Vous êtes sur la page 1sur 49

Tab3.

1 Population database and risk to SURGE by barangay and by suscepti 10,855 37,614
Barangay HAZARD EXPOSURE
Surge Likelihood Expected Barangay Affected Affected
Susceptibility of Depth Population HH Populatio
/ Magnitude Occurrence n
Score

Low, Mod, High Thru ≤1m for Low Total From from
Anecdotal 1.0m-2.0m Population ClimEx.db/ Climex.db/
Account moderate & of the brgy CBMS, CBMS
(Score range ≥ 2m for high correspond correspond
1-6) s to the No. s to the
See Annex J of HH Family
3 Brgy. 65 Surge-High 6 above 2m Heads101 Members 428
5 Brgy. 66 Surge-High 6 above 2m 217 968
8 Brgy. 66A Surge-High 6 above 2m 181 817
11 Brgy. 67 Surge-High 6 above 2m 168 746
14 Brgy. 68 Surge-High 6 above 2m 209 885
17 Brgy. 69 Surge-High 6 above 2m 210 922
19 Brgy. 70 Surge-High 6 above 2m 174 656
25 Brgy. 72 Surge-High 6 above 2m 134 372
31 Brgy. 5A Surge-High 6 above 2m 301 107 301
32 Brgy. 6A Surge-High 6 above 2m 1139 224 997
35 Brgy. 1 Surge-High 6 above 2m 396 440
38 Brgy. 2 Surge-High 6 above 2m 151 213
39 Brgy. 5 Surge-High 6 above 2m 265 118 265
41 Brgy. 6 Surge-High 6 above 2m 361 628
42 Brgy. 8 Surge-High 6 above 2m 239 70 239
43 Brgy. 8A Surge-High 6 above 2m 177 29 147
44 Brgy. 13 Surge-High 6 above 2m 43 18 37
45 Brgy. 14 Surge-High 6 above 2m 242 60 211
48 Brgy. 16 Surge-High 6 above 2m 131 50 131
49 Brgy. 17 Surge-High 6 above 2m 67 74 67
63 Brgy. 83A Surge-High 6 above 2m 334 1517
74 Brgy. 86 Surge-High 6 above 2m 207 906
78 Brgy. 88 Surge-High 6 above 2m 1743 5217
84 Brgy. 58 Surge-High 6 above 2m 190 509
95 Brgy. 60A Surge-High 6 above 2m 555 247 555
96 Brgy. 61 Surge-High 6 above 2m 633 244 633
104 Brgy. 63 Surge-High 6 above 2m 356 1574
108 Brgy. 75 Surge-High 6 above 2m 768 230 768
110 Brgy. 76 Surge-High 6 above 2m 279 619
114 Brgy. 43 Surge-High 6 above 2m 55 211
127 Brgy. 46 Surge- Med 4 1-2m 70 294
129 Brgy. 47 Surge- Med 4 1-2m 120 384
131 Brgy. 48 Surge- Med 4 1-2m 80 348
135 Brgy. 48B Surge-High 6 above 2m 139 419
140 Brgy. 18 Surge- Med 4 1-2m 185 44 174
151 Brgy. 28 Surge- Med 4 1-2m 197 50 197
152 Brgy. 29 Surge- Med 4 1-2m 49 48 49
156 Brgy. 31 Surge-High 6 above 2m 92 215
161 Brgy. 35A Surge-High 6 above 2m 412 103 412
192 Brgy. 19 Surge-High 6 above 2m 179 62 179
194 Brgy. 20 Surge-High 6 above 2m 80 271
197 Brgy. 23 Surge- Med 4 1-2m 259 90 236
204 Brgy. 36 Surge-High 6 above 2m 1411 161 683
205 Brgy. 37 Surge-High 6 above 2m 2716 490 2205
207 Brgy. 38 Surge-High 6 above 2m 68 242
209 Brgy. 39 Surge-High 6 above 2m 451 2030
214 Brgy. 42 Surge-High 6 above 2m 91 402
216 Brgy. 42A Surge-High 6 above 2m 125 547
234 Brgy. 94 Surge-High 6 above 2m 422 1815
241 Brgy. 99 Surge-High 6 above 2m 727 3127
260 Brgy. 54 Surge-High 6 above 2m 153 411
261 Brgy. 54A Surge-High 6 above 2m 657 150 657
268 Brgy. 56A Surge-High 6 above 2m 338 102 338
4,287 22.34 9.75 27.65 1.18 46.93 1.16
URE VULNERABILTY
Exposure Percentage Percentage Percentage Percentage Percentage Percentage
Percentag of Informal living in of young of persons below the Malnourishe
e Settlers (IS) dwelling units and old with Poverty d Individuals
made from dependents disabilities Threshold
light materials
or
salvageable
materials
Affected Out of the of of the out of the out of the out of the out of the
Pop'n affected HH: affected HH: affected affected affected HH: No. affected
divided by No. of HH No. of HH Living Population: Population: No. of HH below Population:
Total Pop;n accounted as in No. of Pop'n 0- of disabled poverty threshold No. of
of the IS divided makeshift/salvag 5 & 65 yrs old persons divided or in poor malnourished
barangay affected HH eable materials and above total affected condition(fr individuals
multiply
35.64
by multiply98.02
by divide affected
23.18 divided total
33.10 Pop'n multiply
0.68 CBMS)divide 100.85 divided total
0.27
10071.23 100100.00 HH multiply by affected Pop'n
24.09 23.43 by 100 0.55 affected HH
71.03 affected Pop'n
0.18
70.25 100.00 100 18.45 multiply21.04by 0.70 multiply by 100
65.26 multiply by 100
-
100
55.88 100.00 65.11 30.56 1.34 86.48 0.11
44.97 100.00 41.05 29.09 2.05 89.12 0.32
40.21 100.00 28.32 32.91 0.67 94.39 0.52
63.75 100.00 39.19 21.25 1.15 44.41 0.12
79.83 5.22 1.79 14.82 0.86 18.48 -
100.00 5.61 7.48 16.61 0.33 28.97 -
87.53 72.77 8.93 19.86 2.01 51.34 0.20
71.43 12.37 2.52 19.80 0.32 12.80 -
67.19 15.23 3.56 18.61 0.32 12.46 -
100.00 16.95 3.39 16.23 0.75 16.95 -
84.07 17.45 5.12 15.52 1.34 15.60 -
100.00 4.29 2.86 13.39 0.84 60.00 -
83.05 - - 15.35 0.61 43.57 -
86.05 100.00 - 10.81 - 27.78 -
87.19 8.33 1.62 15.63 1.84 54.96 -
100.00 - - 14.50 0.76 14.00 -
100.00 - - 20.90 - 10.09 -
89.29 18.26 21.22 18.39 1.76 47.68 0.18
80.25 1.93 6.59 16.12 0.97 37.61 -
86.35 7.97 6.98 18.32 0.25 16.59 0.12
79.53 16.84 12.99 19.87 1.10 20.54 0.16
100.00 12.55 6.86 15.98 0.90 20.97 0.36
100.00 37.30 24.59 18.01 0.47 30.33 0.79
72.00 12.36 12.44 20.69 1.20 35.95 0.16
100.00 25.22 5.13 17.92 0.90 27.35 0.26
75.49 3.23 2.70 14.99 1.71 20.28 0.37
57.97 41.82 9.21 16.13 0.69 43.44 -
94.84 - - 16.10 3.86 33.81 0.32
95.29 5.83 7.95 20.37 0.99 29.41 -
89.92 - 10.13 18.89 0.78 38.27 -
95.23 17.99 23.29 18.18 1.36 40.42 -
94.05 6.82 - 18.97 0.57 29.55 -
100.00 - - 17.77 1.02 44.00 1.02
100.00 - - 14.29 2.04 10.42 -
90.34 40.22 12.74 20.13 0.84 40.19 -
100.00 51.46 - 15.15 0.48 11.55 -
100.00 - - 17.88 0.56 32.26 -
79.24 10.00 3.96 15.50 0.88 41.61 -
91.12 - - 16.21 - 37.44 -
48.41 88.82 21.74 41.87 2.78 100.00 0.29
81.19 89.59 26.48 24.76 0.68 94.51 0.18
87.36 44.12 12.51 17.96 0.39 61.15 -
72.22 100.00 19.42 24.59 0.98 72.07 0.04
55.30 36.26 16.53 23.48 1.66 67.94 -
40.64 100.00 25.31 37.52 0.59 91.49 -
67.42 3.25 1.18 27.16 1.32 67.29 0.01
61.00 42.09 0.55 18.31 0.78 71.93 0.21
73.92 24.18 10.14 19.06 0.90 29.46 -
100.00 38.00 15.33 17.96 1.07 42.00 0.30
100.00 52.94 14.71 10.65 0.89 40.20 0.30
RISK ADAPTIVE CAPACITY
Severity Risk Score Risk Category Access to PhilHealt Househol
of post h d
Conseque disaster Coverag financial
nce financing e capacities
Score_Av to
erage relocate
or retrofit
average SCORE Severity of
sensitivity Consequence
multiply
to likelihood
of
Occurrence
42.68 2 See Annex 12 K High Risk Area 50 50 25
36.55 3 18 High Risk Area 50 50 25
34.24 3 18 High Risk Area 50 50 25
47.27 3 18 High Risk Area 50 50 25
43.60 2 12 High Risk Area 50 50 25
42.80 2 12 High Risk Area 50 50 25
34.35 3 18 High Risk Area 50 50 25
6.86 2 12 High Risk Area 50 50 50
9.83 3 18 High Risk Area 50 50 50
25.85 3 18 High Risk Area 50 50 50
7.97 2 12 High Risk Area 50 50 50
8.36 2 12 High Risk Area 50 50 50
9.04 3 18 High Risk Area 50 50 50
9.17 2 12 High Risk Area 50 50 50
13.56 3 18 High Risk Area 50 50 50
9.92 2 12 High Risk Area 50 50 50
23.10 3 18 High Risk Area 50 50 50
13.73 3 18 High Risk Area 50 50 50
4.88 3 18 High Risk Area 50 50 50
5.17 3 18 High Risk Area 50 50 50
17.92 3 18 High Risk Area 50 50 50
10.54 2 12 High Risk Area 50 50 50
8.37 2 12 High Risk Area 50 50 50
11.92 2 12 High Risk Area 50 50 25
9.60 3 18 High Risk Area 50 50 25
18.58 3 18 High Risk Area 50 50 25
13.80 2 12 High Risk Area 50 50 50
12.79 3 18 High Risk Area 50 50 50
7.21 2 12 High Risk Area 50 50 50
18.55 2 12 High Risk Area 50 50 50
9.01 3 12 High Risk Area 50 50 50
10.76 3 12 High Risk Area 50 50 50
11.34 3 12 High Risk Area 50 50 50
16.87 3 18 High Risk Area 50 50 25
9.32 3 12 High Risk Area 50 50 50
10.63 3 12 High Risk Area 50 50 50
4.46 3 12 High Risk Area 50 50 50
19.02 3 18 High Risk Area 50 50 25
13.11 3 18 High Risk Area 50 50 25
8.45 3 18 High Risk Area 50 50 50
11.99 2 12 High Risk Area 50 50 50
8.94 3 12 High Risk Area 50 50 50
42.58 2 12 High Risk Area 50 50 25
39.37 4 24 High Risk Area 50 50 25
22.69 3 18 High Risk Area 50 50 50
36.18 3 18 High Risk Area 50 50 50
24.31 2 12 High Risk Area 50 50 50
42.48 2 12 High Risk Area 50 50 50
16.70 2 12 High Risk Area 50 50 50
22.31 2 12 High Risk Area 50 50 50
13.96 2 12 High Risk Area 50 50 25
19.11 3 18 High Risk Area 50 50 25
19.95 3 18 High Risk Area 50 50 25
ADAPTIVE CAPACITY
Governme Governme average
nt nt adaptive
Capacity Resources capacity
to
generate
jobs

