ID #

PROJECT START-UP
PS1000
MAJOR MILESTONES
CONSTRUCTION
MM1000
MM1010
MM1020
MM1030
MM1040
MM1050
MM1060
MM1070
MM1080
MM1090
DOCUMENT SUBMITTAL AND APPROVAL
Civil & Architectural
Subcontractor (Main subcons. only)
Concrete Repair Sub cont
CA1000
CA1010
Waterproofing
CA1020
CA1030
Gypsum ceiling Sub cont
CA1180
CA1190
Aluminum windows and Roll up shutters
CA1040
CA1050
Wood works
CA1200
CA1210
Swimming pool, Sauna Steam Room
CA1220
CA1230
Doors
CA1060
CA1070
Material (Main materials only)
Mason Work
CA1080
CA1090
Marble Work
CA1100
CA1110
Painting
CA1120
CA1130
Sanitary fixtures and Toilet accessories
CA1140
CA1150
Carpet
CA1160
CA1170
MEP Works
Material (Main materials only)
Cables / Power, Grounding & Low Current Cables
MEP1000
MEP1010
Pumps
MEP1020
MEP1030
FAN
MEP1040
MEP1050
HVAC
MEP1060
MEP1070
Panel boards
MEP1080
MEP1090
Shower Chiller
MEP1180
MEP1190
Humidifier
MEP1200
MEP1210
Elevator
MEP1220
MEP1230
Wiring devices
MEP1100
MEP1110
Lighting control system
MEP1120
MEP1130
Fire Alarm System
MEP1140
MEP1150
Lighting Fixtures
MEP1160
MEP1170
PROCUREMENT
Civil & Architectural (Material Order and Delivery)
Mason Work
PR1000
PR1010
Aluminum Windows and Roll-up Shutters
PR1340
PR1350
Doors
PR1360
PR1370
Marble Tiles
PR1020
PR1030
Painting
PR1040
PR1050
Sanitary fixtures and Toilet accessories
PR1060
PR1070
Carpet
PR1080
PR1090
MEP (Material Order and Delivery)
Cables / Power, Grounding & Low Current Cables
PR1100
PR1110
Pumps
PR1120
PR1130
FAN
PR1140
PR1150
HVAC
PR1160
PR1170
Shower Chiller
PR1280
PR1290
Humidifier
PR1300
PR1310
Elevator
PR1320
PR1330
Panel boards
PR1180
PR1190
Wiring Devices
PR1200
PR1210
Lighting control System
PR1220
PR1230
Fire Alarm System
PR1240
PR1250
Lighting Fixtures
PR1260
PR1270
CONSTRUCTION
MAIN VILLA
BASEMENT
ZONE
STRUCTURAL WORKS
MV2560
MECHANICAL WORKS
ELEVATOR
MV1000
PLUMBING WORKS
DRAINAGE SYSTEM
MV2390
WATER SUPPLY SYSTEM
MV2270
HVAC WORKS
MV2280
MV2290
MV2300
CONVEYING SYSTEM
MV2310
ELECTRICAL WORKS
LIGHTING SYSTEM
MV2090
MV2100
MV2110
KNX SYSTEM
MV2120
MV2130
MV2140
POWER OUTLET
MV2150
MV2160
MV2170
DATA SYSTEM
MV2180
MV2190
MV2200
CCTV SYSTEM & FIRE ALARM
MV2210
MV2220
MV2230
SERVANT CALL SYSTEM
MV2240
MV2250
MV2260
FINISHING WORKS
MV2320
MV2330
MV2340
MV2350
MV2360
MV2370
MV2380
GROUND FLOOR
ZONE 1 (01-07, A-K)
STRUCTURAL WORKS
MV1320
MECHANICAL WORKS
FIRE FIGHTING
MV2600
PLUMBING WORKS
DRAINAGE SYSTEM
MV1230
MV1300
WATER SUPPLY SYSTEM
MV1240
MV1250
MV1310
HVAC WORKS
MV1260
MV1270
MV1280
MV1290
ELECTRICAL WORKS
LIGHTING SYSTEM
MV1050
MV1060
MV1070
KNX SYSTEM
MV1080
MV1090
MV1100
POWER OUTLET
MV1110
MV1120
MV1130
DATA SYSTEM
MV1140
MV1150
MV1160
CCTV SYSTEM & FIRE ALARM
MV1170
MV1180
MV1190
SERVANT CALL SYSTEM
MV1200
MV1210
MV1220
FINISHING WORKS
MV1330
MV1340
MV1350
MV1360
MV1370
MV1380
MV1390
MV1400
MV1420
WET AREA
MV1410
MV1430
MV1440
ZONE 2 ( 5B-13A , D-L)
STRUCTURAL WORKS
MV2610
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
MV1450
MV1520
WATER SUPPLY SYSTEM
MV1460
MV1470
MV1530
HVAC WORKS
MV1480
MV1490
MV1500
MV1510
CONVEYING SYSTEM
MV2620
ELECTRICAL WORKS
LIGHTING SYSTEM
MV2630
MV2640
MV2650
KNX SYSTEM
MV2750
MV2760
MV2770
POWER OUTLET
MV2660
MV2670
MV2680
DATA SYSTEM
MV2690
MV2700
MV2710
CCTV SYSTEM & FIRE ALARM
MV2720
MV2730
MV2740
SERVANT CALL SYSTEM
MV2780
MV2790
MV2800
FINISHING WORKS
MV1010
MV1540
MV1550
MV1560
MV1570
MV1580
MV1590
MV1600
MV1610
WET AREA
MV1620
MV1630
MV1640
ZONE 3 ( 07-13 , A-D)
STRUCTURAL WORKS
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
MV3170
MV3180
WATER SUPPLY SYSTEM
MV3190
MV3200
MV3210
HVAC WORKS
MV3220
MV3230
MV3240
MV3250
CONVEYING SYSTEM
MV3260
ELECTRICAL WORKS
LIGHTING SYSTEM
MV2810
MV2820
MV2830
KNX SYSTEM
MV2930
MV2940
MV2950
POWER OUTLET
MV2840
MV2850
MV2860
DATA SYSTEM
MV2870
MV2880
MV2890
CCTV SYSTEM & FIRE ALARM
MV2900
MV2910
MV2920
SERVANT CALL SYSTEM
MV2960
MV2970
MV2980
FINISHING WORKS
MV1020
MV1650
MV1660
MV1670
MV1680
MV1690
MV1700
MV1710
MV1720
WET AREA
MV1730
MV1740
MV1750
ZONE 4 ( 13-15 , A-J)
STRUCTURAL WORKS
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
MV3270
MV3280
WATER SUPPLY SYSTEM
MV3290
MV3300
MV3310
HVAC WORKS
MV3320
MV3330
MV3340
MV3350
CONVEYING SYSTEM
MV3360
ELECTRICAL WORKS
LIGHTING SYSTEM
MV2990
MV3000
MV3010
KNX SYSTEM
MV3110
MV3120
MV3130
POWER OUTLET
MV3020
MV3030
MV3040
DATA SYSTEM
MV3050
MV3060
MV3070
CCTV SYSTEM & FIRE ALARM
MV3080
MV3090
MV3100
SERVANT CALL SYSTEM
MV3140
MV3150
MV3160
FINISHING WORKS
MV1030
MV1760
MV1770
MV1780
MV1790
MV1800
MV1810
MV1820
MV1830
WET AREA
MV1840
MV1850
FIRST FLOOR
ZONE (1A - 08 , A - J)
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
MV1900
MV1960
WATER SUPPLY SYSTEM
MV1910
MV1970
HVAC WORKS
MV1920
MV1930
MV1940
MV1950
CONVEYING SYSTEM
MV1980
ELECTRICAL WORKS
LIGHTING SYSTEM
MV1870
MV1880
MV1890
KNX SYSTEM
MV3370
MV3380
MV3390
POWER OUTLET
MV3400
MV3410
MV3420
DATA SYSTEM
MV3430
MV3440
MV3450
CCTV SYSTEM & FIRE ALARM
MV3460
MV3470
MV3480
SERVANT CALL SYSTEM
MV3490
MV3500
MV3510
FINISHING WORKS
MV1040
MV1990
MV2000
MV2010
MV2020
MV2030
MV2040
MV2050
WET AREA
MV2060
MV2070
MV2080
ROOF
ZONE ( 01-16 , A-N )
STRUCTURAL WORKS
MV2490
MV2550
ROOFING SYSTEM
MV2540
MECHANICAL WORKS
PLUMBING WORKS
WATER SUPPLY SYSTEM
MV3520
MV3530
HVAC WORKS
MV2460
MV2470
MV2480
ELECTRICAL WORKS
LIGHTING SYSTEM
MV2570
MV2580
MV2590
POWER OUTLET
MV2400
MV2410
MV2420
CCTV SYSTEM & FIRE ALARM
MV2430
MV2440
MV2450
FINISHING WORKS
MV2500
MV2510
MV2520
MV2530
DAILY VILLA
GROUND FLOOR
ZONE
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
DV1190
DV1260
WATER SUPPLY SYSTEM
DV1200
DV1210
DV1270
HVAC WORKS
DV1220
DV1230
DV1240
DV1250
ELECTRICAL WORKS
LIGHTING SYSTEM
DV1010
DV1020
DV1030
KNX SYSTEM
DV1040
DV1050
DV1060
POWER OUTLET
DV1070
DV1080
DV1090
DATA SYSTEM
DV1100
DV1110
DV1120
CCTV SYSTEM & FIRE ALARM
DV1130
DV1140
DV1150
SERVANT CALL SYSTEM
DV1160
DV1170
DV1180
FINISHING WORKS
DV1000
DV1280
DV1290
DV1300
DV1310
DV1320
DV1330
DV1340
DV1350
WET AREA
DV1360
DV1370
DV1380
ROOF
ZONE
ROOFING SYSTEM
DV1430
MECHANICAL WORKS
PLUMBING WORKS
WATER SUPPLY SYSTEM
DV1390
DV1420
HVAC WORKS
DV1400
DV1410
DV1530
ELECTRICAL WORKS
LIGHTING SYSTEM
DV1500
DV1510
DV1520
POWER OUTLET
DV1440
DV1450
DV1460
CCTV SYSTEM & FIRE ALARM
DV1470
DV1480
DV1490
SWIMMING POOL BUILDING
BASEMENT FLOOR
ZONE
MECHANICAL WORKS
FIRE FIGHTING
SW2080
PLUMBING WORKS
DRAINAGE SYSTEM
SW1230
SW1260
SWIMMING POOL PUMP ROOM
SW1240
SW1270
HVAC WORKS
SW1250
ELECTRICAL WORKS
LIGHTING SYSTEM
SW1050
SW1060
SW1070
KNX SYSTEM
SW1080
SW1090
SW1100
POWER OUTLET
SW1110
SW1120
SW1130
DATA SYSTEM
SW1140
SW1150
SW1160
CCTV SYSTEM & FIRE ALARM
SW1170
SW1180
SW1190
SERVANT CALL SYSTEM
SW1200
SW1210
SW1220
FINISHING WORKS
SW1280
SW1290
GROUND FLOOR
ZONE
STRUCTURAL WORKS
SW1950
MECHANICAL WORKS
FIRE FIGHTING
SW2090
PLUMBING WORKS
DRAINAGE SYSTEM
SW1860
SW1920
SW2070
WATER SUPPLY SYSTEM
SW1870
SW1930
HVAC WORKS
SW1880
SW1890
SW1900
SW1910
SW2030
SWIMMING POOL FITTINGS
SW1940
ELECTRICAL WORKS
LIGHTING SYSTEM
SW1680
SW1690
SW1700
KNX SYSTEM
SW1710
SW1720
SW1730
POWER OUTLET
SW1740
SW1750
SW1760
DATA SYSTEM
SW1770
SW1780
SW1790
CCTV SYSTEM & FIRE ALARM
SW1800
SW1810
SW1820
SERVANT CALL SYSTEM
SW1830
SW1840
SW1850
FINISHING WORKS
SW1040
SW1960
SW1970
SW1980
SW1990
SW2000
SW2010
SW2020
WET AREA
SW2040
SW2050
SW2060
MEZZANINE
ZONE
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
SW1480
SW1550
WATER SUPPLY SYSTEM
SW1490
SW1500
SW1560
HVAC WORKS
SW1510
SW1520
SW1530
SW1540
ELECTRICAL WORKS
LIGHTING SYSTEM
SW1300
SW1310
SW1320
KNX SYSTEM
SW1330
SW1340
SW1350
POWER OUTLET
SW1360
SW1370
SW1380
DATA SYSTEM
SW1390
SW1400
SW1410
CCTV SYSTEM & FIRE ALARM
SW1420
SW1430
SW1440
SERVANT CALL SYSTEM
SW1450
SW1460
SW1470
FINISHING WORKS
SW1570
SW1580
SW1590
SW1600
SW1610
SW1620
SW1630
SW1640
WET AREA
SW1650
SW1660
SW1670
ROOF
ZONE
ROOFING SYSTEM
SW2160
MECHANICAL WORKS
PLUMBING WORKS
WATER SUPPLY SYSTEM
SW2100
SW2130
HVAC WORKS
SW2110
SW2120
SW2170
ELECTRICAL WORKS
LIGHTING SYSTEM
SW2180
SW2190
SW2200
POWER OUTLET
SW1000
SW2210
SW2220
CCTV SYSTEM & FIRE ALARM
SW1010
SW1020
SW1030
FINISHING WORKS
SW2140
SW2150
STUDIO BUILDING
GROUND FLOOR
ZONE
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
STU1100
STU1130
WATER SUPPLY SYSTEM
STU1110
STU1120
STU1140
ELECTRICAL WORKS
LIGHTING SYSTEM
STU1040
KNX SYSTEM
STU1050
POWER OUTLET
STU1060
DATA SYSTEM
STU1070
CCTV SYSTEM & FIRE ALARM
STU1080
SERVANT CALL SYSTEM
STU1090
FINISHING WORKS
STU1150
STU1160
STU1170
WET AREA
STU1180
STU1190
STU1200
ROOF FLOOR
ZONE
STU1210
MECHANICAL WORKS
HVAC WORKS
STU1020
STU1030
ELECTRICAL WORKS
LIGHTING SYSTEM
STU1220
POWER OUTLET
STU1000
CCTV SYSTEM & FIRE ALARM
STU1010
TESTING AND COMMISSIONING
TC1000
TC1010
TC1020
TC1030
DEMOBILIZATION
DM1000
DM1010
DM1020
DM1030
FINAL ACTIVITY LIST
ORIGINAL
ACTIVITY NAME START
DURATION

