D
2006 59.5 30 21.7 15.5 77 65.2 65 124.4 55.2 119.9 82 121.1
2007 S/D S/D 41.8 59.1 116 132.8 134.7 90.8 111.7 140.3 109.1 69.6
2008 39.2 21.3 37.1 71.4 79.5 130.3 154.5 80.6 130 125.4 118.9 S/D
2009 55.5 28.7 S/D 68.5 110.6 131.2 125.9 149.1 171 121.7 118.6 127.8
2010 75.2 65.8 83 89.6 142.1 142.4 170.5 161.2 125.2 143.4 149.7 83.6
2011 54.7 35.8 47.4 55 112.7 119 128.2 148.3 S/D S/D S/D S/D
62.90 41.95 49.58 69.08 113.94 125.39 133.33 128.52 112.41 117.94 114.19 93.72 96.91

EVAPORACION DIARIA PROMEDIO MENSUAL

ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
AÑO
31 28 31 30 31 30 31 31 30 31 30 31
2003 2.36 1.50 1.46 2.64 3.20 3.87 4.01 2.91 3.04 0.09 2.11 2.15
2004 2.57 1.93 1.84 2.83 4.72 4.86 4.04 4.37 3.78 3.83 4.39 S/D
2005 2.14 2.07 2.05 3.28 4.58 4.86 5.54 5.70 3.39 5.52 4.67 S/D
2006 1.92 1.07 0.70 0.52 2.48 2.17 2.10 4.01 1.84 3.87 2.73 3.91
2007 S/D S/D 1.35 1.97 3.74 4.43 4.35 2.93 3.72 4.53 3.64 2.25
2008 1.26 0.76 1.20 2.38 2.56 4.34 4.98 2.60 4.33 4.05 3.96 S/D
2009 1.79 1.03 S/D 2.28 3.57 4.37 4.06 4.81 5.70 3.93 3.95 4.12
2010 2.43 2.35 2.68 2.99 4.58 4.75 5.50 5.20 4.17 4.63 4.99 2.70
2011 1.76 1.28 1.53 1.83 3.64 3.97 4.14 4.78 S/D S/D S/D S/D

Vous aimerez peut-être aussi