50 50 45.00
50 50 45.00
50 50 45.00
50 50 45.00
50 50 45.00
50 50 45.00
50 50 45.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 45.00
50 50 45.00
50 50 45.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 45.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 45.00
50 50 45.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 45.00
50 50 45.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 50.00
50 50 45.00
50 50 45.00
50 50 45.00
Tab3.2.3 Urban database and risk to SURGE by barangay and by susceptibility

Barangay Identification HAZARD

Land Use Category Surge Susceptibility/ Likelihood of


Magnitude Occurrence
Score
Commercial, Residential, Low, Moderate, High See Annex J
Industrial, Tourism
6 1 Commercial High 6
9 1 Industrial High 6
18 2 Commercial High 6
21 2 Institutional High 6
24 3 Residential Moderate 4
25 3 Residential High 6
37 3 Institutional High 6
39 4 Residential Moderate 4
43 4 Commercial High 6
48 4 Socialized Housing Moderate 4
52 5 Commercial Moderate 4
53 5 Commercial High 6
58 6 Commercial Moderate 4
61 6 Institutional Moderate 4
80 8 Commercial High 6
85 9 Residential High 6
99 10 Commercial Moderate 4
102 10 Institutional Moderate 4
EXPOSURE

Expected Total Affected Replacement Affected Value %


Depth Barangay Area Cost per (PHP) Exposure
Allocation (Hectares) Sq.Meter H X G X 10000 H/F
in (GIS (PHP)
0--1m for low 1- Total land
Hectares Derived)
2 mod; 2 above area
2m
high& above 12.27
allocated 13.46 134,600 73.67
2m & above 5.43
by urban 14.19 141,900 100.00
land use
2m & above 23.97
category 25.04 250,400 83.63
2m & above 17.17 16.37 163,700 59.31
1-2m 80.39 120.83 1,208,300 56.28
2m & above 127.92 192.26 1,922,600 89.54
2m & above 22.49 21.76 217,600 62.31
1-2m 57.37 31.08 310,800 43.69
2m & above 13.60 16.25 162,500 50.37
1-2m 7.13 8.48 84,800 90.89
1-2m 8.81 12.01 120,100 97.01
2m & above 2.98 4.06 40,600 32.79
1-2m 7.63 8.53 85,300 82.18
1-2m 0.54 0.89 8,900 100.00
2m & above 11.51 14.44 144,400 86.78
2m & above 232.84 33.11 331,100 6.88
1-2m 14.16 14.06 140,600 59.00
1-2m 4.03 5.74 57,400 100.00
650.25 552.56 - 5,525,600 1,274.34
VULNERABILITY

Proportion of building walls Proportion Structure not Structures AVERAGE Severity of


with light to salvageable of employing with no SENSITIVITY Consequen
materials buildings in hazard resistant access/area ce
dilapidated building design coverage to
if poor or fair ≤5% of
/condemen Yes or No ≤5% of
infrastructur Score_Scor
SCORE
≤5% of Structure Structure
ed of StrucNo Structure
e related of S e
≤5% of Structure
>5 to10% of Structure ≤5%
>5 to10%
>10-20%
>5 to10% of 56.25 3
Condition mitigation
>10-20% of Structure
≤5% of Structure ≤5% of StrucNo
of Structure Structure of S
>10-20%
measures 56.25 3
≥20% of structure >10-20% of No >10-20% of
≤5% of Structure ≤5% of Struc >10-20%
Structure of S 56.25 3
Structure No ≥20% of of
≤5% of Structure ≤5% of Struc
≥20% of >10-20% S 56.25 2
structure
>10-20% of Structure >10-20%
structure of No >10-20% of S 81.25 4
>10-20% of Structure >10-20% of No >10-20% of S 81.25 4
≤5% of Structure ≤5% of StrucNo >10-20% of S 56.25 2
>10-20% of Structure >10-20% of No >10-20% of S 81.25 3
≤5% of Structure ≤5% of StrucNo >10-20% of S 56.25 2
≤5% of Structure ≤5% of StrucNo >10-20% of S 56.25 4
≤5% of Structure ≤5% of StrucNo >10-20% of S 56.25 4
≤5% of Structure ≤5% of StrucNo >10-20% of S 56.25 1
≤5% of Structure ≤5% of StrucNo >10-20% of S 56.25 3
≤5% of Structure ≤5% of StrucNo >10-20% of S 56.25 4
≤5% of Structure ≤5% of StrucNo >10-20% of S 56.25 3
>10-20% of Structure >10-20% of No >10-20% of S 81.25 2
≤5% of Structure ≤5% of StrucNo >10-20% of S 56.25 2
≤5% of Structure ≤5% of StrucNo >10-20% of S 56.25 4
RISK ADAPTIVE CAPACITY

Risk Risk Insurance Available Capacity to


Score Category Coverage Alternative relocate or Governmen
Sites retrofit t Resources
structures for
See Annex K Programs
18 High Risk 75.00 75.00 and 75.00
Projects
18 High Risk 75.00 75.00 related75.00
to
18 High Risk 75.00 75.00 Risk 75.00
12 High Risk 25.00 100.00 Reduction
75.00
16 High Risk 25.00 25.00 75.00
24 High Risk 25.00 25.00 75.00
12 High Risk 25.00 100.00 75.00
12 High Risk 25.00 25.00 75.00
12 High Risk 75.00 75.00 75.00
16 High Risk 75.00 25.00 75.00
16 High Risk 75.00 75.00 75.00
6 High Risk 75.00 75.00 75.00
12 High Risk 75.00 75.00 75.00
16 High Risk 25.00 100.00 75.00
18 High Risk 75.00 75.00 75.00
12 High Risk 25.00 25.00 75.00
8 High Risk 75.00 75.00 75.00
16 High Risk 25.00 100.00 75.00
Capacities of
Property Owners ADOPTIV
to conform with E
Risk Mitigation CAPACITY
related Zoning AVERAGE
Regulations75.00 75.00
100.00 81.25
75.00 75.00
100.00 75.00
75.00 50.00
75.00 50.00
100.00 75.00
75.00 50.00
75.00 75.00
100.00 68.75
75.00 75.00
75.00 75.00
75.00 75.00
100.00 75.00
75.00 75.00
75.00 50.00
75.00 75.00
100.00 75.00
Tab3.4.3 Critical point facilities database and risk to surge by barangay and by susceptibility

Identification HAZARD

Barangay Name of Facility Susceptibility Likelihood


/ Magnitude of
Occurrence
Score

(High, See Annex J


moderate,Lo
w)