Effective Start Date 0 01-Aug-17 A

88 18-Nov-17
Completion of Concrete Repairs 0
Completion of Block works 0
Completion of External Aluminum Windows and Roll up s 0
Completion of MEP Rough-in Service 0
Completion of Internal Finishes 0
Completion of MEP Finish Services 0
Completion of all Tests on Completion Including any Re- 0
Final Handing Over 0
Demobilization 0
Project Finish 0
41 25-Sep-17
41 25-Sep-17
41 25-Sep-17
12 25-Sep-17
Sub Contractor - Document Preparation & Submission 7 25-Sep-17
Sub Contractor - Engineer's Review & Approval 5 2-Oct-17
9 25-Sep-17
Waterproofing Subcon.- Document Preparation & Submis 7 25-Sep-17
Waterproofing Subcon.- Engineer's Review & Approval 2 2-Oct-17
22 25-Sep-17
Gypsum Ceiling works- Documents, preparation and Su 15 25-Sep-17
Gypsum ceiling works - Engineers Review & Approval 7 12-Oct-17
p shutters 28 25-Sep-17
Subcon.- Document Preparation & Submission 21 25-Sep-17
Subcon.- Engineer's Review & Approval 7 16-Oct-17
37 30-Sep-17
Wood works - Document , Preparation and Submission 30 30-Sep-17
Wood works- Engineers Review and Approval 7 4-Nov-17
37 30-Sep-17
Swimming pool, Sauna- Document preparation and Subm 30 30-Sep-17
Swimming pool, Sauna - Engineer Review and Approval 7 4-Nov-17
22 30-Sep-17
Door Subcon.- Document Preparation & Submission 15 30-Sep-17
Door Subcon.- Engineer's Review & Approval 7 15-Oct-17
42 25-Sep-17
2 25-Sep-17
Masonry Material - Document Preparation & Submission 1 25-Sep-17
Masonry Material - Engineer's Review & Approval 1 26-Sep-17
27 25-Sep-17
Marble Tiling Work Material - Document Preparation & S 20 25-Sep-17
Marble Tiling Work Material - Engineer's Review & Appro 7 15-Oct-17
22 25-Sep-17
Painting Material - Document Preparation & Submission 15 25-Sep-17
Painting Material - Engineer's Review & Approval 7 10-Oct-17
22 15-Oct-17
Sanitary fixtures Material - Document Preparation & Su 15 15-Oct-17
Sanitary fixtures Material - Engineer's Review & Approva 7 30-Oct-17
28 25-Sep-17
Carpet Material - Document Preparation & Submission 21 25-Sep-17
Carpet Material - Engineer's Review & Approval 7 16-Oct-17
19 25-Sep-17
19 25-Sep-17
Low Current Cables 9 25-Sep-17
Material - Document Preparation & Submission 2 25-Sep-17
Material - Engineer's Review & Approval 7 27-Sep-17
22 25-Sep-17
Pumps Material - Document Preparation & Submission 15 25-Sep-17
Pumps Material - Engineer's Review & Approval 7 10-Oct-17
14 25-Sep-17
Fan Material - Document Preparation & Submission 7 25-Sep-17
Fan Material - Engineer's Review & Approval 7 2-Oct-17
20 25-Sep-17
Package Unit material - Document Preparation & Submis 13 25-Sep-17
Package Unit Material - Engineer's Review & Approval 7 8-Oct-17
18 25-Sep-17
Panel board Material - Document Preparation & Submiss 11 25-Sep-17
Panel board Material - Engineer's Review & Approval 7 6-Oct-17
10 25-Sep-17
Shower Chiller Material - Document Prep & Submission 3 25-Sep-17
Shower Chiller - Engineer's Review & Approval 7 28-Sep-17
8 25-Sep-17
Humidifier Material - Document Prep & Submission 1 25-Sep-17
Humidifier - Engineer's Review & Approval 7 26-Sep-17
18 25-Sep-17
Elevator - Document Prep & Submission 12 25-Sep-17
Elevator - Engineer's Review & Approval 6 9-Oct-17
22 25-Sep-17
Material - Document Preparation & Submission 15 25-Sep-17
Material - Engineer's Review & Approval 7 10-Oct-17
22 25-Sep-17
Material - Document Preparation & Submission 15 25-Sep-17
Material - Engineer's Review & Approval 7 10-Oct-17
22 25-Sep-17
Material - Document Preparation & Submission 15 25-Sep-17
Material - Engineer's Review & Approval 7 10-Oct-17
22 25-Sep-17
Lighting Fixtures - Document Preparation & Submission 15 25-Sep-17
Lighting Fixtures - Engineer's Review & Approval 7 10-Oct-17
124 27-Sep-17
der and Delivery) 100 27-Sep-17
10 27-Sep-17
Block Order 0 27-Sep-17
Block Manufacturing & 1st Delivery 1 6-Oct-17
p Shutters 78 23-Oct-17
Material Order 0 23-Oct-17
Material Manufacturing & 1st Delivery 78 23-Oct-17
52 22-Oct-17
Door Order 0 22-Oct-17
Door Manufacturing & 1st Delivery 52 22-Oct-17
50 22-Oct-17
Marble Tile Order 0 22-Oct-17
Marble Tile Manufacturing & 1st Delivery 50 22-Oct-17
30 17-Oct-17
Paint Order 0 17-Oct-17
Paint Manufacturing & 1st Delivery 30 17-Oct-17
25 6-Nov-17
Sanitary fixture Order 0 6-Nov-17
Sanitary Fixture Manufacturing & 1st Delivery 30 6-Nov-17
90 23-Oct-17
Carpet Order 0 23-Oct-17
Carpet Manufacturing & 1st Delivery 90 23-Oct-17
118 4-Oct-17
w Current Cables 8 4-Oct-17
Cables / Power, Grounding & Low Current Cables Order 0 4-Oct-17
Manufacturing & 1st Delivery 10 4-Oct-17
60 17-Oct-17
Pumps Order 0 17-Oct-17
Pumps Manufacturing & 1st Delivery 60 17-Oct-17
60 9-Oct-17
Fan Order 0 9-Oct-17
Fan Manufacturing & 1st Delivery 60 9-Oct-17
90 15-Oct-17
Package Unit Order 0 15-Oct-17
Package unit Manufacturing & 1st Delivery 90 15-Oct-17
78 7-Oct-17
Shower Chiller Order 0 7-Oct-17
Shower Chiller Manufacturing & 1st Delivery 78 7-Oct-17
78 4-Oct-17
Humidifier Order 0 4-Oct-17
Humidifier Manufacturing & 1st Delivery 78 4-Oct-17
108 16-Oct-17
Elevator Order 0 16-Oct-17
Elevator Manufacturing & 1st Delivery 108 16-Oct-17
52 13-Oct-17
Panel board Order 0 13-Oct-17
Panel board Manufacturing & 1st Delivery 52 13-Oct-17
47 17-Oct-17
Wiring devices Order 0 17-Oct-17
Wiring devices Manufacturing & 1st Delivery 55 17-Oct-17
52 17-Oct-17
Lighting control system Order 0 17-Oct-17
Lighting control system Manufacturing & 1st Delivery 52 17-Oct-17
66 17-Oct-17
Fire Alarm System Order 0 17-Oct-17
Fire Alarm System Manufacturing & 1st Delivery 66 17-Oct-17
66 17-Oct-17
Lighting Fixtures Order 0 17-Oct-17
Lighting Fixtures Manufacturing & 1st Delivery 66 17-Oct-17
132 01-Aug-17 A
132 01-Aug-17 A
132 01-Aug-17 A
132 01-Aug-17 A
31 7-Oct-17
Construction of I-beam for the Elevator opening 31 7-Oct-17
132 25-Sep-17
6 19-Feb-18
Installaion of Elevator 6 19-Feb-18
26 25-Sep-17
26 25-Sep-17
Removal and installation of new pipes 26 25-Sep-17
11 25-Sep-17
Installation of pipes 11 25-Sep-17
73 25-Sep-17
Installation of Plenium box & Flexible duct 15 25-Sep-17
Testing for Duct 3 12-Oct-17
Installation of airoutlet & grill (3rd fix) 7 11-Dec-17
20 19-Oct-17
Installation of Elevator 20 19-Oct-17
86 25-Sep-17
86 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 10 23-Dec-17
33 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 10 22-Oct-17
76 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 10 11-Dec-17
33 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 10 22-Oct-17
86 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 10 23-Dec-17
33 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 10 22-Oct-17
106 01-Aug-17 A
Block works 5 01-Aug-17 A
Plaster works 17 19-Oct-17
Wood frame & Door installation 31 21-Dec-17
Paint 1st coat 7 8-Nov-17
Paint final coat 5 11-Dec-17
Ceiling works 21 16-Nov-17
Flooring 15 16-Nov-17
116 01-Aug-17 A
116 01-Aug-17 A
