Gas Absorption:

 Table (between GA and Dist) setup (Post-Distillation Column installation???)


o By end of next week before start of term.
 Laptop setup and install CO2 probes
o Test by Wednesday… Will not be installed until the table is set up.
 Check GC needle inventory (Is there a GA storage box?)
o We used BD 1mL syringe last time. Out of stock!
o Could find 1mL Norm-Ject syringe (75 syringes available)
o No needles available though. We used BD PrecisionGlide Needle (25G x
1) (0.5mm x 25mm) last time

CO2 Probe (Review SOP to keep the probes dry)

Add line about contacting Lab engineers

Batch Distillation:

 Setup all glassware and sensors

 Setup all electronics (mantle control, laptop, MiniGC, and cables)


o Started setting up batch distillation. Will be done by Tuesday. Where
shall we move all the boxes?

Miscellaneous:

 Team discussion on water pulls on east wall (esp. Andy, Phil, John, PJ)

Keys to Tanner and Rebecca