1 Brgy. 65 Basketball Court @ 65 moderate 4


2 Brgy. 66 DCC - Paseo (Sabang/Anibong) high 6
3 Brgy. 66A Brgy. Hall @ 66A high 6
4 Brgy. 66A Basketball Court @ 66A high 6
5 Brgy. 66A DCC - Paseo de Legaspi high 6
6 Brgy. 66A La Villa Antonia high 6
7 Brgy. 66A Buddhist Temple high 6
8 Brgy. 67 Brgy. Hall @ 67 high 6
9 Brgy. 67 Basketball Court @ 67 high 6
10 Brgy. 68 Basketball Court @ 68 high 6
11 Brgy. 68 Brgy. Hall @ 68 high 6
12 Brgy. 69 Brgy. Hall @ 69 high 6
13 Brgy. 69 DCC - Anibong high 6
14 Brgy. 70 Basketball Court @ 70 high 6
15 Brgy. 70 DCC - Anibong Central School high 6
16 Brgy. 71 Basketball Court @ 71 high 6
17 Brgy. 71 Brgy. Hall @ 71 high 6
18 Brgy. 71 DCC - Naga - naga high 6
19 Brgy. 71 Jcp Pensionne high 6
20 Brgy. 71 Holy Child Polytechnic College Of Leyte, Inc. high 6
21 Brgy. 71 JE Mondejar Computer College high 6
22 Brgy. 71 Perpetual Help Learning Center high 6
23 Brgy. 72 Leyte Technology Foundation high 6
24 Brgy. 72 Estrella Hotel moderate 4
25 Brgy. 72 Antonio Vargas Salmo School Foundation Inc. moderate 4
28 Brgy. 51A Casa Real Inn moderate 4
29 Brgy. 51A Spach Residence moderate 4
30 Brgy. 53 Redemptorist moderate 4
31 Brgy. 54 Shalom Hotel moderate 4
32 Brgy. 54A Health Center - Sagkahan high 6
33 Brgy. 56 DCC - Pericohon moderate 4
34 Brgy. 56 Brgy. Hall @ 56 moderate 4
35 Brgy. 1 CUSTOMS high 6
36 Brgy. 1 DFA high 6
37 Brgy. 1 DOLE high 6
38 Brgy. 1 DSWD Region high 6
39 Brgy. 1 MARINA high 6
40 Brgy. 1 MARITIME POLICE high 6
41 Brgy. 1 NICA high 6
42 Brgy. 1 NLRC high 6
43 Brgy. 1 OWWA high 6
44 Brgy. 1 PPA high 6
45 Brgy. 1 PRC high 6
46 Brgy. 1 EVRMC Hospital high 6
47 Brgy. 1 Leyte Park Hotel high 6
48 Brgy. 2 DCC - Jones Ext. (U.P. Site) high 6
49 Brgy. 2 NTC high 6
50 Brgy. 2 POST OFFICE high 6
51 Brgy. 2 TELECOM high 6
52 Brgy. 6 Sacred Heart Church high 6
53 Brgy. 6 Sto. Nino SPED Center high 6
54 Brgy. 6 Sacred Heart College high 6
55 Brgy. 6A Your Home Pensione high 6
56 Brgy. 6A Cirilo Roy Montejo High School high 6
58 Brgy. 8A DSWD Province high 6
59 Brgy. 8A NBI high 6
60 Brgy. 14 Brgy. Hall @ 14 high 6
61 Brgy. 14 Dons Cabin Pension House high 6
62 Brgy. 15 Eco Lodge moderate 4
63 Brgy. 15 Mathew Lodging House moderate 4
64 Brgy. 15 Tac. Plaza Hotel moderate 4
65 Brgy. 15 Kelstone College Foundation Inc. moderate 4
66 Brgy. 16 La Rica Hotel high 6
67 Brgy. 16 Primerose Hotel high 6
68 Brgy. 17 Asia Stars Hotel high 6
69 Brgy. 17 La Viajera Bed & Bath high 6
70 Brgy. 17 Datamex Institute of Computer Technology high 6
75 Brgy. 81 Es Park Inn moderate 4
76 Brgy. 83 DCC - Paraiso, San Jose high 6
77 Brgy. 83A Brgy. Hall @ 83-A high 6
78 Brgy. 83A DCC - Burayan, San Jose high 6
79 Brgy. 83A Angela Pension House high 6
80 Brgy. 83A Our Lady of Fatima Parish high 6
81 Brgy. 83A Holy Virgin of Salvacion School, Inc. high 6
82 Brgy. 83B DCC - Cogon/Lolita San Jose high 6
83 Brgy. 83B Our Lady of Salvacion Church high 6
84 Brgy. 83C Brgy. Hall @ 83-C high 6
85 Brgy. 83C DCC - Taguictik high 6
86 Brgy. 84 DCC - RJD moderate 4
87 Brgy. 84 Allondra Hotel moderate 4
88 Brgy. 84 Arc Angelus Civitas School moderate 4
89 Brgy. 85 DCC - San Jose Proper high 6
90 Brgy. 85 Health Center - San Jose high 6
91 Brgy. 86 Basketball Court @ 86 high 6
92 Brgy. 86 St. Joseph Parish high 6
93 Brgy. 87 DCC - Manlurip, San Jose high 6
94 Brgy. 87 Ais Hotel - Manlurip high 6
95 Brgy. 87 Iglesia ni Cristo high 6
96 Brgy. 87 Manlurip Mission Station high 6
97 Brgy. 87 San Jose National High School high 6
98 Brgy. 88 Brgy. Hall @ 88 high 6
99 Brgy. 88 CAAP high 6
100 Brgy. 88 NAPOLCOM high 6
101 Brgy. 88 Ceilo Vista high 6
102 Brgy. 88 Leyte Colleges, Inc. - San Jose high 6
103 Brgy. 88 Daniel Romualdez Airport high 6
104 Brgy. 89 DCC - San Jose high 6
105 Brgy. 59 Brgy. Hall @ 59 moderate 4
106 Brgy. 59 DCC - Picas moderate 4
107 Brgy. 59 Villa Amor moderate 4
108 Brgy. 59 Tac. Angelicum Learning Center, Inc. moderate 4
109 Brgy. 59A Basketball Court @ 59A moderate 4
110 Brgy. 59A DCC - Sampaguita moderate 4
111 Brgy. 60A DCC - Old Road (Fish Shed) high 6
112 Brgy. 60A Tac. City Adventist Elementary School high 6
113 Brgy. 61 Edgeworth Review & Educational Center high 6
114 Brgy. 62 DCC - Sagkahan moderate 4
115 Brgy. 62 ASTRODOME moderate 4
116 Brgy. 62A DCC - Sagkahan moderate 4
117 Brgy. 62B DCC - Molave moderate 4
118 Brgy. 62B St. Rafael the Archangel Parish moderate 4
119 Brgy. 63 DCC - Mangga Sagkahan high 6
120 Brgy. 63 NHA high 6
121 Brgy. 63 Basic Rooms Hotel high 6
122 Brgy. 63 Colegio De La Salle Fondation de Tac. Inc. high 6
123 Brgy. 64 Basketball Court @ 64 moderate 4
124 Brgy. 64 DCC - Sagkahan (B L I S S) moderate 4
125 Brgy. 64 Sagkahan National High School moderate 4
126 Brgy. 76 CDA high 6
127 Brgy. 76 DTI - Province high 6
128 Brgy. 76 Ace Francis Hotel high 6