5 12-Nov-17
Elevator Struct. Slab Opening 5 12-Nov-17
83 25-Sep-17
1 25-Sep-17
Testing and Commissioning 1 25-Sep-17
71 25-Sep-17
19 25-Sep-17
Removal and Installation of Drainage pipes 15 25-Sep-17
Conduct pressure test 4 12-Oct-17
71 25-Sep-17
Installation of pipes 15 25-Sep-17
Sanitary fixtures 10 5-Dec-17
Conduct pressure test 4 12-Oct-17
66 15-Oct-17
Installation of Duct 15 15-Oct-17
Installation of Plenium box & Flexible duct 15 22-Oct-17
Testing for Duct 3 8-Nov-17
Installation of airoutlet & grill (3rd fix) 7 23-Dec-17
87 25-Sep-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
77 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 11-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
106 01-Aug-17 A
Block works 21 01-Aug-17 A
Plaster works 17 31-Oct-17
Wood frame & Door installation 31 21-Dec-17
Paint 1st coat 7 20-Nov-17
Paint final coat 5 23-Dec-17
Ceiling works 21 28-Nov-17
Flooring 15 28-Nov-17
Carpet work 7 18-Jan-18
Aluminum Windows installation 14 22-Jan-18
21 17-Oct-17
Waterproofing works 9 31-Oct-17
Wall & Floor tiles 9 25-Oct-17
Plastering in wet area 7 17-Oct-17
116 25-Sep-17
61 7-Oct-17
Column strengthening and removal 61 7-Oct-17
80 25-Sep-17
71 25-Sep-17
19 25-Sep-17
Removal and Installation of Drainage pipes 15 25-Sep-17
Conduct pressure test 4 12-Oct-17
71 25-Sep-17
Installation of pipes 15 25-Sep-17
Sanitary fixtures 10 5-Dec-17
Conduct pressure test 4 12-Oct-17
63 15-Oct-17
Installation of Duct 15 15-Oct-17
Installation of Plenium box & Flexible duct 15 22-Oct-17
Testing for Duct 3 8-Nov-17
Installation of airoutlet & grill (3rd fix) 7 19-Dec-17
1 25-Sep-17
Maintenance of Old Elevator 1 25-Sep-17
87 25-Sep-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
77 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 11-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
116 25-Sep-17
Aluminum Windows installation 14 22-Jan-18
Block works 15 7-Oct-17
Plaster works 17 24-Oct-17
Wood frame & Door installation 31 21-Dec-17
Paint 1st coat 7 16-Nov-17
Paint final coat 5 19-Dec-17
Ceiling works 21 25-Nov-17
Flooring 15 25-Nov-17
Carpet work 7 18-Jan-18
34 25-Sep-17
Waterproofing works 9 24-Oct-17
Wall & Floor tiles 9 3-Oct-17
Plastering in wet area 7 25-Sep-17
116 25-Sep-17
0
71 25-Sep-17
71 25-Sep-17
19 25-Sep-17
Removal and Installation of Drainage pipes 15 25-Sep-17
Conduct pressure test 4 12-Oct-17
71 25-Sep-17
Installation of pipes 15 25-Sep-17
Sanitary fixtures 10 5-Dec-17
Conduct pressure test 4 12-Oct-17
31 25-Sep-17
Installation of Duct 15 25-Sep-17
Installation of Plenium box & Flexible duct 15 2-Oct-17
Testing for Duct 3 19-Oct-17
Installation of airoutlet & grill (3rd fix) 7 23-Oct-17
15 25-Sep-17
Maintenance of Old Elevator 15 25-Sep-17
87 25-Sep-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
77 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 11-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
116 25-Sep-17
Aluminum Windows installation 14 22-Jan-18
Block works 17 24-Oct-17
Plaster works 17 13-Nov-17
Wood frame & Door installation 31 21-Dec-17
Paint 1st coat 7 3-Dec-17
Paint final coat 5 4-Jan-18
Ceiling works 21 11-Dec-17
Flooring 15 11-Dec-17
Carpet work 7 18-Jan-18
51 25-Sep-17
Waterproofing works 9 13-Nov-17
Wall & Floor tiles 9 3-Oct-17
Plastering in wet area 7 25-Sep-17
116 25-Sep-17
0
31 25-Sep-17
19 25-Sep-17
19 25-Sep-17
Removal and Installation of Drainage pipes 15 25-Sep-17
Conduct pressure test 4 12-Oct-17
19 25-Sep-17
Installation of pipes 15 25-Sep-17
Sanitary fixtures 10 25-Sep-17
Conduct pressure test 4 12-Oct-17
31 25-Sep-17
Installation of Duct 15 25-Sep-17
Installation of Plenium box & Flexible duct 15 2-Oct-17
Testing for Duct 3 19-Oct-17
Installation of airoutlet & grill (3rd fix) 7 23-Oct-17
1 25-Sep-17
Maintenance of Old Elevator 1 25-Sep-17
87 25-Sep-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
77 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 11-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
116 25-Sep-17
Aluminum Windows installation 14 22-Jan-18
Block works 5 13-Nov-17
Plaster works 11 19-Nov-17
Wood frame & Door installation 31 21-Dec-17
Paint 1st coat 7 2-Dec-17
Paint final coat 5 1-Nov-17
Ceiling works 10 21-Oct-17
Flooring 15 23-Nov-17
Carpet work 7 18-Jan-18
56 25-Sep-17
Waterproofing works 9 19-Nov-17
Wall & Floor tiles 9 25-Sep-17
116 25-Sep-17
116 25-Sep-17
77 25-Sep-17
12 25-Sep-17
11 25-Sep-17
Removal and installation of pipes 7 25-Sep-17
Conduct pressure test 4 3-Oct-17
5 3-Oct-17
Installation of pipes 3 3-Oct-17
Conduct pressure test 2 7-Oct-17
13 25-Sep-17
Installation of Duct 7 25-Sep-17
Installation of Plenium box & Flexible duct 3 25-Sep-17
Testing for Duct 3 28-Sep-17
Installation of airoutlet & grill (3rd fix) 7 2-Oct-17
31 18-Nov-17
Installation of Elevator 31 18-Nov-17
83 25-Sep-17
83 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 7 23-Dec-17
30 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 7 22-Oct-17
73 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 7 11-Dec-17
30 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 7 22-Oct-17
30 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 7 22-Oct-17
30 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 7 22-Oct-17
105 8-Oct-17
Aluminum Windows installation 14 22-Jan-18
Block works 21 24-Oct-17
Plaster works 17 18-Nov-17
Wood frame & Door installation 31 21-Dec-17
Paint 1st coat 7 7-Dec-17
Paint final coat 5 9-Jan-18
Ceiling works 21 16-Dec-17
Flooring 15 16-Dec-17
44 8-Oct-17
Waterproofing works 9 18-Nov-17
Wall & Floor tiles 9 16-Oct-17
Plastering in wet area 7 8-Oct-17
88 25-Sep-17
88 25-Sep-17
20 7-Oct-17
Inverted Beam ( reinf., formwork, conc.) 10 7-Oct-17
Sky Lights - Closing of Slab Openings (Reinf.,formwork,c 20 7-Oct-17
9 30-Oct-17
Installation of new waterproofing system 9 30-Oct-17
45 25-Sep-17
15 25-Sep-17
15 25-Sep-17
Installation of pipes 11 25-Sep-17
Conduct pressure test 4 8-Oct-17
45 25-Sep-17
Installation of Duct 28 7-Oct-17
HVAC equipment Installaion ( AC Package Units) 20 25-Sep-17
Testing for Duct 7 8-Nov-17
83 25-Sep-17
83 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 7 23-Dec-17
30 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 7 22-Oct-17
47 6-Nov-17
First fix 7 6-Nov-17
Second fix 7 14-Nov-17
Third fix 7 23-Dec-17
88 25-Sep-17
Block works 21 25-Sep-17
Plaster works 17 19-Oct-17
Paint 1st coat 7 18-Nov-17
Paint final coat 5 31-Dec-17
116 25-Sep-17
116 25-Sep-17
116 25-Sep-17
67 25-Sep-17
66 25-Sep-17
11 25-Sep-17
Removal and Installation of pipes 7 25-Sep-17
Conduct pressure test 4 3-Oct-17
66 25-Sep-17
Installation of pipes 7 25-Sep-17
Sanitary fixtures 5 5-Dec-17
Conduct pressure test 4 3-Oct-17
50 15-Oct-17
Installation of Duct 11 15-Oct-17
Installation of Plenium box & Flexible duct 7 28-Oct-17
Testing for Duct 3 5-Nov-17
Installation of airoutlet & grill (3rd fix) 3 9-Dec-17
