Base Oil Project (ex-Facto Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17
Monthly Volume Base Oil (liter) 30,000 30,000 30,000 30,000 150,000 150,000 150,000 150,000 150,000
Sales Projection (RM1.95) 58,500 58,500 58,500 58,500 292,500 292,500 292,500 292,500 292,500
Direct Cost:
Feedstock (RM0.45) 18,000 18,000 18,000 18,000 90,000 90,000 90,000 90,000 90,000
Processing Cost (RM0.40) 16,000 16,000 16,000 16,000 80,000 80,000 80,000 80,000 80,000
Rental Premise 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000
0 0 0 0 0 0 0 0 0
Overhead cost:
Total Cost 40,000 40,000 40,000 40,000 176,000 176,000 176,000 176,000 176,000
68% 68% 68% 68% 60% 60% 60% 60% 60%
Gross Profit 18,500 18,500 18,500 18,500 116,500 116,500 116,500 116,500 116,500
32% 32% 32% 32% 40% 40% 40% 40% 40%
Notes:
Recycle HDPE Resin Production (kg) 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000
Sales Projection (RM2.80) 420,000 420,000 420,000 420,000 420,000 420,000 420,000 420,000 420,000
Direct Cost:
Cost of HDPE Waste Plastic (RM1.12) 168,000 168,000 168,000 168,000 168,000 168,000 168,000 168,000 168,000
AP (RM0.36) 54,000 54,000 54,000 54,000 54,000 54,000 54,000 54,000 54,000
Salary (RM0.10) 15,500 15,500 15,500 15,500 15,500 15,500 15,500 15,500 15,500
pre-Production and Utilities (RM0.15) 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500
Factory rental 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000
Inward Transportation (RM0.20) 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000
Overhead cost:
0 0 0 0 0 0 0 0 0
Total Cost 297,000 297,000 297,000 297,000 297,000 297,000 297,000 297,000 297,000
71% 71% 71% 71% 71% 71% 71% 71% 71%
Gross Profit 123,001 123,001 123,001 123,001 123,001 123,001 123,001 123,001 123,001
29% 29% 29% 29% 29% 29% 29% 29% 29%
Notes:
1.Feedstock price range USD280 per 4. Investment on Palletizing Machinery RM25,000-RM75,000 per line 7. pre-Production = running of Crusher and W
tonne
2. USD1=RM4.00 5. Capacity 3.5 ton per line fo efficiency and easy maintainace 8. Utilities = Electricity and Water
3. Feedstock price RM1.12 per 6. Selling Price RM2.80-RM3.00 9. AP cost RM1800.00 per container 5 ton
kg
SYNGAS SDN BHD
6,800 0 0 0 0 0 0 0 0
Base Oil
200,000
SYNGAS SDN BHD
140,000
6,800 0 0 0 0 0 0 0 0
When you change the
fiscal year start date,
the headings in row 6
update automatically.
6,600
0
0
0
0
0
0
0
200
0
0 0 0 6,800
0
0
0
0
0
0
0
0 0 0 0
200,000
When you change the
140,000 fiscal year start date,
0 the headings in row 6
update automatically.
0
0 0 0 340,000
6,600
0
0
0
0
0
0
0
200
0
0 0 0 6,800
Syngas Sdn Bhd Projected Cashflow
SYNGAS SDN BHD
Recycle HDPE Resin Production (kg) 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000
Sales Projection (RM2.80) 420,000 420,000 420,000 420,000 420,000 420,000 420,000 420,000 420,000
Direct Cost:
Cost of HDPE Waste Plastic (RM1.12) 168,000 168,000 168,000 168,000 168,000 168,000 168,000 168,000 168,000
AP (RM0.36) 54,000 54,000 54,000 54,000 54,000 54,000 54,000 54,000 54,000
Inward Transportation (RM0.20) 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000
Sub-Contract Cost (RM0.80) 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
Overhead cost:
0 0 0 0 0 0 0 0 0
Total Cost 372,000 372,000 372,000 372,000 372,000 372,000 372,000 372,000 372,000
89% 89% 89% 89% 89% 89% 89% 89% 89%
Gross Profit 48,000 48,000 48,000 48,000 48,000 48,000 48,000 48,000 48,000
11% 11% 11% 11% 11% 11% 11% 11% 11%
Notes:
1.Feedstock price range USD280 per 4. Sub-contracting cost RM0.80 per kg (ex-factory)
tonne
2. USD1=RM4.00 5. Selling Price RM2.80-RM3.00
3. Feedstock price RM1.12 per 6. AP cost RM1800.00 per container 5 ton
kg
Syngas Sdn Bhd Projected Cashflow
SYNGAS SDN BHD
6,800 0 0 0 0 0 0 0 0
Base Oil
Syngas Sdn Bhd Projected Cashflow
SYNGAS SDN BHD
200,000
140,000
6,800 0 0 0 0 0 0 0 0
When you change the
fiscal year start date,
the headings in row 6
update automatically.
Jun-17 Jul-17 Aug-17 Total
0 0 0 0
0 0 0 0
0
0
0 0 0 0
372,000 372,000 372,000 4,464,000
89% 89% 89%
6,600
0
0
0
0
0
0
0
200
0
0 0 0 6,800
0
0
0
0
0
0
0
0 0 0 0
When you change the
200,000 fiscal year start date,
140,000 the headings in row 6
update automatically.
0
0
0 0 0 340,000
6,600
0
0
0
0
0
0
0
200
0
0 0 0 6,800
Syngas Sdn Bhd Projected Cashflow