129 Brgy. 32 Cecelia Lodge moderate 4
130 Brgy. 32 Grand Royal Suite moderate 4
131 Brgy. 32 Welcome Home Pensione moderate 4
132 Brgy. 32 Asian Development Foundation College moderate 4
133 Brgy. 33 Highness Pensione moderate 4
134 Brgy. 33 Ironwood Hotel moderate 4
135 Brgy. 33 Villa Lolita Apartelle moderate 4
136 Brgy. 43 Jerucen Pensionne high 6
137 Brgy. 43A DCC - Quarry District moderate 4
138 Brgy. 44 DCC - Quarry high 6
139 Brgy. 44 St. Paul's Hospital high 6
140 Brgy. 45 Liceo del Verbo Divino Chapel high 6
141 Brgy. 45 Liceo Del Verbo Divino high 6
142 Brgy. 46 Consuelo Hotel moderate 4
143 Brgy. 46 Eastern Visayas State University - Secondary Lab. moderate 4
144 Brgy. 46 Leyte National High School moderate 4
145 Brgy. 46 Leyte Normal University - Integrated Lab. School moderate 4
146 Brgy. 46 Leyte Colleges Inc. - Paterno moderate 4
147 Brgy. 47 Gv Hotel moderate 4
148 Brgy. 47 United Church Family Life Program moderate 4
149 Brgy. 48 ACLC College Tac. moderate 4
150 Brgy. 48B Basketball Court @ 48B high 6
151 Brgy. 48B DCC - Magallanes high 6
152 Brgy. 7 DAR moderate 4
153 Brgy. 7 DENR moderate 4
154 Brgy. 7 Xyz Hotel moderate 4
155 Brgy. 7 Ama Computer Learning Center Of Tac. moderate 4
156 Brgy. 18 Brgy. Hall @ 18 moderate 4
157 Brgy. 21 Leos Lodge moderate 4
158 Brgy. 21 Methodist Church moderate 4
159 Brgy. 21A Basketball Court @ 21A moderate 4
160 Brgy. 26 Granda Manor moderate 4
161 Brgy. 26 Hayward Travel Inn moderate 4
162 Brgy. 26 Saint Anthony Sped Center Foundation,Inc. moderate 4
163 Brgy. 27 Santo Nino Church moderate 4
164 Brgy. 27 Rizal Central School moderate 4
165 Brgy. 27 St. Nino Education Center moderate 4
166 Brgy. 28 Alejandro Hotel moderate 4
167 Brgy. 29 Lai Rico Hotel moderate 4
168 Brgy. 29 Lorenzos Way moderate 4
169 Brgy. 30 Xavier Early Academy moderate 4
170 Brgy. 31 Ambasador Hotel high 6
171 Brgy. 31 Jerucel Lodging House high 6
172 Brgy. 34 Rosvenil Hotel moderate 4
173 Brgy. 34 Yellow Doors Hostel moderate 4
174 Brgy. 35 Don Pedro Suites moderate 4
175 Brgy. 77 DCC - Fatima moderate 4
176 Brgy. 77 DBM moderate 4
177 Brgy. 77 GSIS moderate 4
178 Brgy. 77 OMBUDSMAN moderate 4
179 Brgy. 77 SSS moderate 4
180 Brgy. 77 Go Hotel moderate 4
181 Brgy. 77 Church of Latter Day Saints - Fatima moderate 4
182 Brgy. 77 Our Lady of Fatima Parish - Marasbaras moderate 4
183 Brgy. 77 Grace Baptist Academy moderate 4
184 Brgy. 78 Setic Apartelle moderate 4
185 Brgy. 78 The Loft Hotel moderate 4
186 Brgy. 78 Uldings Hotel moderate 4
187 Brgy. 80 Tac. City Hospital moderate 4
188 Brgy. 109A Brgy. Hall @ 109-A moderate 4
189 Brgy. 109A Basketball Court @ 109A moderate 4
190 Brgy. 109A Health Center - V&G moderate 4
191 Brgy. 20 Luxury Suite high 6
192 Brgy. 22 Canelsa Hotel moderate 4
193 Brgy. 22 Travelers Suite moderate 4
194 Brgy. 22 Kapangian Central School moderate 4
195 Brgy. 23 Golden Key Inn moderate 4
196 Brgy. 23 Lorenza Hotel moderate 4
197 Brgy. 23 Church of Latter Day Saints - Burgos moderate 4
198 Brgy. 24 Colegio De La Salle Fondation De Tac., Inc. - Anne moderate 4
199 Brgy. 36 DCC - Sabang high 6
200 Brgy. 37 Basketball Court @ 37 high 6
201 Brgy. 37 DCC - Reclamation Area (Seawall) high 6
202 Brgy. 37 COASTGUARD high 6
203 Brgy. 37 Health Center - MASA high 6
204 Brgy. 37A Basketball Court @ 37A high 6
205 Brgy. 38 Rodolfo Hotel high 6
206 Brgy. 38 Holy Spirit College Foundation In Leyte Inc. high 6
207 Brgy. 40 CHED high 6
208 Brgy. 40 Etsu Hotel high 6
209 Brgy. 40 Leyte Sports Development Center high 6
210 Brgy. 25 DCC - Day Care - Paterno/SP Compound moderate 4
211 Brgy. 25 BALYUAN moderate 4
212 Brgy. 25 BJMP moderate 4
213 Brgy. 25 BOF REG./CITY moderate 4
215 Brgy. 25 LTO moderate 4
216 Brgy. 25 REGISTRY OF DEEDS moderate 4
217 Brgy. 25 RTC - Bulwagan moderate 4
218 Brgy. 25 SANGGUNIAN moderate 4
220 Brgy. 25 Tac. City Youth Hub moderate 4
221 Brgy. 25 Women’s Shelter moderate 4
222 Brgy. 93 Basketball Court @ 93 high 6
223 Brgy. 93 DCC - Bagacay high 6
224 Brgy. 93 Candelaria Mission Station high 6
226 Brgy. 93 Tac. City National High School high 6
227 Brgy. 93 Ley - Sam Baptist Academy, Inc. high 6
228 Brgy. 93 MSH Sister's Academy high 6
229 Brgy. 93 Brgy. Hall @ 93 high 6
230 Brgy. 94 DCC - Tigbao high 6
232 Brgy. 94 St. Joseph Freinademetz School, Inc. high 6
233 Brgy. 94 Brgy. Hall @ 94 high 6
234 Brgy. 99 Basketball Court @ 99 high 6
235 Brgy. 99 DCC - Diit high 6
236 Brgy. 99 BFAR high 6
237 Brgy. 99 Health Center - Diit high 6
239 Brgy. 99 SOS Children’s Village (Private owned) high 6
240 Brgy. 99 Brgy. Hall @ 99 high 6
242 Brgy. 102 Brgy. Hall @ 102 high 6
243 Brgy. 108 DCC - Tagpuro moderate 4
244 Brgy. 108 Social Development Center for Children moderate 4
245 Brgy. 108 Brgy. Hall @ 108 moderate 4
usceptibility