87 25-Sep-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
62 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 9 26-Nov-17
77 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 11-Dec-17
64 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 26-Nov-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
64 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 26-Nov-17
112 30-Sep-17
Aluminum Windows installation 14 22-Jan-18
Block works 2 30-Sep-17
Plaster works 7 3-Oct-17
Wood frame & Door installation 3 21-Dec-17
Paint 1st coat 4 16-Nov-17
Paint final coat 5 4-Jan-18
Ceiling works 15 21-Nov-17
Flooring 15 23-Nov-17
Carpet work 7 18-Jan-18
12 4-Oct-17
Waterproofing works 3 4-Oct-17
Wall & Floor tiles 5 12-Oct-17
Plastering in wet area 4 8-Oct-17
87 25-Sep-17
87 25-Sep-17
3 25-Sep-17
Installation of new waterproofing system 3 25-Sep-17
24 25-Sep-17
11 25-Sep-17
11 25-Sep-17
Installation of pipes 7 25-Sep-17
Conduct pressure test 4 3-Oct-17
24 25-Sep-17
Installation of Duct 20 26-Sep-17
Testing for Duct 3 19-Oct-17
HVAC equipment Installaion ( AC Package Units) 20 25-Sep-17
87 25-Sep-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
77 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 11-Dec-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
116 25-Sep-17
92 25-Sep-17
92 25-Sep-17
19 25-Sep-17
1 25-Sep-17
Testing and commissioning 1 25-Sep-17
19 25-Sep-17
19 25-Sep-17
Installation of pipes 15 25-Sep-17
Conduct pressure test 4 12-Oct-17
19 25-Sep-17
Installation of equipment and pipes 15 25-Sep-17
Conduct pressure test 4 12-Oct-17
5 25-Sep-17
Testing and commissioning 5 25-Sep-17
87 25-Sep-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
77 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 11-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
34 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 22-Oct-17
73 17-Oct-17
Paint 1st coat 7 17-Oct-17
Paint final coat 5 4-Jan-18
116 25-Sep-17
116 25-Sep-17
61 7-Oct-17
Swimming pool extension 61 7-Oct-17
52 25-Sep-17
1 25-Sep-17
Testing and commissioning 1 25-Sep-17
50 25-Sep-17
29 19-Oct-17
Removal and Installation of new pipes 15 19-Oct-17
Conduct pressure test 4 6-Nov-17
Installation of sanitry fixtures 5 16-Nov-17
19 25-Sep-17
Installation of pipes 15 25-Sep-17
Conduct pressure test 4 12-Oct-17
51 25-Sep-17
Installation of Duct 21 25-Sep-17
Installation of Plenium box & Flexible duct 15 9-Oct-17
Testing for Duct 3 26-Oct-17
Installation of airoutlet & grill (3rd fix) 7 15-Nov-17
Installation of Concealed Type AC 5 25-Sep-17
31 19-Oct-17
Installation of Elevator 31 19-Oct-17
110 25-Sep-17
98 25-Sep-17
First fix 30 25-Sep-17
Second fix 15 19-Dec-17
Third fix 10 6-Jan-18
72 8-Nov-17
First fix 30 8-Nov-17
Second fix 15 2-Jan-18
Third fix 10 20-Jan-18
110 25-Sep-17
First fix 30 25-Sep-17
Second fix 15 2-Jan-18
Third fix 10 20-Jan-18
110 25-Sep-17
First fix 30 25-Sep-17
Second fix 15 2-Jan-18
Third fix 10 20-Jan-18
110 25-Sep-17
First fix 30 25-Sep-17
Second fix 15 2-Jan-18
Third fix 10 20-Jan-18
110 25-Sep-17
First fix 30 25-Sep-17
Second fix 15 2-Jan-18
Third fix 10 20-Jan-18
116 25-Sep-17
Aluminum Windows installation 14 22-Jan-18
Block works 21 25-Sep-17
Plaster works 17 13-Dec-17
Wood frame & Door installation 31 2-Jan-18
Paint 1st coat 7 6-Jan-18
Paint final coat 5 14-Jan-18
Ceiling works 21 30-Oct-17
Flooring 15 30-Oct-17
29 11-Nov-17
Waterproofing works 9 23-Nov-17
Wall & Floor tiles 9 4-Dec-17
Plastering in wet area 7 11-Nov-17
106 25-Sep-17
106 25-Sep-17
79 25-Sep-17
19 25-Sep-17
9 25-Sep-17
Removal and Installation of pipes 5 25-Sep-17
Conduct pressure test 4 1-Oct-17
19 25-Sep-17
Installation of pipes 5 25-Sep-17
Sanitary fixtures 3 14-Oct-17
Conduct pressure test 2 1-Oct-17
58 19-Oct-17
Installation of Duct 21 19-Oct-17
Installation of Plenium box & Flexible duct 15 2-Nov-17
Testing for Duct 3 20-Nov-17
Installation of airoutlet & grill (3rd fix) 7 18-Dec-17
87 25-Sep-17
87 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 23-Dec-17
72 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 5-Dec-17
77 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 11 11-Dec-17
72 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 8-Nov-17
Third fix 11 5-Dec-17
72 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 8-Nov-17
Third fix 11 5-Dec-17
72 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 8-Nov-17
Third fix 11 5-Dec-17
106 25-Sep-17
Block works 21 25-Sep-17
Plaster works 17 19-Oct-17
Wood frame & Door installation 31 21-Dec-17
Paint 1st coat 7 8-Nov-17
Paint final coat 5 18-Dec-17
Ceiling works 21 23-Nov-17
Flooring 15 23-Nov-17
Carpet work 7 24-Dec-17
30 25-Sep-17
Waterproofing works 9 19-Oct-17
Wall & Floor tiles 9 3-Oct-17
Plastering in wet area 7 25-Sep-17
83 25-Sep-17
83 25-Sep-17
9 25-Sep-17
Installation of new waterproofing system 9 25-Sep-17
33 25-Sep-17
15 25-Sep-17
15 25-Sep-17
Installation of pipes 11 25-Sep-17
Conduct pressure test 4 8-Oct-17
24 5-Oct-17
Installation of Duct 21 5-Oct-17
Testing for Duct 3 30-Oct-17
HVAC equipment Installaion ( AC Package Units) 20 5-Oct-17
83 25-Sep-17
83 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 7 23-Dec-17
73 25-Sep-17
Third fix 7 11-Dec-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
83 25-Sep-17
First fix 7 25-Sep-17
Second fix 7 14-Oct-17
Third fix 7 23-Dec-17
12 25-Sep-17
Paint 1st coat 7 25-Sep-17
Paint final coat 5 3-Oct-17
86 25-Sep-17
86 25-Sep-17
86 25-Sep-17
56 25-Sep-17
56 25-Sep-17
14 25-Sep-17
Installation of pipes 10 25-Sep-17
Conduct pressure test 4 7-Oct-17
56 25-Sep-17
Installation of pipes 10 25-Sep-17
Sanitary fixtures 5 23-Nov-17
Conduct pressure test 4 31-Oct-17
54 1-Nov-17
10 23-Dec-17
Third fix 10 23-Dec-17
10 1-Nov-17
Third fix 10 1-Nov-17
10 11-Dec-17
Third fix 10 11-Dec-17
10 1-Nov-17
Third fix 10 1-Nov-17
10 23-Dec-17
Third fix 10 23-Dec-17
10 1-Nov-17
Third fix 10 1-Nov-17
51 25-Sep-17
Paint 1st coat 7 25-Sep-17
Paint final coat 5 14-Nov-17
Ceiling repair works 21 21-Oct-17
43 4-Oct-17
Waterproofing works 9 4-Oct-17
Wall & Floor tiles 9 13-Nov-17
Plastering in wet area 7 5-Nov-17
86 25-Sep-17
86 25-Sep-17
Installation of new waterproofing system 15 25-Sep-17
18 25-Sep-17
18 25-Sep-17
Installation of Duct 15 25-Sep-17
Testing for Duct 3 12-Oct-17
20 11-Dec-17
10 23-Dec-17
Third Fix 10 23-Dec-17
10 11-Dec-17
Third fix 10 11-Dec-17
10 23-Dec-17
Third fix 10 23-Dec-17
91 12-Nov-17
Testing and Commissioning Main Villa 45 4-Jan-18
Testing and Commissioning Daily villa 45 4-Jan-18
Testing and Commissioning Swimming Pool 45 31-Dec-17
Testing and Commissioning Studio Building 45 12-Nov-17
3 26-Feb-18
Records & As Built Drawings 3 26-Feb-18
Complete Performance Acceptance For all Work 0
Final Commissioning activity checklist prior to turnover 3 26-Feb-18
Demobilization 3 26-Feb-18
FINISH

