Leighton Contractors Indonesia

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : BU3/ID205/Wahana Coal Mine Project
Names Dept - Position Sign Off
Date : 25-Jul-12

Team Leader : Team Members :


Reference Number :
Facilitator : :

Process/Activity : Team Members :


Using hand tools

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Required
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

Using Hand Tools Helper Crew, Electric shock, tool slip / Permanent disability, Long 3 2 6 ENG/S 1 3 3 EL/SUB
Mechanic Crew, wear using wrong tool for term absence due to EG 1. TAKE 5 & Daily pre start briefing
Foreman, task treatment for clear instruction
Supervisor

ADM 2. Quarterly inspection & tag for


electric portable tools ENG/S
EG

BHV 3. Quartely Inspection air pressure


tools portable ADM

PPE 4. Tool Inspection by


mechanic/supervisor BHV

5. Mechanical Training & re-fresh


schedule for mechanic PPE

6. Only use hand tools as per OEM


guidelines

7. Always wear the correct PPE with


the specific hand tool if required

8.Clean hand tools prior to use , not


slippery

Uncontrolled Document When Printed 1 of 4 LCI-HSE-FM-001A(02)

Feb 2010
Using Hand Tools Helper Crew, Electric shock, tool slip / Permanent disability, Long 3 2 6 1 3 3
Mechanic Crew, wear using wrong tool for term absence due to
PT. Leighton Contractors Indonesia
Foreman, task treatment
Supervisor
RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : BU3/ID205/Wahana Coal Mine Project
Names Dept - Position Sign Off
Date : 25-Jul-12

Team Leader : Team Members :


Reference Number :
Facilitator : :

Process/Activity : Team Members :


Using hand tools

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Required
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

9. Inspect handtool before use for :


- Crack handles
- Broken handles
- Crack housing
- Mushroom head on punches,
chisels and hammers
- Damage electrical cords and
pneumatic pipes
- Oil leak in hydraulic equipment
- Worn tools
- Use the corrrect tools for the
correct size & nuts/bolts
- Always work away from body
- Do not use screwdriver or knife
while it is being help in hand
- Using knife always cut away from
hand/body
- Close/protect all sharp poits after
use
- Do not tran any tools around hard
it over proper manuver
- Hang/place tools back onto
toolbox after use

Uncontrolled Document When Printed 2 of 4 LCI-HSE-FM-001A(02)

Feb 2010
Team

Names Dept. - Position Sign Off

ols Required By whom By When Status Legal and Other Requirements Reference

Uncontrolled Document When Printed 3 of 4 LCI-HSE-FM-001A(02)

Feb 2010
Team

Names Dept. - Position Sign Off

ols Required By whom By When Status Legal and Other Requirements Reference

Uncontrolled Document When Printed 4 of 4 LCI-HSE-FM-001A(02)