HAZARD EXPOSURE

Expected Storey Estimated Total % of Unit Cost Replacement Cost Existing


Depth Affected Area Affected Condition
Area (sq.m.) Area

≤1m for Low No. of Flr area Flr area Constructi Total Estimated good,
1m-2m Flrs (if any) (if any) Estimated on cost affected area excellent,
moderate & Area of Area of affected per sq.m. multiply by Unit fair, poor
≥ 2m for facility facility area Cost
high compoun compoun divided
d d by Total
Floor
1-2m 1 480 480 area
100.00 10,000 4,800,000 good
multiply
>2m 1 48 48 by100.00
100 10,000 480,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 2 56 56 100.00 10,000 560,000 good
>2m 1 300 300 100.00 10,000 3,000,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 1 36 36 100.00 10,000 360,000 good
>2m 1 300 300 100.00 10,000 3,000,000 good
>2m 2 768 768 100.00 10,000 7,680,000 good
>2m 1 256 256 100.00 10,000 2,560,000 good
>2m 1 300 300 100.00 10,000 3,000,000 good
1-2m 6 96 96 100.00 10,000 960,000 good
1-2m 1 320 320 100.00 10,000 3,200,000 good
1-2m 3 33 33 100.00 10,000 330,000 good
1-2m 2 32 32 100.00 10,000 320,000 good
1-2m 1 2,600 2,600 100.00 10,000 26,000,000 good
1-2m 3 47 47 100.00 10,000 470,000 good
>2m 1 200 200 100.00 10,000 2,000,000 good
1-2m 1 48 48 100.00 10,000 480,000 good
1-2m 1 50 75 66.67 10,000 500000 good
>2m 2 600 600 100.00 10,000 6,000,000 good
>2m 1 1,200 1,200 100.00 10,000 12,000,000 good
>2m 2 1,200 1,200 100.00 10,000 12,000,000 good
>2m 2 800 800 100.00 10,000 8,000,000 good
>2m 2 250 250 100.00 10,000 2,500,000 good
>2m 2 400 400 100.00 10,000 4,000,000 good
>2m 1 200 200 100.00 10,000 2,000,000 good
>2m 2 250 250 100.00 10,000 2,500,000 good
>2m 2 230 230 100.00 10,000 2,300,000 good
>2m 2 1,800 1,800 100.00 10,000 18,000,000 good
>2m 2 700 700 100.00 10,000 7,000,000 good
>2m 3 3,000 3,000 100.00 10,000 30,000,000 good
>2m 3 233 233 100.00 10,000 2,330,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 2 520 520 100.00 10,000 5,200,000 good
>2m 2 900 900 100.00 10,000 9,000,000 good
>2m 2 300 300 100.00 10,000 3,000,000 good
>2m 1 800 800 100.00 10,000 8,000,000 good
>2m 3 1,856 10,000 18.56 10,000 18,560,000 good
>2m 4 896 896 100.00 10,000 8,960,000 good
>2m 2 68 68 100.00 10,000 680,000 good
>2m 2 5,504 5,504 100.00 10,000 55,040,000 good
>2m 2 600 600 100.00 10,000 6,000,000 good
>2m 2 1,100 1,100 100.00 10,000 11,000,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 2 48 48 100.00 10,000 480,000 good
1-2m 2 88 88 100.00 10,000 880,000 good
1-2m 2 42 42 100.00 10,000 420,000 good
1-2m 3 112 112 100.00 10,000 1,120,000 good
1-2m 1 300 300 100.00 10,000 3,000,000 good
>2m 6 90 90 100.00 10,000 900,000 good
>2m 3 264 264 100.00 10,000 2,640,000 good
>2m 5 130 130 100.00 10,000 1,300,000 good
>2m 3 48 48 100.00 10,000 480,000 good
>2m 1 128 128 100.00 10,000 1,280,000 good
1-2m 2 30 30 100.00 10,000 300,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 2 43 43 100.00 10,000 430,000 good
>2m 1 700 700 100.00 10,000 7,000,000 good
>2m 2 512 512 100.00 10,000 5,120,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 1 800 800 100.00 10,000 8,000,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 1 48 48 100.00 10,000 480,000 good
1-2m 1 48 48 100.00 10,000 480,000 good
1-2m 2 28 28 100.00 10,000 280,000 good
1-2m 1 64 64 100.00 10,000 640,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 1 200 200 100.00 10,000 2,000,000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 1 1,000 1,000 100.00 10,000 10,000,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 2 24 24 100.00 10,000 240,000 good
>2m 1 850 850 100.00 10,000 8,500,000 good
>2m 1 700 700 100.00 10,000 7,000,000 good
>2m 2 5,696 5,696 100.00 10,000 56,960,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 3 3,000 3,000 100.00 10,000 30,000,000 good
>2m 2 1,800 1,800 100.00 10,000 18,000,000 good
>2m 2 28 28 100.00 10,000 280,000 good
>2m 1 2,000 2,000 100.00 10,000 20,000,000 good
>2m 1 3,000 3,000 100.00 10,000 30,000,000 good
>2m 1 48 48 100.00 10,000 480,000 good
1-2m 1 50 75 66.67 10,000 500000 good
1-2m 1 48 48 100.00 10,000 480,000 good
1-2m 3 46 46 100.00 10,000 460,000 good
1-2m 3 832 832 100.00 10,000 8,320,000 good
1-2m 1 480 480 100.00 10,000 4,800,000 good
1-2m 1 48 48 100.00 10,000 480,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 1 256 256 100.00 10,000 2,560,000 good
>2m 1 300 300 100.00 10,000 3,000,000 good
1-2m 1 48 48 100.00 10,000 480,000 good
1-2m 2 3,000 3,000 100.00 10,000 30,000,000 good
1-2m 1 48 48 100.00 10,000 480,000 good
1-2m 1 48 48 100.00 10,000 480,000 good
1-2m 1 1,000 1,000 100.00 10,000 10,000,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 2 1,250 1,250 100.00 10,000 12,500,000 good
>2m 2 90 90 100.00 10,000 900,000 good
>2m 2 320 320 100.00 10,000 3,200,000 good
1-2m 1 480 480 100.00 10,000 4,800,000 good