28-Feb-18
16-Dec-17
18-Nov-17
6-Feb-18
4-Jan-18
6-Feb-18
6-Feb-18
25-Feb-18
25-Feb-18
28-Feb-18
28-Feb-18
11-Nov-17
11-Nov-17
11-Nov-17
6-Oct-17
1-Oct-17
6-Oct-17
3-Oct-17
1-Oct-17
3-Oct-17
19-Oct-17
11-Oct-17
19-Oct-17
22-Oct-17
15-Oct-17
22-Oct-17
11-Nov-17
2-Nov-17
11-Nov-17
11-Nov-17
2-Nov-17
11-Nov-17
21-Oct-17
14-Oct-17
21-Oct-17
5-Nov-17
26-Sep-17
25-Sep-17
26-Sep-17
21-Oct-17
14-Oct-17
21-Oct-17
16-Oct-17
9-Oct-17
16-Oct-17
5-Nov-17
29-Oct-17
5-Nov-17
22-Oct-17
15-Oct-17
22-Oct-17
16-Oct-17
16-Oct-17
3-Oct-17
26-Sep-17
3-Oct-17
16-Oct-17
9-Oct-17
16-Oct-17
8-Oct-17
1-Oct-17
8-Oct-17
14-Oct-17
7-Oct-17
14-Oct-17
12-Oct-17
5-Oct-17
12-Oct-17
5-Oct-17
27-Sep-17
5-Oct-17
3-Oct-17
25-Sep-17
3-Oct-17
15-Oct-17
8-Oct-17
15-Oct-17
16-Oct-17
9-Oct-17
16-Oct-17
16-Oct-17
9-Oct-17
16-Oct-17
16-Oct-17
9-Oct-17
16-Oct-17
16-Oct-17
9-Oct-17
16-Oct-17
18-Feb-18
21-Jan-18
6-Oct-17

