Académique Documents
Professionnel Documents
Culture Documents
GENERAL NOTES:
1.00
1.00
IPE 300 IPE 300 003 EPI IPE 300 IPE 300 IPE 300 4. Elevations are in meters (m) related to Qatar national height datum (QNHD).
IPE 300 5. Contact surface of guardrails & handrails shall be smooth & free from burrs &
IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 sharp projections.
2.65
HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300
6. All structural steel items and handrails inclding grating, plates shall be hot
3.70
3.63 3.63 3.63 3.63 3.63 3.63 3.63 3.63 3.63 3.63 3.63 3.63 dipped galvanized steel (refer relevant specifications).
3.63 3.63 3.63 3.63 3.63 3.63
IPE 300 HEB 300 HEB 300 HEB 300 HEB 300 7. Safegrid shall be used for all gratings.
HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300
8.23
8. All bolts shall be hot-dipped galvanized.
9.00
9.00
9.00
HE 400M HE 400B HE 400B HE 400M HE 400M HE 400B HE 400B M004 EH HE 400B HE 400B HE 400M
9. For civil and structural general notes refer dwg HIA-GRL-CVL-001 Civil symbols
8.00
8.00
8.00
HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 3.50 3.50 3.50
3.50 3.50 3.50 3.50 3.50 3.50
and general notes.
10. All hot-dip-galvanized steel work damaged by welding is to be repaired by a
5.35
HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 HEB 300 proper paintwork repair procedure, such a removal of weld spatters, slags, weld
4.30
rust and re-coated with an approved by the engineer.
SECTION A-A'
IPE 400 IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 400
IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300
1.00
DETAIL A
HEB 300 HEB 300
2.65
IPE 300 IPE 300 HEB 300 HEB 300 IPE 300 IPE 300 IPE 300
DETAIL A
8.00
4.30
HEB 300 HEB 300
4.30
IPE 750x196+
IPE 300
1.30 5.50 5.50 5.50 5.50 5.50 5.50 5.50 0.60 5.50 5.50 5.50 5.50 5.50 5.50 5.50 1.30
IPE 400 IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+
ELEVATION
IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 400
DESIGN
IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300
1.00
DETAIL B
DETAIL B
2.65
IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 HEB 300 HEB 300 IPE 300 IPE 300 No scale
HEB 300 HEB 300
HE 400M IPE 300 IPE 300 IPE 300
HE 400M HE 400M HE 400M 2.60 2.60 HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M 2.60 2.60 BASE PLATE 150x200x10mm
IPE 300
HEB 300 HEB 300
9.00
7.00
7.00
DRAWN BY:
5.50
DECEMBER 2016
5.35
HEB 300 HEB 300 HEB 300 HEB 300 JOSÉ MANUEL RUBIO MENA
4.30
4.30
CHECKED & APPROVED
100x100x6mm BY: Christian Pérez Firmado digitalmente por Christian Pérez Hernández
Nombre de reconocimiento (DN): cn=Christian Pérez
Hernández, o=EKG, ou=Civil Engineer, DECEMBER 2016
Hernández
email=chrispeher@aguasdevalencia.es, c=ES
Fecha: 2016.12.17 12:39:44 +03'00'
Versión de Adobe Acrobat Reader DC: 2015.020.20042
BASE PLATE 150x200x10mm
REVIEWED & APPROVED
BY: Luis Ignacio Garcia Firmado digitalmente por Luis Ignacio Garcia Mora
Nombre de reconocimiento (DN): cn=Luis Ignacio Garcia Mora,
o=EKG, ou=Project Manager, DECEMBER 2016
Mora
email=ligarcia@aguasdevalencia.es, c=ES
1.30 5.50 5.50 5.50 5.50 5.50 5.50 5.50 0.60 5.50 5.50 5.50 5.50 5.50 5.50 5.50 1.30 Fecha: 2016.12.19 09:38:41 +03'00'
Versión de Adobe Acrobat Reader DC: 2015.020.20042
IPE 300
HAMAD
INTERNATIONAL
LAYOUT AIRPORT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
CONSULTANT & DESIGNER:
B' B' C
HE 400M IPE 300 HE 400M IPE 300 HE 400M IPE 300 HE 400M IPE 300 HE 400M IPE 300 HE 400M IPE 300 HE 400M IPE 300 HE 400M HE 400M IPE 300 HE 400M IPE 300 HE 400M IPE 300 HE 400M IPE 300 HE 400M IPE 300 HE 400M IPE 300 HE 400M IPE 300 HE 400M
EKG
1.30
A SOUTHWEST
ARCHITECTURE
IPE 300
IPE 300
IPE 300 IPE 300 IPE 300 IPE 300 IPE 300
IPE 550 IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+
7.67
B
IPE 750x196+ IPE 750x196+
IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 550
IPE 400
IPE 300
IPE 300 IPE 300 IPE 300 IPE 300 TOWER WATER PROJECT
A IPE 400 A' PACKAGE:
23.00
POLISHING TREATMENT PLANT, PUMP
7.66
D
IPE 300 IPE 300
CIVIL
7.67
IPE 550 IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 750x196+ IPE 550 F
IPE 300 IPE 300 IPE 750x196+ IPE 300 IPE 750x196+ IPE 300 IPE 750x196+ IPE 300 IPE 300 IPE 300
BUILDING STRUCTURE
GENERAL
IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300 IPE 300
G
1.30
HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M HE 400M PROJECT NO.: PHASE/PKG # REVISION:
B B C' DESIGN 2
1.30 5.50 5.50 5.50 5.50 5.50 5.50 5.50 0.60 5.50 5.50 5.50 5.50 5.50 5.50 5.50 1.30 SCALE: DRAWING NO.:
1:150
1:300 HIA-PTP-CVL-006