1-2m 1 48 48 100.00 10,000 480,000 good
1-2m 2 7,168 7,168 100.00 10,000 71,680,000 good
>2m 2 450 450 100.00 10,000 4,500,000 good
>2m 2 600 600 100.00 10,000 6,000,000 good
>2m 2 42 42 100.00 10,000 420,000 good
1-2m 2 56 56 100.00 10,000 560,000 good
1-2m 2 50 50 100.00 10,000 500,000 good
1-2m 2 106 106 100.00 10,000 1,060,000 good
1-2m 3 1,792 1,792 100.00 10,000 17,920,000 good
1-2m 2 80 80 100.00 10,000 800,000 good
1-2m 4 45 45 100.00 10,000 450,000 good
1-2m 2 54 54 100.00 10,000 540,000 good
>2m 2 24 24 100.00 10,000 240,000 good
1-2m 1 48 48 100.00 10,000 480,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 4 3,000 3,000 100.00 10,000 30,000,000 good
>2m 1 300 300 100.00 10,000 3,000,000 good
>2m 4 2,816 2,816 100.00 10,000 28,160,000 good
1-2m 3 78 78 100.00 10,000 780,000 good
1-2m 3 896 896 100.00 10,000 8,960,000 good
1-2m 3 17,856 17,856 100.00 10,000 178,560,000 good
1-2m 3 832 832 100.00 10,000 8,320,000 good
1-2m 2 192 192 100.00 10,000 1,920,000 good
1-2m 3 293 293 100.00 10,000 2,930,000 good
1-2m 1 128 128 100.00 10,000 1,280,000 good
1-2m 1 896 896 100.00 10,000 8,960,000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 1 48 48 100.00 10,000 480,000 good
1-2m 1 1,600 1,600 100.00 10,000 16,000,000 good
1-2m 2 2,000 2,000 100.00 10,000 20,000,000 good
1-2m 6 128 128 100.00 10,000 1,280,000 good
1-2m 3 300 300 100.00 10,000 3,000,000 good
1-2m 1 50 75 66.67 10,000 500000 good
1-2m 2 30 30 100.00 10,000 300,000 good
1-2m 1 700 700 100.00 10,000 7,000,000 good
1-2m 1 480 480 100.00 10,000 4,800,000 good
1-2m `` 49 49 100.00 10,000 490,000 good
1-2m 2 79 79 100.00 10,000 790,000 good
1-2m 1 300 300 100.00 10,000 3,000,000 good
1-2m 1 2,200 2,200 100.00 10,000 22,000,000 good
1-2m 2 3,584 3,930 91.20 10,000 35,840,000 good
1-2m 1 128 128 100.00 10,000 1,280,000 good
1-2m 4 141 141 100.00 10,000 1,410,000 good
1-2m 3 74 74 100.00 10,000 740,000 good
1-2m 2 10 10 100.00 10,000 100,000 good
1-2m 2 64 64 100.00 10,000 640,000 good
>2m 2 26 26 100.00 10,000 260,000 good
>2m 2 72 72 100.00 10,000 720,000 good
1-2m 3 124 124 100.00 10,000 1,240,000 good
1-2m 2 22 22 100.00 10,000 220,000 good
1-2m 2 6 6 100.00 10,000 60,000 good
1-2m 1 48 48 100.00 10,000 480,000 good
1-2m 2 1,200 1,200 100.00 10,000 12,000,000 good
1-2m 3 1,200 1,200 100.00 10,000 12,000,000 good
1-2m 2 320 320 100.00 10,000 3,200,000 good
1-2m 2 600 600 100.00 10,000 6,000,000 good
1-2m 3 196 196 100.00 10,000 1,960,000 good
1-2m 1 700 700 100.00 10,000 7,000,000 good
1-2m 1 700 700 100.00 10,000 7,000,000 good
1-2m 1 192 192 100.00 10,000 1,920,000 good
1-2m 2 51 51 100.00 10,000 510,000 good
1-2m 3 64 64 100.00 10,000 640,000 good
1-2m 2 52 52 100.00 10,000 520,000 good
1-2m 1 500 500 100.00 10,000 5,000,000 good
1-2m 1 50 75 66.67 10,000 500000 good
1-2m 1 480 480 100.00 10,000 4,800,000 good
1-2m 1 200 200 100.00 10,000 2,000,000 good
>2m 3 76 76 100.00 10,000 760,000 good
1-2m 5 102 102 100.00 10,000 1,020,000 good
1-2m 2 56 56 100.00 10,000 560,000 good
1-2m 2 2,816 2,975 94.66 10,000 28,160,000 good
1-2m 2 28 28 100.00 10,000 280,000 good
1-2m 3 95 95 100.00 10,000 950,000 good
1-2m 1 700 700 100.00 10,000 7,000,000 good
1-2m 1 300 300 100.00 10,000 3,000,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 2 800 800 100.00 10,000 8,000,000 good
>2m 2 400 400 100.00 10,000 4,000,000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 6 76 76 100.00 10,000 760,000 good
>2m 2 300 300 100.00 10,000 3,000,000 good
>2m 2 300 300 100.00 10,000 3,000,000 good
>2m 3 72 72 100.00 10,000 720,000 good
>2m 1 3,000 3,000 100.00 10,000 30,000,000 good
1-2m 1 48 48 100.00 10,000 480,000 good
1-2m 3 2,100 2,100 100.00 10,000 21,000,000 good
1-2m 2 400 400 100.00 10,000 4,000,000 good
1-2m 2 2,200 2,200 100.00 10,000 22,000,000 good
1-2m 1 800 800 100.00 10,000 8,000,000 good
1-2m 2 400 400 100.00 10,000 4,000,000 good
1-2m 1 800 800 100.00 10,000 8,000,000 good
1-2m 2 800 800 100.00 10,000 8,000,000 good
1-2m 1 300 300 100.00 10,000 3,000,000 good
1-2m 2 300 300 100.00 10,000 3,000,000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 1 700 700 100.00 10,000 7,000,000 good
>2m 1 4,928 4,928 100.00 10,000 49,280,000 good
>2m 1 300 300 100.00 10,000 3,000,000 good
>2m 1 128 128 100.00 10,000 1,280,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 1 64 64 100.00 10,000 640,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 1 480 480 100.00 10,000 4,800,000 good
>2m 1 48 48 100.00 10,000 480,000 good
>2m 2 500 500 100.00 10,000 5,000,000 good
>2m 1 250 250 100.00 10,000 2,500,000 good
>2m 1 2,000 2,000 100.00 10,000 20,000,000 good
>2m 1 50 75 66.67 10,000 500000 good
>2m 1 50 75 66.67 10,000 500000 good
1-2m 1 48 48 100.00 10,000 480,000 good
1-2m 1 100 100 100.00 10,000 1,000,000 good
1-2m 1 50 75 66.67 10,000 500000 good
149,339 158,438 22,504 1,493,390,000
VULNERABILITY