6-Oct-17
21-Jan-18

21-Jan-18
20-Dec-17

20-Dec-17
10-Dec-17

10-Dec-17
15-Nov-17

15-Nov-17
5-Dec-17

5-Dec-17
18-Jan-18

18-Jan-18
18-Feb-18
13-Oct-17

13-Oct-17
15-Dec-17

15-Dec-17
7-Dec-17

7-Dec-17
12-Jan-18

12-Jan-18
4-Jan-18

4-Jan-18
2-Jan-18

2-Jan-18
18-Feb-18
18-Feb-18
3-Dec-17

3-Dec-17
10-Dec-17

10-Dec-17
7-Dec-17

7-Dec-17
21-Dec-17

21-Dec-17
21-Dec-17

21-Dec-17
25-Feb-18
25-Feb-18
25-Feb-18
25-Feb-18
11-Nov-17
11-Nov-17
25-Feb-18
25-Feb-18
25-Feb-18
24-Oct-17
24-Oct-17
24-Oct-17
7-Oct-17
7-Oct-17
18-Dec-17
11-Oct-17
15-Oct-17
18-Dec-17
11-Nov-17
11-Nov-17
2-Jan-18
2-Jan-18
2-Oct-17
21-Oct-17
2-Jan-18
1-Nov-17
2-Oct-17
21-Oct-17
1-Nov-17
21-Dec-17
2-Oct-17
21-Oct-17
21-Dec-17
1-Nov-17
2-Oct-17
21-Oct-17
1-Nov-17
2-Jan-18
2-Oct-17
21-Oct-17
2-Jan-18
1-Nov-17
2-Oct-17
21-Oct-17
1-Nov-17
25-Jan-18
18-Oct-17
7-Nov-17
25-Jan-18
15-Nov-17
16-Dec-17
10-Dec-17
3-Dec-17
6-Feb-18
6-Feb-18
16-Nov-17
16-Nov-17
30-Dec-17
25-Sep-17
25-Sep-17
17-Dec-17
16-Oct-17
11-Oct-17
16-Oct-17
17-Dec-17
11-Oct-17
17-Dec-17
16-Oct-17
30-Dec-17
31-Oct-17
7-Nov-17
11-Nov-17
30-Dec-17
3-Jan-18
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
23-Dec-17
2-Oct-17
21-Oct-17
23-Dec-17
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
6-Feb-18
30-Oct-17
19-Nov-17
25-Jan-18
27-Nov-17
27-Dec-17
21-Dec-17
14-Dec-17
27-Jan-18
6-Feb-18
9-Nov-17
9-Nov-17
4-Nov-17
24-Oct-17
6-Feb-18
16-Dec-17
16-Dec-17
26-Dec-17
17-Dec-17
16-Oct-17
11-Oct-17
16-Oct-17
17-Dec-17
11-Oct-17
17-Dec-17
16-Oct-17
26-Dec-17
31-Oct-17
7-Nov-17
11-Nov-17
26-Dec-17
25-Sep-17
25-Sep-17
3-Jan-18
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
23-Dec-17
2-Oct-17
21-Oct-17
23-Dec-17
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
6-Feb-18
6-Feb-18
23-Oct-17
12-Nov-17
25-Jan-18
23-Nov-17
24-Dec-17
18-Dec-17
11-Dec-17
27-Jan-18
2-Nov-17
2-Nov-17
12-Oct-17
2-Oct-17
6-Feb-18
17-Dec-17
17-Dec-17
16-Oct-17
11-Oct-17
16-Oct-17
17-Dec-17
11-Oct-17
17-Dec-17
16-Oct-17
30-Oct-17
11-Oct-17
18-Oct-17
22-Oct-17
30-Oct-17
11-Oct-17
11-Oct-17
3-Jan-18
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
23-Dec-17
2-Oct-17
21-Oct-17
23-Dec-17
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
6-Feb-18
6-Feb-18
12-Nov-17
2-Dec-17
25-Jan-18
10-Dec-17
9-Jan-18
3-Jan-18
27-Dec-17
27-Jan-18
22-Nov-17
22-Nov-17
12-Oct-17
2-Oct-17
6-Feb-18

30-Oct-17
16-Oct-17
16-Oct-17
11-Oct-17
16-Oct-17
16-Oct-17
11-Oct-17
5-Oct-17
16-Oct-17
30-Oct-17
11-Oct-17
18-Oct-17
22-Oct-17
30-Oct-17
25-Sep-17
25-Sep-17
3-Jan-18
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
23-Dec-17
2-Oct-17
21-Oct-17
23-Dec-17
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
6-Feb-18
6-Feb-18
18-Nov-17
30-Nov-17
25-Jan-18
9-Dec-17
6-Nov-17
31-Oct-17
11-Dec-17
27-Jan-18
28-Nov-17
28-Nov-17
4-Oct-17
6-Feb-18
6-Feb-18
23-Dec-17
8-Oct-17
7-Oct-17
2-Oct-17
7-Oct-17
8-Oct-17
5-Oct-17
8-Oct-17
9-Oct-17
2-Oct-17
27-Sep-17
1-Oct-17
9-Oct-17
23-Dec-17
23-Dec-17
30-Dec-17
30-Dec-17
2-Oct-17
21-Oct-17
30-Dec-17
29-Oct-17
2-Oct-17
21-Oct-17
29-Oct-17
18-Dec-17
2-Oct-17
21-Oct-17
18-Dec-17
29-Oct-17
2-Oct-17
21-Oct-17
29-Oct-17
29-Oct-17
2-Oct-17
21-Oct-17
29-Oct-17
29-Oct-17
2-Oct-17
21-Oct-17
29-Oct-17
6-Feb-18
6-Feb-18
16-Nov-17
6-Dec-17
25-Jan-18
14-Dec-17
14-Jan-18
8-Jan-18
1-Jan-18
27-Nov-17
27-Nov-17
25-Oct-17
15-Oct-17
4-Jan-18
4-Jan-18
29-Oct-17
17-Oct-17
29-Oct-17
8-Nov-17
8-Nov-17
15-Nov-17
11-Oct-17
11-Oct-17
7-Oct-17
11-Oct-17
15-Nov-17
7-Nov-17
17-Oct-17
15-Nov-17
30-Dec-17
30-Dec-17
2-Oct-17
21-Oct-17
30-Dec-17
29-Oct-17
2-Oct-17
21-Oct-17
29-Oct-17
30-Dec-17
13-Nov-17
21-Nov-17
30-Dec-17
4-Jan-18
18-Oct-17
7-Nov-17
25-Nov-17
4-Jan-18
6-Feb-18
6-Feb-18
6-Feb-18
11-Dec-17
11-Dec-17
7-Oct-17
2-Oct-17
7-Oct-17
11-Dec-17
2-Oct-17
11-Dec-17
7-Oct-17
11-Dec-17
26-Oct-17
4-Nov-17
7-Nov-17
11-Dec-17
3-Jan-18
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
5-Dec-17
2-Oct-17
21-Oct-17
5-Dec-17
23-Dec-17
2-Oct-17
21-Oct-17
23-Dec-17
7-Dec-17
2-Oct-17
21-Oct-17
7-Dec-17
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
7-Dec-17
2-Oct-17
21-Oct-17
7-Dec-17
6-Feb-18
6-Feb-18
1-Oct-17
10-Oct-17
24-Dec-17
20-Nov-17
9-Jan-18
7-Dec-17
11-Dec-17
27-Jan-18
17-Oct-17
7-Oct-17
17-Oct-17
11-Oct-17
3-Jan-18
3-Jan-18
27-Sep-17
27-Sep-17
22-Oct-17
7-Oct-17
7-Oct-17
2-Oct-17
7-Oct-17
22-Oct-17
18-Oct-17
22-Oct-17
17-Oct-17
3-Jan-18
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
23-Dec-17
2-Oct-17
21-Oct-17
23-Dec-17
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
6-Feb-18
9-Jan-18
9-Jan-18
16-Oct-17
25-Sep-17
25-Sep-17
16-Oct-17
16-Oct-17
11-Oct-17
16-Oct-17
16-Oct-17
11-Oct-17
16-Oct-17
30-Sep-17
30-Sep-17
3-Jan-18
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
23-Dec-17
2-Oct-17
21-Oct-17
23-Dec-17
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
2-Nov-17
2-Oct-17
21-Oct-17
2-Nov-17
9-Jan-18
24-Oct-17
9-Jan-18
6-Feb-18
6-Feb-18
16-Dec-17
16-Dec-17
23-Nov-17
25-Sep-17
25-Sep-17
21-Nov-17
21-Nov-17
5-Nov-17
9-Nov-17
21-Nov-17
16-Oct-17
11-Oct-17
16-Oct-17
22-Nov-17
18-Oct-17
25-Oct-17
29-Oct-17
22-Nov-17
30-Sep-17
23-Nov-17
23-Nov-17
30-Jan-18
16-Jan-18
29-Oct-17
4-Jan-18
16-Jan-18
30-Jan-18
12-Dec-17
18-Jan-18
30-Jan-18
30-Jan-18
29-Oct-17
18-Jan-18
30-Jan-18
30-Jan-18
29-Oct-17
18-Jan-18
30-Jan-18
30-Jan-18
29-Oct-17
18-Jan-18
30-Jan-18
30-Jan-18
29-Oct-17
18-Jan-18
30-Jan-18
6-Feb-18
6-Feb-18
18-Oct-17
1-Jan-18
6-Feb-18
13-Jan-18
18-Jan-18
22-Nov-17
15-Nov-17
13-Dec-17
3-Dec-17
13-Dec-17
18-Nov-17
25-Jan-18
25-Jan-18
25-Dec-17
16-Oct-17
4-Oct-17
30-Sep-17
4-Oct-17
16-Oct-17
30-Sep-17
16-Oct-17
2-Oct-17
25-Dec-17
12-Nov-17
19-Nov-17
22-Nov-17
25-Dec-17
3-Jan-18
3-Jan-18
2-Oct-17
21-Oct-17
3-Jan-18
17-Dec-17
2-Oct-17
21-Oct-17
17-Dec-17
23-Dec-17
2-Oct-17
21-Oct-17
23-Dec-17
17-Dec-17
2-Oct-17
15-Nov-17
17-Dec-17
17-Dec-17
2-Oct-17
15-Nov-17
17-Dec-17
17-Dec-17
2-Oct-17
15-Nov-17
17-Dec-17
25-Jan-18
18-Oct-17
7-Nov-17
25-Jan-18
15-Nov-17
23-Dec-17
17-Dec-17
10-Dec-17
31-Dec-17
29-Oct-17
29-Oct-17
12-Oct-17
2-Oct-17
30-Dec-17
30-Dec-17
4-Oct-17
4-Oct-17
1-Nov-17
11-Oct-17
11-Oct-17
7-Oct-17
11-Oct-17
1-Nov-17
29-Oct-17
1-Nov-17
28-Oct-17
30-Dec-17
30-Dec-17
2-Oct-17
21-Oct-17
30-Dec-17
18-Dec-17
18-Dec-17
2-Oct-17
21-Oct-17
30-Dec-17
2-Oct-17
21-Oct-17
30-Dec-17
8-Oct-17
2-Oct-17
8-Oct-17
2-Jan-18
2-Jan-18
2-Jan-18
28-Nov-17
28-Nov-17
10-Oct-17
5-Oct-17
10-Oct-17
28-Nov-17
5-Oct-17
28-Nov-17
4-Nov-17
2-Jan-18
2-Jan-18
2-Jan-18
12-Nov-17
12-Nov-17
21-Dec-17
21-Dec-17
12-Nov-17
12-Nov-17
2-Jan-18
2-Jan-18
12-Nov-17
12-Nov-17
22-Nov-17
2-Oct-17
19-Nov-17
13-Nov-17
22-Nov-17
14-Oct-17
22-Nov-17
12-Nov-17
2-Jan-18
2-Jan-18
11-Oct-17
15-Oct-17
15-Oct-17
11-Oct-17
15-Oct-17
2-Jan-18
2-Jan-18
2-Jan-18
21-Dec-17
21-Dec-17
2-Jan-18
2-Jan-18
25-Feb-18
25-Feb-18
25-Feb-18
20-Feb-18
2-Jan-18
28-Feb-18
28-Feb-18
28-Feb-18
28-Feb-18
28-Feb-18
ID #

