Freeman Industries, Inc. www.freemanindustriesinc.com (440) 858-2600 adam.freeman@freemanindustriesinc.com CP System Components Rectifier Automatic potentially controlled circuit Single or multiple circuits Anode Material and configuration of anode system Control Cell Cu/CuSO4 DC Wiring Anode and structure ground feeds and Control wires Rectifier Most modern CP systems in water towers use automatic potentially controlled rectifiers
Various capacities available
Some water towers require multiple circuits
Independent circuits for bowl and riser Anode Material Platinum-niobium wire on polyester rope Long lifetime Lightweight Mixed metal oxide Titanium substrate Niobium substrate Anode Configuration Vertical systems Anodes hung from the roof of the tank
Submerged system Anodes and wiring under water line
Ice resistant systems
No anchors on outer wall of tank Control Cell Cu/CuSO4 cell Desirable to have a cell accessible No bridging between membrane and structure Long life cell where not accessible DC Wiring Pressure entrance fitting Submerged systems
Conduit to top of tank
Vertical systems Choosing the Anode Configuration Is ice a factor?
Can the tank be drained to install the CP system
Vertical CP System Hand Hole Detail Rectifier Inside Rectifier Anode Anode Reference Cell Anodes on Tank Old Anodes Tank Roof Reference Cell Insulator Rectifier Ground Hand Hole Anode Feed Wires Anode Insulator Vertical Anodes Vertical Anode System Inside tank Hand hole and connections Cell and fill pipe View of middle ring anode
Note the radial wiring
Single anode in outer ring Inner ring anodes Submerged 2 Circuit Anode System View of tank Float attached to anode support rope Feed wire connection to anode Bowl reference cell Strain relief for feed wires Riser anode and feed wires Riser grate Bowl anode Riser Rectifier cabinet Stainless steel pressure entrance fitting AC and DC wiring Pressure entrance fitting View looking up the riser Strain relief for feed wires Inside view of pressure entrance fitting and reference cell Fill pipe, pressure entrance fitting, and reference cell Ice Resistant System Ice Resistant System Ice Resistant System Ice Resistant System Ice Resistant System Riser Anode Clevis Bowl anode Riser Cell Riser Anode and Feed Wires Anode Tie down Clevis Bowl Anodes from Top Riser Anode Riser Anode Submerged CP System Rectifier and Pressure Entrance Fitting Solid State Rectifier module and feed wires Anode Anode Control Cells Control Cells CP System Anode support arm View from top Reference Cell DC Junction Box and PE Anode support arm Anode Anode Reference Cell Support Arm Reference Cell Tie Down View from Top View from Top Filling Tank Filling Tank Filling Tank CP System Anode Anode Anode Anode and Cell Anode Anode and Cell Anode Flocculator Anodes Flocculator Anode Flocculator Anode Anode Tie-off Grounding Wires Current Collector Current Collector Cell Tubes Anode Feed Clarifier Basin Clarifier Basin Clarifier Anode Clarifier Anode Clarifier Anode Clarifier Anode 2 – 27 pound Galvotec GA-TZB-27 Bolt-On Hi-Purity Zinc Anodes to supplement ICCP on mechanical rake arm extensions. One each stud mounted on top rail at each of two locations shown on photo. Two additional anodes mounted in same locations on opposite end of sweep. Grounding of moving arms to main frame to be provided by Bowen. Bolted connections to be epoxy coated after nuts and star lock washers have been fully tightened. Zn Anodes on Extension Arm Current Collector Launder Basin Launder Anodes Launder Anodes Uncoated Stainless Steel Inside a Water Tank Digitally Controlled Rectifier