Proportion of the Proportion of Year Constructed Employin Protected Capacity


structure in Structure Made of g Hazard by Mitigation Measures and
dilapidated/ Light Materials Resistant willingness
condemned Design to retrofit
Condition or to
relocate

if poor or fair ≤5% of Structure Before 1960s Yes or No ≤5% of Structure Refer to
≤5% of Structure >5 to10% of Structure Between >5 to10% of Structure notes
>5 to10% of Structure >10-20% of Structure >10-20% of Structure
≥20% of structure 1960-1991 ≥20% of structure below
>10-20% of Structure after 1991
≥20% of structure

≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A


≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure After 1991 Yes ≥20% of structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes >10-20% of Structure A
≤5% of Structure ≤5% of Structure 1960-1991 Yes ≥20% of structure A
RISK ADAPTIVE CA

Percentage of Severity Risk Risk Capacity Insurance Available


structures covered of Score Category and Coverage alternative
by property Conseque willingness sites
Insurance nce to retrofit
Score_ or relocate

≤5% of Structure AVERAGE score SC X Low-High


>5 to10% of Structure SENSITIVITY Likelihood
>10-20% of Structure of
≥20% of structure Occurrence
See Annex K

≤5% of Structure 50 4 16 High Risk 50 50


≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 50 3 18 High Risk 50 100
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 75 4 16 High Risk 50 100
≥20% of structure 75 4 16 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 75 4 16 High Risk 50 50
≥20% of structure 75 4 16 High Risk 50 100
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 75 3 12 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 100
≤5% of Structure 75 2 12 High Risk 50 50
≥20% of structure 75 4 24 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≥20% of structure 75 4 24 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 75 4 16 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 75 4 24 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 3 18 High Risk 50 100
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 50 3 18 High Risk 50 100
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 75 3 12 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 75 3 12 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 3 12 High Risk 50 50
≥20% of structure 50 4 16 High Risk 50 50
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 75 3 12 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≥20% of structure 50 3 12 High Risk 50 100
≥20% of structure 50 3 12 High Risk 50 100
≤5% of Structure 50 4 16 High Risk 50 50
≥20% of structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 75 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 75 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 75 4 24 High Risk 50 50
≥20% of structure 50 3 18 High Risk 50 100
≥20% of structure 50 3 18 High Risk 50 100
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≤5% of Structure 75 4 24 High Risk 50 50
≤5% of Structure 50 4 24 High Risk 50 50
≥20% of structure 75 4 24 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 75 3 18 High Risk 50 50
≤5% of Structure 50 4 16 High Risk 50 50
≤5% of Structure 75 4 16 High Risk 50 50
≤5% of Structure 75 3 12 High Risk 50 50