Project Start-up
MAJOR MILESTONES
CONSTRUCTION
DOCUMENT SUBMITTAL AND APPROVAL
Civil & Architectural
Concrete Repair Sub cont
1240
1250
Waterproofing
1260
1270
Gypsum ceiling Sub cont
1000
1010
Aluminum windows and Roll up shutters
1300
1310
Wood works
1020
Swimming pool, Sauna Steam Room
1040
Doors
1360
1370
Mason Work
1440
1450
Marble Work
1480
1490
Painting
1640
1650
Sanitary fixtures and Toilet accessories
1660
Carpet
1680
1690
MEP Works
Cables / Power, Grounding & Low Current Cables
1740
1750
Pumps
1780
1790
FAN
1820
1830
HVAC
1840
1850
Panel boards
1940
1950
Shower Chiller
10040
10050
Humidifier
10080
10090
Elevator
10120
10130
Wiring devices
2000
2010
Lighting control system
2020
2030
Fire Alarm System
2080
2090
Lighting Fixtures
2140
2150
PROCUREMENT
Civil & Architectural (Material Order and Delivery)
Mason Work
2220
2230
Aluminum Windows and Roll-up Shutters
A10170
A10180
Doors
A10250
A10260
Marble Tiles
2260
2270
Painting
2420
2430
Sanitary fixtures and Toilet accessories
Carpet
2460
2470
MEP (Material Order and Delivery)
Cables / Power, Grounding & Low Current Cables
2500
2510
Pumps
2540
2550
FAN
2580
2590
HVAC
2600
2610
Shower Chiller
A10060
A10070
Humidifier
A10100
A10110
Elevator
A10140
A10150
Panel boards
2700
2710
Wiring Devices
2760
2770
Lighting control System
2780
2790
Fire Alarm System
2840
2850
Lighting Fixtures
2900
2910
CONSTRUCTION
MAIN VILLA
BASEMENT
ZONE
STRUCTURAL WORKS
A8470
MECHANICAL WORKS
ELEVATOR
PLUMBING WORKS
DRAINAGE SYSTEM
A4460
WATER SUPPLY SYSTEM
A4250
HVAC WORKS
A4280
CONVEYING SYSTEM
ELECTRICAL WORKS
LIGHTING SYSTEM
A4060
A4070
KNX SYSTEM
A4090
A4100
POWER OUTLET
A4120
A4130
DATA SYSTEM
A4150
A4160
CCTV SYSTEM & FIRE ALARM
A4180
A4190
SERVANT CALL SYSTEM
A4210
A4220
FINISHING WORKS
A4350
A4360
GROUND FLOOR
ZONE 1 (01-07, A-K)
STRUCTURAL WORKS
MECHANICAL WORKS
FIRE FIGHTING
PLUMBING WORKS
DRAINAGE SYSTEM
A1370
A1440
WATER SUPPLY SYSTEM
A1380
HVAC WORKS
A1400
ELECTRICAL WORKS
LIGHTING SYSTEM
A1190
A1200
KNX SYSTEM
A1220
A1230
POWER OUTLET
A1250
A1260
DATA SYSTEM
A1280
A1290
CCTV SYSTEM & FIRE ALARM
A1310
A1320
SERVANT CALL SYSTEM
A1340
A1350
FINISHING WORKS
A1500
WET AREA
ZONE 2 ( 5B-13A , D-L)
STRUCTURAL WORKS
A8660
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
A1810
WATER SUPPLY SYSTEM
A1820
HVAC WORKS
CONVEYING SYSTEM
ELECTRICAL WORKS
LIGHTING SYSTEM
A9030
A9040
KNX SYSTEM
A9150
A9160
POWER OUTLET
A9060
A9070
DATA SYSTEM
A9090
A9100
CCTV SYSTEM & FIRE ALARM
A9120
A9130
SERVANT CALL SYSTEM
A9180
FINISHING WORKS
A1920
WET AREA
A2000
A2010
A2020
ZONE 3 ( 07-13 , A-D)
STRUCTURAL WORKS
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
A9570
WATER SUPPLY SYSTEM
A9590
HVAC WORKS
CONVEYING SYSTEM
ELECTRICAL WORKS
LIGHTING SYSTEM
A9210
A9220
KNX SYSTEM
A9330
A9340
POWER OUTLET
A9240
A9250
DATA SYSTEM
A9270
A9280
CCTV SYSTEM & FIRE ALARM
A9300
A9310
SERVANT CALL SYSTEM
A9360
FINISHING WORKS
A2310
WET AREA
A2400
A2410
ZONE 4 ( 13-15 , A-J)
STRUCTURAL WORKS
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
A9670
WATER SUPPLY SYSTEM
A9690
A9700
HVAC WORKS
CONVEYING SYSTEM
ELECTRICAL WORKS
LIGHTING SYSTEM
A9390
A9400
KNX SYSTEM
A9510
A9520
POWER OUTLET
A9420
A9430
DATA SYSTEM
A9450
A9460
CCTV SYSTEM & FIRE ALARM
A9480
A9490
SERVANT CALL SYSTEM
A9540
FINISHING WORKS
A2750
WET AREA
A2790
A2800
FIRST FLOOR
ZONE (1A - 08 , A - J)
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
WATER SUPPLY SYSTEM
HVAC WORKS
CONVEYING SYSTEM
ELECTRICAL WORKS
LIGHTING SYSTEM
A2820
A2830
KNX SYSTEM
A9770
A9780
POWER OUTLET
A9800
A9810
DATA SYSTEM
A9830
A9840
CCTV SYSTEM & FIRE ALARM
A9860
A9870
SERVANT CALL SYSTEM
A9890
A9900
FINISHING WORKS
A3110
WET AREA
ROOF
ZONE ( 01-16 , A-N )
STRUCTURAL WORKS
A8320
A8450
ROOFING SYSTEM
MECHANICAL WORKS
PLUMBING WORKS
WATER SUPPLY SYSTEM
A9920
A9930
HVAC WORKS
ELECTRICAL WORKS
LIGHTING SYSTEM
POWER OUTLET
CCTV SYSTEM & FIRE ALARM
FINISHING WORKS
A8330
A8340
DAILY VILLA
GROUND FLOOR
ZONE
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
A3410
WATER SUPPLY SYSTEM
HVAC WORKS
A3440
ELECTRICAL WORKS
LIGHTING SYSTEM
A3230
A3240
KNX SYSTEM
A3260
POWER OUTLET
A3290
DATA SYSTEM
A3320
CCTV SYSTEM & FIRE ALARM
A3350
SERVANT CALL SYSTEM
A3380
FINISHING WORKS
A3530
A3540
WET AREA
A3610
ROOF
ZONE
ROOFING SYSTEM
A4820
MECHANICAL WORKS
PLUMBING WORKS
WATER SUPPLY SYSTEM
HVAC WORKS
ELECTRICAL WORKS
LIGHTING SYSTEM
POWER OUTLET
CCTV SYSTEM & FIRE ALARM
SWIMMING POOL BUILDING
BASEMENT FLOOR
ZONE
MECHANICAL WORKS
FIRE FIGHTING
PLUMBING WORKS
DRAINAGE SYSTEM
A5010
SWIMMING POOL PUMP ROOM
HVAC WORKS
ELECTRICAL WORKS
LIGHTING SYSTEM
A4830
A4840
KNX SYSTEM
A4860
A4870
POWER OUTLET
A4890
A4900
DATA SYSTEM
A4920
A4930
CCTV SYSTEM & FIRE ALARM
A4950
A4960
SERVANT CALL SYSTEM
A4980
A4990
FINISHING WORKS
GROUND FLOOR
ZONE
STRUCTURAL WORKS
A7070
MECHANICAL WORKS
FIRE FIGHTING
PLUMBING WORKS
DRAINAGE SYSTEM
A6970
WATER SUPPLY SYSTEM
A6980
HVAC WORKS
SWIMMING POOL FITTINGS
A7060
ELECTRICAL WORKS
LIGHTING SYSTEM
KNX SYSTEM
POWER OUTLET
DATA SYSTEM
CCTV SYSTEM & FIRE ALARM
SERVANT CALL SYSTEM
FINISHING WORKS
A7080
WET AREA
MEZZANINE
ZONE
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
WATER SUPPLY SYSTEM
A6170
HVAC WORKS
ELECTRICAL WORKS
LIGHTING SYSTEM
KNX SYSTEM
POWER OUTLET
DATA SYSTEM
CCTV SYSTEM & FIRE ALARM
SERVANT CALL SYSTEM
FINISHING WORKS
A6260
WET AREA
A6340
A6350
A6360
ROOF
ZONE
ROOFING SYSTEM
MECHANICAL WORKS
PLUMBING WORKS
WATER SUPPLY SYSTEM
A8750
A8800
HVAC WORKS
ELECTRICAL WORKS
LIGHTING SYSTEM
POWER OUTLET
CCTV SYSTEM & FIRE ALARM
FINISHING WORKS
A8840
A8850
STUDIO BUILDING
GROUND FLOOR
ZONE
MECHANICAL WORKS
PLUMBING WORKS
DRAINAGE SYSTEM
A7820
A7890
WATER SUPPLY SYSTEM
ELECTRICAL WORKS
LIGHTING SYSTEM
KNX SYSTEM
POWER OUTLET
DATA SYSTEM
CCTV SYSTEM & FIRE ALARM
SERVANT CALL SYSTEM
FINISHING WORKS
A7940
A7960
WET AREA
A7990
ROOF FLOOR
ZONE
A8030
PROGRESS REPORT

ACTIVITY NAME

APPROVAL

Sub Contractor - Document Preparation & Submission


Sub Contractor - Engineer's Review & Approval

Waterproofing Subcon.- Document Preparation & Submission


Waterproofing Subcon.- Engineer's Review & Approval

Gypsum Ceiling works- Documents, preparation and Submission


Gypsum ceiling works - Engineers Review & Approval
oll up shutters
Subcon.- Document Preparation & Submission
Subcon.- Engineer's Review & Approval

Wood works - Document , Preparation and Submission


am Room
Swimming pool, Sauna- Document preparation and Submission

Door Subcon.- Document Preparation & Submission


Door Subcon.- Engineer's Review & Approval

Masonry Material - Document Preparation & Submission


Masonry Material - Engineer's Review & Approval

Marble Tiling Work Material - Document Preparation & Submission


Marble Tiling Work Material - Engineer's Review & Approval

Painting Material - Document Preparation & Submission


Painting Material - Engineer's Review & Approval
accessories
Sanitary fixtures Material - Document Preparation & Submission

Carpet Material - Document Preparation & Submission


Carpet Material - Engineer's Review & Approval

& Low Current Cables


Material - Document Preparation & Submission
Material - Engineer's Review & Approval

Pumps Material - Document Preparation & Submission


Pumps Material - Engineer's Review & Approval

Fan Material - Document Preparation & Submission


Fan Material - Engineer's Review & Approval

Package Unit material - Document Preparation & Submission


Package Unit Material - Engineer's Review & Approval

Panel board Material - Document Preparation & Submission


Panel board Material - Engineer's Review & Approval

Shower Chiller Material - Document Prep & Submission


Shower Chiller - Engineer's Review & Approval

Humidifier Material - Document Prep & Submission


Humidifier - Engineer's Review & Approval

Elevator - Document Prep & Submission


Elevator - Engineer's Review & Approval

Material - Document Preparation & Submission


Material - Engineer's Review & Approval

Material - Document Preparation & Submission


Material - Engineer's Review & Approval

Material - Document Preparation & Submission


Material - Engineer's Review & Approval

Lighting Fixtures - Document Preparation & Submission


Lighting Fixtures - Engineer's Review & Approval

al Order and Delivery)

Block Order
Block Manufacturing & 1st Delivery
l-up Shutters
Material Order
Material Manufacturing & 1st Delivery

Door Order
Door Manufacturing & 1st Delivery
Marble Tile Order
Marble Tile Manufacturing & 1st Delivery

Paint Order
Paint Manufacturing & 1st Delivery
accessories

Carpet Order
Carpet Manufacturing & 1st Delivery

& Low Current Cables


Cables / Power, Grounding & Low Current Cables Order
Manufacturing & 1st Delivery

Pumps Order
Pumps Manufacturing & 1st Delivery

Fan Order
Fan Manufacturing & 1st Delivery

Package Unit Order


Package unit Manufacturing & 1st Delivery

Shower Chiller Order


Shower Chiller Manufacturing & 1st Delivery

Humidifier Order
Humidifier Manufacturing & 1st Delivery

Elevator Order
Elevator Manufacturing & 1st Delivery

Panel board Order


Panel board Manufacturing & 1st Delivery

Wiring devices Order


Wiring devices Manufacturing & 1st Delivery

Lighting control system Order


Lighting control system Manufacturing & 1st Delivery

Fire Alarm System Order


Fire Alarm System Manufacturing & 1st Delivery

Lighting Fixtures Order


Lighting Fixtures Manufacturing & 1st Delivery
Construction of I-beam for the Elevator opening

Removal and installation of new pipes

Installation of pipes

Installation of Plenium box & Flexible duct

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

Block works
Plaster works

Removal and Installation of Drainage pipes


Conduct pressure test
Installation of pipes

Installation of Duct

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

Block works

Column strengthening and removal

Removal and Installation of Drainage pipes

Installation of pipes

First fix
Second fix

First fix
Second fix

First fix
Second fix
First fix
Second fix

First fix
Second fix

First fix

Block works

Waterproofing works
Wall & Floor tiles
Plastering in wet area

Removal and Installation of Drainage pipes

Installation of pipes

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix

Block works

Wall & Floor tiles


Plastering in wet area
Removal and Installation of Drainage pipes

Installation of pipes
Sanitary fixtures

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix

Ceiling works

Wall & Floor tiles


Plastering in wet area

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

Block works

Inverted Beam ( reinf., formwork, conc.)


Sky Lights - Closing of Slab Openings (Reinf.,formwork,conc.)

Installation of pipes
Conduct pressure test

Block works
Plaster works

Removal and Installation of pipes

Installation of Duct
First fix
Second fix

First fix

First fix

First fix

First fix

First fix

Block works
Plaster works

Waterproofing works

Installation of new waterproofing system

Installation of pipes

First fix
Second fix

First fix
Second fix
First fix
Second fix

First fix
Second fix

First fix
Second fix

First fix
Second fix

Swimming pool extension

Removal and Installation of new pipes

Installation of pipes

Installation of Elevator

Block works

Sanitary fixtures
Block works

Waterproofing works
Wall & Floor tiles
Plastering in wet area

Installation of pipes
Conduct pressure test

Paint 1st coat


Paint final coat

Installation of pipes
Conduct pressure test

Paint 1st coat


Ceiling repair works

Waterproofing works
Installation of new waterproofing system
AUGUST 1 - OCTOBER 25

COMPLETED % TO DATE Notes