A. The owner or concerned administrator has a plan, capacity and


B. The owner or concerned administrator has the capacity to retr
C. The owner or concerned administrator has the capacity to retrofit
D. No capacity to retrofit
ADAPTIVE CAPACITY

Available Government Access to AVERAGE ADOPTIVE


alternative investments infrastructure CAPACITY
structures related
mitigation
measures

100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 66.67
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 66.67
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 83.33
100 66.67
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 66.67
100 66.67
100 83.33
100 66.67
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 66.67
100 66.67
100 83.33
100 83.33
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 83.33
100 83.33
100 66.67
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 66.67
100 66.67
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 83.33
100 66.67
100 83.33
100 83.33
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67
100 66.67

tor has a plan, capacity and willingness to retrofit


ator has the capacity to retrofit but no plans yet
has the capacity to retrofit but noy willing to retrofit
capacity to retrofit
Tab3.4.3 Critical point facilities database and risk to SURGE by barangay and by susceptibility
HAZARD
Barangay Production Area Susceptibilit Likelihood Expected
Category y/ Magnitude of Depth
Occurrence
Score

Agriculture, Low, Anecdotal ≤1m for


Fishpond, Moderate, Account moderate
Production Forest High See Annex J and Low
≤1m for high

2 93 Bagacay Agricultural Moderate 4 1-2m


3 93 Bagacay Agricultural High 6 above 2m
5 94 Tigbao Agricultural Moderate 4 1-2m
6 94 Tigbao Agricultural High 6 above 2m
8 97 Cabalawan Agricultural Moderate 4 1-2m
9 97 Cabalawan Agricultural High 6 above 2m
11 99 Diit Agricultural Moderate 4 1-2m
12 99 Diit Agricultural High 6 above 2m
14 101 New Kawayan Agricultural Moderate 4 1-2m
15 101 New Kawayan Agricultural High 6 above 2m
17 102 Old Kawayan Agricultural Moderate 4 1-2m
18 102 Old Kawayan Agricultural High 6 above 2m
20 105 San Isidro Agricultural Moderate 4 1-2m
21 105 San Isidro Agricultural High 6 above 2m
23 106 Sto. Nino Agricultural Moderate 4 1-2m
24 106 Sto. Nino Agricultural High 6 above 2m
26 108 Tagpuro Agricultural Moderate 4 1-2m
27 108 Tagpuro Agricultural High 6 above 2m
28 97 Cabalawan Fishpond High 6 above 2m
EXPOSURE
Total Dominant Utilization Average Affected Affected
Barangay output per Area Value (PHP)
Area hectare (PHP) (Hectares)
Allocation

Total Crops, Livestock, Fishpond Average


agricultural (Specify what type of crops) output/ha X
area in a affected area
given
barangay

- 3.90 663,000
- 5.75 977,500
- 1.35 878,850
- 3.08 2,005,080
- 6.56 1,508,800
- 18.27 4,202,100
- 4.72 1,463,200
- 10.99 3,406,900
- 4.11 904,200
- 13.95 3,069,000
- 4.51 1,623,600
- 6.01 2,163,600
- 15.07 2,260,500
- 43.88 6,582,000
- 1.94 620,800
- 9.69 3,100,800
- 29.87 4,181,800
- 20.25 2,835,000
17.63 Bangus 28,250 17.63 498,054
222 42,944,784
VULNE
Exposure Total Percenta % of thru Average Proportion of
Percentage Number ge of affected Commun Percentag Dependent HHs
of Depende areas with al water e employing
Depende nt HHs irrigation irrigation sustainable
nt HHs or production
or Families techniques
Families to
to affected
Total brgy affected areas Thru water water
agricultural areas impounding impoundin
area ÷ affected system g+
area x 100 communal
water
irrigation÷
2
1.78 100 None None None 75
2.63 100 None None None 75
17.31 100 None None None 75
39.49 100 None None None 75
3.83 100 None None None 75
10.67 100 None None None 75
3.80 100 None None None 75
8.85 100 None None None 75
2.36 100 None None None 75
8.01 100 None None None 75
4.42 100 None None None 75
5.89 100 None None None 75
5.65 100 None None None 75
16.44 100 None None None 75
1.47 100 None None None 75
7.37 100 None None None 75
12.74 100 None None None 75
8.64 100 None None None 75
100.00 100 None None None 75
VULNERABILITY
Proportion of Percentage of seawall flood Average Percentag Percentage of
Dependent HHs affected areas control Percentag e of Dependent
with access to covered or e Affected Population
alternative protected by areas who attended
livelihood hazard covered climate field
mitigation by school
measures insurance
system
production production
areas with slope areas
protection w/slope
protection
+seawall+f
lood
contro÷ 3
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
50 None None None None 100 50
RISK ADAPTIVE CAP
Percentage AVERAGE Severity Risk Risk Access Agricultural
of Farmers SENSITIVIT of Score Category to Crop Extension
with access Y Conseque Insuranc Services of the
to hazard nce e Local
information Average Government
Score

See Annex See


C,G,H Annex K

75 75.00 3 12 High Risk Area 100 100


75 75.00 3 18 High Risk Area 100 100
75 75.00 3 12 High Risk Area 100 100
75 75.00 3 18 High Risk Area 100 100
75 75.00 3 12 High Risk Area 100 100
75 75.00 3 18 High Risk Area 100 100
75 75.00 3 12 High Risk Area 100 100
75 75.00 3 18 High Risk Area 100 100
75 75.00 3 12 High Risk Area 100 100
75 75.00 3 18 High Risk Area 100 100
75 75.00 3 12 High Risk Area 100 100
75 75.00 3 18 High Risk Area 100 100
75 75.00 3 12 High Risk Area 100 100
75 75.00 3 18 High Risk Area 100 100
75 75.00 3 12 High Risk Area 100 100
75 75.00 3 18 High Risk Area 100 100
75 75.00 3 12 High Risk Area 100 100
75 75.00 3 18 High Risk Area 100 100
75 75.00 3 18 High Risk Area 100 100
ADAPTIVE CAPACITY
Alternative Government AVERAGE
Livelihood Resources ADOPTIVE
CAPACITY

50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5
50 100 87.5

Vous aimerez peut-être aussi